Home / Browse projects / Pune, Maharashtra / Ekdant Hights
Ekdant Hights
RG-MH-17232 · RERA P52100028356 · Last updated on MahaRERA portal: 17 Dec 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 36 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Ekdant Hights is a Others project by Xpanz Buildcon in Pune, Maharashtra, registered with MahaRERA as P52100028356 on 18 Feb 2021. Possession is promised by 29 Dec 2027. The completion date has moved by 36 months from the original filing. 8 of the 38 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameEkdant Hights
- TypeOthers
- Location
- Pimple Saudagar
- Pimpale Saudagar
- Haveli
- Pune
- 411027
- Pincode411027
- RERA no.P52100028356
- ReraGenie IDRG-MH-17232
Builder
- NameXpanz Buildcon
- Entity typePartnership
- PartnersNandkumar Kondiba Bhalekar, Akash Yuvraj Jawade
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on18 Feb 2021
- Promised completion29 Dec 2027
- Revised completionRevised to 29 Dec 2027 (originally 30 Dec 2024)
- Buildings1 building record
- Documents filed73 files
Current status
Figures as on 17 Dec 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Ekdant Hights | NA | 8 | 7 | 22 | 16 | 38 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.
Ekdant Hights: 59% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 30% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 25% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed6
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Nilesh Vasant Jagtap | Pimpale Saudagar | Pune |
| Pranay Sanjay Jagtap | Pimpale Saudagar | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Ekdant Hights | NA | Rs 2.85 cr | Rs 1.46 cr |
| - | NA | Rs 50.00 lakh | Rs 1.06 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AAPT Studio - Dhiraj Takkekar |
| Architect | Hrushikesh Deore |
| Engineer | Tushar Gulabrao Kalbhor |
| Engineer | Vijay Dattatraya Gholap |
| Chartered Accountant | NPSR & Associates - CA. Vivek Lahoti |
| Chartered Accountant | Prajakta V Wable |
| Partner | Role in project |
|---|---|
| Xpanz Buildcon | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWith reference to above, the undersigned hereby humbly submits to the Hon”ble chairperson as under- 1) Pimpri Chinchwad Municipal Corporation have given us commencement certificate for construction of subjected project on 15/10/2020. 2) However, due to lock down of COVID 19 we have started construction work from July, 2022. 3) We humbly bring to your kind notice that, due to Covid 19 availability of workers was very difficult as most of the workers had been to their native places. We were compelled to avail the workers by paying them higher wages. 4) Raw material for project construction was a
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Feb 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Feb 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Feb 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Feb 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 29 Dec 2027
Documents filed73
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1_30062025.pdf | 17 Dec 2025 |
| Withdrawal Update Form 1File: Form 1_30092025.pdf | 17 Dec 2025 |
| Withdrawal Update Form 2File: Form 2_30062025_Final_compressed.pdf | 17 Dec 2025 |
| Withdrawal Update Form 2File: Form 2_30092025_Final_compressed.pdf | 17 Dec 2025 |
| Withdrawal Update Form 3File: Form 3_30062025_compressed.pdf | 17 Dec 2025 |
| Withdrawal Update Form 3File: Form 3_30092025_compressed.pdf | 17 Dec 2025 |
| Declaration in FORM BFile: P52100028356_FileName_1.pdf | 24 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 -SEP-2024.pdf | 24 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM1-DEC-2024.pdf | 24 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect letter_20250418_132512.pdf | 24 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM3 SEP-2024.pdf | 24 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM3 DEC-2024.pdf | 24 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_31032025.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_30092023.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_31032025.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_31122024.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_30092024.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_30062024.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_31032024.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_31122023.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_30062023.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_31032023.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_31122022.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_30092022.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_30062022.pdf | 24 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) .pdf | 24 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD Letter 31032025.pdf | 24 Apr 2025 |
| Declaration about Commencement CertificateFile: RERA DORMATE-D.pdf | 24 Apr 2025 |
| Other - TechnicalFile: RERA EXTAINSION LETTER -XPANZ BUILDCON.pdf | 24 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A_31032023.pdf | 24 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A_31032024.pdf | 24 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE RERA -07-10-2022.pdf | 5 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE RERA -09-01-2023.pdf | 5 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE RERA -06-04-2023.pdf | 5 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE 08-07-2023.pdf | 5 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE 05-10-2023.pdf | 5 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITEH CERTIFICATE RERA 07-01-2024.pdf | 5 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE RERA 06-04-2024.pdf | 5 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFIFATE -RERA -06-07-2024.pdf | 5 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE RERA -05-07-2022.pdf | 5 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_30092022.pdf | 5 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_30062024.pdf | 5 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_31032024.pdf | 5 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_31122023.pdf | 5 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_30092023.pdf | 5 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_30062023.pdf | 5 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_30032023.pdf | 5 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_31122022.pdf | 5 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_30062022.pdf | 5 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_22_23.pdf | 5 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_23_24.pdf | 5 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (2)_compressed.pdf | 5 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2 A.pdf | 5 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Ekdant Heights- Form 5.pdf | 18 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arcitect certificate.pdf | 11 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Xpanz - CA Certificate (Form 5)_compressed.pdf | 1 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate (Form 2).pdf | 10 Feb 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3.pdf | 8 Feb 2021 |
| Copy of the legal title reportFile: Search Title 356 2018-compressed.pdf | 5 Feb 2021 |
| Copy of the legal title reportFile: Search Title 365 2018-compressed.pdf | 5 Feb 2021 |
| Copy of the legal title reportFile: Search Title 356 2019-compressed.pdf | 5 Feb 2021 |
| Copy of the legal title reportFile: Search Title 365 2019-compressed.pdf | 5 Feb 2021 |
| Layout approvalFile: Layout-compressed.pdf | 3 Feb 2021 |
| Building plan approvalFile: IOD-compressed.pdf | 3 Feb 2021 |
| PAN CardFile: PAN.pdf | 3 Feb 2021 |
| Details of encumbrancesFile: Encumberances.pdf | 3 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Layout-compressed.pdf | 3 Feb 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD-compressed.pdf | 3 Feb 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 3 Feb 2021 |
| Declaration in FORM BFile: Form B-compressed.pdf | 3 Feb 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (Form 1)-compressed.pdf | 3 Feb 2021 |
| Proforma of Allotment letterFile: Agreement to Sale.pdf | 3 Feb 2021 |
| Proforma of Allotment letterFile: Proforma Allotment Letter-compressed.pdf | 3 Feb 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 73 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Ekdant Hights on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pimple Saudagar13,700+ in Pune
VANTAGE TWENTY ONE
VIVANTA REALTY
SHAKTI GARDENS
Grandwell Properties and Leasing Private L
24K OPULA
KOLTE-PATIL DEVELOPERS LIMITED
Sukhwani Minerva
Sukhwani Ramchandani LLP
MIDORI TOWER PHASE 4
VIKRAM DEVELOPERS AND PROMOTERS
Sai Aura
WJV LANDMARKS LLP
Builder: Xpanz Buildcon
Xpanz Buildcon has 1 registration on MahaRERA, including Ekdant Hights. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Ekdant Hights is delayed beyond 29 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Ekdant Hights?
The registered promoter entity is Xpanz Buildcon, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Ekdant Hights?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Ekdant Hights?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Ekdant Hights?
The professionals named in the filing: Architect: AAPT Studio - Dhiraj Takkekar; Architect: Hrushikesh Deore; Engineer: Tushar Gulabrao Kalbhor; Engineer: Vijay Dattatraya Gholap; Chartered Accountant: NPSR & Associates - CA. Vivek Lahoti; Chartered Accountant: Prajakta V Wable. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Ekdant Hights?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback