Home / Browse projects / Pune, Maharashtra / Ekdant Hights

Registered No litigation declared Others project

Ekdant Hights

By Xpanz Buildcon

RG-MH-17232 · RERA P52100028356 · Last updated on MahaRERA portal: 17 Dec 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 36 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 80%
30 of 38Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

Ekdant Hights is a Others project by Xpanz Buildcon in Pune, Maharashtra, registered with MahaRERA as P52100028356 on 18 Feb 2021. Possession is promised by 29 Dec 2027. The completion date has moved by 36 months from the original filing. 8 of the 38 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameEkdant Hights
  • TypeOthers
  • Location
    • Pimple Saudagar
    • Pimpale Saudagar
    • Haveli
    • Pune
    • 411027
  • Pincode411027
  • RERA no.P52100028356
  • ReraGenie IDRG-MH-17232

Builder

  • NameXpanz Buildcon
  • Entity typePartnership
  • PartnersNandkumar Kondiba Bhalekar, Akash Yuvraj Jawade

Key dates

this monthRegisteredFeb 2021First promiseDec 2024Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Feb 2021
  • Promised completion29 Dec 2027
  • Revised completionRevised to 29 Dec 2027 (originally 30 Dec 2024)
  • Buildings1 building record
  • Documents filed73 files

Current status

21%8 of 38 units booked
75.2%Work done, per cost certificate

Figures as on 17 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ekdant HightsNA87221638

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.

Ekdant Hights: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Closed/Covered6

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area612 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Dec 2025
LandownerVillageDistrict
Nilesh Vasant JagtapPimpale SaudagarPune
Pranay Sanjay JagtapPimpale SaudagarPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI1063.44
Proposed, not sanctioned1,063 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOmkar Plaza, G-Block, MIDC, Near Thermax Chowk, Pimpri Chinchwad, Pune - 411019
Estimated costRs 3.35 cr
Cost incurredRs 2.52 cr
Work done75.19%
BuildingWingEstimatedIncurred
Ekdant HightsNARs 2.85 crRs 1.46 cr
-NARs 50.00 lakhRs 1.06 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAAPT Studio - Dhiraj Takkekar
ArchitectHrushikesh Deore
EngineerTushar Gulabrao Kalbhor
EngineerVijay Dattatraya Gholap
Chartered AccountantNPSR & Associates - CA. Vivek Lahoti
Chartered AccountantPrajakta V Wable
PartnerRole in project
Xpanz Buildcon-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100026073Dec 2024 → Dec 2027

Reason as filed by the promoterWith reference to above, the undersigned hereby humbly submits to the Hon”ble chairperson as under- 1) Pimpri Chinchwad Municipal Corporation have given us commencement certificate for construction of subjected project on 15/10/2020. 2) However, due to lock down of COVID 19 we have started construction work from July, 2022. 3) We humbly bring to your kind notice that, due to Covid 19 availability of workers was very difficult as most of the workers had been to their native places. We were compelled to avail the workers by paying them higher wages. 4) Raw material for project construction was a

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Feb 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Feb 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Feb 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Feb 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 29 Dec 2027

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_30062025.pdf17 Dec 2025
Withdrawal Update Form 1File: Form 1_30092025.pdf17 Dec 2025
Withdrawal Update Form 2File: Form 2_30062025_Final_compressed.pdf17 Dec 2025
Withdrawal Update Form 2File: Form 2_30092025_Final_compressed.pdf17 Dec 2025
Withdrawal Update Form 3File: Form 3_30062025_compressed.pdf17 Dec 2025
Withdrawal Update Form 3File: Form 3_30092025_compressed.pdf17 Dec 2025
Declaration in FORM BFile: P52100028356_FileName_1.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 -SEP-2024.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM1-DEC-2024.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect letter_20250418_132512.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM3 SEP-2024.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM3 DEC-2024.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_31032025.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_30092023.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_31032025.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_31122024.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_30092024.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_30062024.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_31032024.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_31122023.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_30062023.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_31032023.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_31122022.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_30092022.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_30062022.pdf24 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) .pdf24 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD Letter 31032025.pdf24 Apr 2025
Declaration about Commencement CertificateFile: RERA DORMATE-D.pdf24 Apr 2025
Other - TechnicalFile: RERA EXTAINSION LETTER -XPANZ BUILDCON.pdf24 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A_31032023.pdf24 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A_31032024.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE RERA -07-10-2022.pdf5 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE RERA -09-01-2023.pdf5 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE RERA -06-04-2023.pdf5 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE 08-07-2023.pdf5 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE 05-10-2023.pdf5 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITEH CERTIFICATE RERA 07-01-2024.pdf5 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE RERA 06-04-2024.pdf5 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFIFATE -RERA -06-07-2024.pdf5 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE RERA -05-07-2022.pdf5 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_30092022.pdf5 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_30062024.pdf5 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_31032024.pdf5 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_31122023.pdf5 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_30092023.pdf5 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_30062023.pdf5 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_30032023.pdf5 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_31122022.pdf5 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_30062022.pdf5 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_22_23.pdf5 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_23_24.pdf5 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (2)_compressed.pdf5 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2 A.pdf5 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Ekdant Heights- Form 5.pdf18 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arcitect certificate.pdf11 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Xpanz - CA Certificate (Form 5)_compressed.pdf1 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate (Form 2).pdf10 Feb 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3.pdf8 Feb 2021
Copy of the legal title reportFile: Search Title 356 2018-compressed.pdf5 Feb 2021
Copy of the legal title reportFile: Search Title 365 2018-compressed.pdf5 Feb 2021
Copy of the legal title reportFile: Search Title 356 2019-compressed.pdf5 Feb 2021
Copy of the legal title reportFile: Search Title 365 2019-compressed.pdf5 Feb 2021
Layout approvalFile: Layout-compressed.pdf3 Feb 2021
Building plan approvalFile: IOD-compressed.pdf3 Feb 2021
PAN CardFile: PAN.pdf3 Feb 2021
Details of encumbrancesFile: Encumberances.pdf3 Feb 2021
Copy of Layout Approval (in case of layout)File: Layout-compressed.pdf3 Feb 2021
Building Plan Approval / NA Order for plotted developmentFile: IOD-compressed.pdf3 Feb 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf3 Feb 2021
Declaration in FORM BFile: Form B-compressed.pdf3 Feb 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (Form 1)-compressed.pdf3 Feb 2021
Proforma of Allotment letterFile: Agreement to Sale.pdf3 Feb 2021
Proforma of Allotment letterFile: Proforma Allotment Letter-compressed.pdf3 Feb 2021

How this compares with Pune

21%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 36 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ekdant Hights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pimple Saudagar13,700+ in Pune

Builder: Xpanz Buildcon

Xpanz Buildcon has 1 registration on MahaRERA, including Ekdant Hights. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Ekdant Hights is delayed beyond 29 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ekdant Hights?

The registered promoter entity is Xpanz Buildcon, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ekdant Hights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ekdant Hights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ekdant Hights?

The professionals named in the filing: Architect: AAPT Studio - Dhiraj Takkekar; Architect: Hrushikesh Deore; Engineer: Tushar Gulabrao Kalbhor; Engineer: Vijay Dattatraya Gholap; Chartered Accountant: NPSR & Associates - CA. Vivek Lahoti; Chartered Accountant: Prajakta V Wable. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ekdant Hights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ekdant Hights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ekdant Hights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.