FATIMA HEIGHTS
RG-MH-23860 · RERA P51900001563 · Last updated on MahaRERA portal: 16 Jun 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 37 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
FATIMA HEIGHTS is a Residential / Group Housing project by M K ENTERPRISES in 400008, registered with MahaRERA as P51900001563 on 28 Jul 2017. Possession is promised by 31 Jan 2027. The completion date has moved by 37 months from the original filing. 366 of the 1,052 units on this registration are recorded sold or booked, and 57 of 88 construction stages are filed complete.
At a glance
Project
- NameFATIMA HEIGHTS
- TypeResidential / Group Housing
- Location
- IMAMWADA ROAD
- 400008
- Pincode400008
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900001563
- ReraGenie IDRG-MH-23860
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on28 Jul 2017
- Promised completion31 Jan 2027
- Revised completionRevised to 31 Jan 2027 (originally 4 Dec 2023)
- Buildings8 building records
- Documents filed162 files
Current status
Figures as on 16 Jun 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| FATIMA HEIGHTS - SALE | NA | 43 | 42 | 395 | 0 | 395 |
| WING C - REHAB - SHREE LAXMINARAYAN CHS LTD | NA | 24 | 23 | 133 | 0 | 133 |
| WING D -REHAB -SHREE LAXMINARAYAN CHS LTD | NA | 24 | 23 | 134 | 0 | 134 |
| WING E -REHAB | NA | 25 | 0 | 0 | 0 | 0 |
| WING A -REHAB - KGN CHS LTD | NA | 24 | 23 | 134 | 0 | 134 |
| WING B - REHAB | NA | 14 | 13 | 100 | 0 | 100 |
| WING F -REHAB | NA | 9 | 0 | 0 | 0 | 0 |
| WING G -REHAB - BAITULAMAN CHS LTD | NA | 24 | 23 | 156 | 0 | 156 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building8
As on 16 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
57 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Stilt Floor, at 95%.
FATIMA HEIGHTS - SALE99%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 95% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
WING C - REHAB - SHREE LAXMINARAYAN CHS LTD89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 75% |
WING D -REHAB -SHREE LAXMINARAYAN CHS LTD91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING E -REHAB0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING A -REHAB - KGN CHS LTD91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING B - REHAB90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
WING F -REHAB0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING G -REHAB - BAITULAMAN CHS LTD91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 16 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 65% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 90% |
| Solid Waste Management And Disposal | Yes | 90% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 20% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed8
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| FATIMA HEIGHTS - SALE | 1 | 1 |
| WING C - REHAB - SHREE LAXMINARAYAN CHS LTD | 1 | 1 |
| WING D -REHAB -SHREE LAXMINARAYAN CHS LTD | 1 | 1 |
| WING E -REHAB | 1 | 1 |
| WING A -REHAB - KGN CHS LTD | 1 | 1 |
| WING B - REHAB | 1 | 1 |
| WING F -REHAB | 1 | 1 |
| WING G -REHAB - BAITULAMAN CHS LTD | 1 | 1 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AMIR MAREDIA |
| Architect | BN Shah |
| Engineer | HANWARE CONSULTANTS |
| Chartered Accountant | AP and Co |
| Chartered Accountant | S.H Modi & Associates |
| Partner | Role in project |
|---|---|
| M K ENTERPRISES | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe seek extension in project since the work has started prior to outbreak of COVID-19, which had an impact on real estate project for nearly 2 years, from March 2020 to February 2022 which has severely impacted the availability of labor and disrupted the supply chain, causing significant delays in the construction activities. This has resulted in slow progress in construction. Hence we request you to grant us the extension.
Reason as filed by the promoterThe project was started prior to outbreak of COVID-19, which had an impact on real estate project for nearly 2 years, from March 2020 to February 2022 which has severely impacted the availability of labor and disrupted the supply chain, causing significant delays in the construction activities. This has resulted in slow progress in construction. However we are trying to complete the project at the earliest. Kindly process our application and grant us the extension till 31-01-2027. We hereby submit this application seeking an extension of the project under section 7 (3) of Maharera.
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 2704/2014/2014 | CITY CIVIL COURT | ON GOING |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Oct 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Oct 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Jan 2027
Documents filed162
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 162 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM 1 31-03-2025.pdf | 16 Jun 2025 |
| Form 2File: FORM 2 31-03-2025.pdf | 16 Jun 2025 |
| Form 3File: FORM 3 31-03-2025.pdf | 16 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold - 31-03-2025.pdf | 16 Jun 2025 |
| Form 1File: Form 1 March 24.pdf | 16 Jun 2025 |
| Form 2File: Form 2 March 24.pdf | 16 Jun 2025 |
| Form 3File: Form 3 March 24.pdf | 16 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold Inventory Marc 2024.pdf | 16 Jun 2025 |
| Form 1File: Form 1 Sept 24.pdf | 16 Jun 2025 |
| Form 2File: Form 2 Sep 24.pdf | 16 Jun 2025 |
| Form 3File: Form 3 Sep 24.pdf | 16 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold Inventory Sep 2024.pdf | 16 Jun 2025 |
| Certificates of CA (Form 3)File: Fatima Heights - Form 3 - Dec 2024 With Units Summary (1)_compressed.pdf | 15 Feb 2025 |
| Declaration about Commencement CertificateFile: Declaration of Commencement Certificate Format - D of Fatima Heights (1).pdf | 15 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Fatima Heights - Form 1 - Dec 2024.pdf | 7 Feb 2025 |
| Certificates of CA (Form 3)File: Fatima Heights - Form 3 - Dec 2024_compressed.pdf | 7 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Fatima Heights - Form 2 - Dec 2024.pdf | 7 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Revalidated CC.pdf | 7 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Fatima Heights - Sold-Unsold - 31-12-2024.pdf | 7 Feb 2025 |
| Declaration about Commencement CertificateFile: Fatima Heights - Declaration of CC - Format D.pdf | 7 Feb 2025 |
| Proforma of Allotment letterFile: Model Allotment.pdf | 10 Jan 2025 |
| Declaration in FORM BFile: Form B Affidavit.pdf | 10 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 24.pdf | 10 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sept 24.pdf | 10 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 March 24.pdf | 10 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Sep 24.pdf | 10 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 24.pdf | 10 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 24.pdf | 10 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold unsold Inventory Marc 2024.pdf | 10 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold unsold Inventory Sep 2024.pdf | 10 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration of seperate bank account Farima Heights.pdf | 10 Jan 2025 |
| Deviation Report with respect to Allotment letterFile: No Deviation in allotment letter Fatima Heights.pdf | 10 Jan 2025 |
| Deviation Report with respect to model copy of AgreementFile: No deviation in Agreement for sale Fatima Heights.pdf | 10 Jan 2025 |
| Proforma of Agreement for saleFile: AFS.pdf | 10 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disc of Interest.pdf | 10 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 A Quality Assurance Cert Fatima Heights FY 2023 2024.pdf | 10 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Fatima Heights FY 2023 2024.pdf | 10 Jan 2025 |
| Declaration in FORM BFile: Form B Affidavit cum Declaration.pdf | 27 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Exhibit A Form 1 Architect Certificate sep 23.pdf | 27 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engg's Certificate sep 23.pdf | 27 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 A - Quality Assurance Certificate as on mar 23.pdf | 27 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A - Quality Assurance Certificate as on mar 23.pdf | 27 Dec 2023 |
| CERSAI detailsFile: Disclosure of Sold- Unsold Inventory of Fatima Heights dated Sep 23.pdf | 27 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3 September 2023.pdf | 27 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2022-23.pdf | 27 Dec 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC of Sale Bldg.pdf | 19 Sep 2023 |
| Certificates of CA (Form 3)File: Form 3 MK ENT Dec 2022.pdf | 19 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Archiitect Certificate Mar 2022.pdf | 2 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate June 2022.pdf | 2 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Sep 2022.pdf | 2 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Dec 2022.pdf | 2 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eng Cert Mar 2022.pdf | 2 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eng Cert June 2022.pdf | 2 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eng Cert Sep 2022.pdf | 2 Mar 2023 |
| Certificates of CA (Form 3)File: form 3 MK ENT Mar 2022.pdf | 14 Feb 2023 |
| Certificates of CA (Form 3)File: form 3 MK ENT June 2022.pdf | 14 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3 MK ENT Sep 2022.pdf | 14 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 MK ENT as on Mar 2022.pdf | 14 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure Sold Unsold Inventory as on 30 Sept 2022.pdf | 28 Oct 2022 |
| Layout approvalFile: Layout.pdf | 14 Oct 2022 |
| Building plan approvalFile: Bldg plan 1.pdf | 14 Oct 2022 |
| Building plan approvalFile: Bldg plan 2.pdf | 14 Oct 2022 |
| Building plan approvalFile: Bldg plan 3.pdf | 14 Oct 2022 |
| Building plan approvalFile: Bldg plan 4.pdf | 14 Oct 2022 |
| Building plan approvalFile: Bldg plan 5.pdf | 14 Oct 2022 |
| Building plan approvalFile: Bldg plan 6.pdf | 14 Oct 2022 |
| Building plan approvalFile: Bldg plan 7.pdf | 14 Oct 2022 |
| Building plan approvalFile: Bldg plan 8.pdf | 14 Oct 2022 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 14 Oct 2022 |
| Building Plan Approval (IOD)File: Bldg plan 1.pdf | 14 Oct 2022 |
| Building Plan Approval (IOD)File: Bldg plan 2.pdf | 14 Oct 2022 |
| Building Plan Approval (IOD)File: Bldg plan 3.pdf | 14 Oct 2022 |
| Building Plan Approval (IOD)File: Bldg plan 4.pdf | 14 Oct 2022 |
| Building Plan Approval (IOD)File: Bldg plan 5.pdf | 14 Oct 2022 |
| Building Plan Approval (IOD)File: Bldg plan 6.pdf | 14 Oct 2022 |
| Building Plan Approval (IOD)File: Bldg plan 7.pdf | 14 Oct 2022 |
| Building Plan Approval (IOD)File: Bldg plan 8.pdf | 14 Oct 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Fatima Heights - CC.pdf | 14 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold booked Inventory of Fatima Heights as on 31122021.pdf | 14 Oct 2022 |
| Details of encumbrances concerned to LegalFile: Declaration of Encumberances.pdf | 23 Sep 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 162 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep FATIMA HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near this project
Filed coordinates, straight-line distance. 59 registered projects within 2 km.
Nexsa Sky Vista
D.K. REALTORS & DEVELOPERS LIMITED
Lakadawala Garden
M/s. Lakadawala Developers Pvt. Ltd.
La Mer Residences
EXCELLENT REALTOR DEVELOPERS
Godrej Avenue Eleven - Tower A
GODREJ RESIDENCY PRIVATE LIMITED
FUEGO
HILTON INFRASTRUCTURE
AJMAL-235
AWFI REAL ESTATE PRIVATE LIMITED
Builder: M K ENTERPRISES
M K ENTERPRISES has 6 registrations on MahaRERA, including FATIMA HEIGHTS and Kashmiri Heights. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record.
Frequently asked questions
What are my rights if FATIMA HEIGHTS is delayed beyond 31 Jan 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of FATIMA HEIGHTS?
The registered promoter entity is M K ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in FATIMA HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for FATIMA HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at FATIMA HEIGHTS?
The professionals named in the filing: Architect: AMIR MAREDIA; Architect: BN Shah; Engineer: HANWARE CONSULTANTS; Chartered Accountant: AP and Co; Chartered Accountant: S.H Modi & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in FATIMA HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback