ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / EKATA RESIDENCY

Registered No litigation declared Others project

EKATA RESIDENCY

By SHANTEE HOMES PROPRIETOR RAAZ MOHAMMED ABDUL SAMAD PATHAN

RG-MH-33104 · RERA P99000080576 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Apr 2029Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Excavation, 95%
38 of 55Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 44 documents Report an error

EKATA RESIDENCY is a Others project by SHANTEE HOMES PROPRIETOR RAAZ MOHAMMED ABDUL SAMAD PATHAN in Palghar, Maharashtra, registered with MahaRERA as P99000080576 on 16 Jun 2025. Possession is promised by 30 Apr 2029. 17 of the 55 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameEKATA RESIDENCY
  • TypeOthers
  • Location
    • VILL- DIWANMAN
    • DIWANMAN
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401202
  • Pincode401202
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000080576
  • ReraGenie IDRG-MH-33104

Builder

  • NameSHANTEE HOMES PROPRIETOR RAAZ MOHAMMED ABDUL SAMAD PATHAN
  • Entity typeIndividual
  • Declared earlier projects15 →

Key dates

this monthRegisteredJun 2025PromisedApr 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Jun 2025
  • Promised completion30 Apr 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed44 files

Current status

31%17 of 55 units booked
41.8%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EKATA RESIDENCYNA8849655

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 95%.

EKATA RESIDENCY: 36% average across the applicable activities

ActivityProgress
Excavation95%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed25

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots25
Closed/Covered18
Open Space7

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area988 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Nov 2025
LandownerVillageDistrict
EKATA CO-OPERATIVE HOUSING SOCIETY LIMITEDVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVASAI VIRAR CITY MUNCIPAL CORPORATION
Permissible FSI4128.72
Proposed, not sanctioned3,129 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAURYA SHOPPING CENTRE, GROUND FLOOR, S NO. 16, HISSA NO. 10 / 11, AMBADI ROAD, VASAI DIST THANE 401202
Estimated costRs 9.10 cr
Cost incurredRs 3.80 cr
Work done41.76%
BuildingWingEstimatedIncurred
EKATA RESIDENCYNARs 9.10 crRs 3.80 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMUFADDAL MERCHANT
ArchitectDIPESH VANMALI
EngineerMOHAMMED SHOEB BHATI
Chartered AccountantJINESH JOSHI
Chartered AccountantHARESH MEHTA AND ASSOCIATES
PartnerRole in project
SHANTEE HOMES PROPRIETOR RAAZ MOHAMMED ABDUL SAMAD PATHAN-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 May 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 May 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 May 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2029

Documents filed44

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1- EKATA RESIDENCY.pdf24 Apr 2026
Withdrawal Update Form 2File: FORM 2 EKATA RESIDENCY.pdf24 Apr 2026
Withdrawal Update Form 3File: FORM-03 EKATA RESIDENCY.pdf24 Apr 2026
Withdrawal Update Form 1File: FORM 1 EKATA RESIDENCY.pdf25 Feb 2026
Withdrawal Update Form 2File: FORM 2 EKATA RESIDENCY.pdf25 Feb 2026
Withdrawal Update Form 3File: FORM 3 EKATA RESIDENCY.pdf25 Feb 2026
Withdrawal Update Form 1File: FORM 1 EKATA RESIDENCY.pdf5 Feb 2026
Withdrawal Update Form 2File: FORM 2 EKATA RESIDENCY.pdf5 Feb 2026
Withdrawal Update Form 3File: FORM 3 EKATA RESIDENCY.pdf5 Feb 2026
Withdrawal Update Form 1File: FORM 1 EKATA RESIDENCY.pdf7 Nov 2025
Withdrawal Update Form 1File: FORM 1 EKATA RESIDENCY.pdf7 Nov 2025
Withdrawal Update Form 2File: FORM 2 EKATA RESIDENCY.pdf7 Nov 2025
Withdrawal Update Form 2File: FORM 2 EKATA RESIDENCY.pdf7 Nov 2025
Withdrawal Update Form 3File: FORM 3 EKATA RESIDENCY.pdf7 Nov 2025
Withdrawal Update Form 3File: FORM 3 EKATA RESIDENCY.pdf7 Nov 2025
Form 1File: FORM-1 EKATA RESIDENCY.pdf13 Aug 2025
Form 2File: FORM-2 EKATA RESIDENCY.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: EKATA SOLD UNSLOD JUN25.pdf13 Aug 2025
Form 3File: FORM-3 EKATA RESIDENCY.pdf13 Aug 2025
Proforma of Agreement for saleFile: SALE AGREEMENT DRAFT.pdf6 Jun 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A EKATA RESIDENCY.pdf21 May 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B EKATA RESIDENCY.pdf21 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 EKATA RESIDENCY.pdf20 May 2025
Other - TechnicalFile: ANNEXURE A UNDER TAKING.pdf20 May 2025
Copy of the legal title reportFile: LEGAL TITLE REPORT EKATA RESIDENCY.pdf16 May 2025
Other - TechnicalFile: RERA CC AUTHENTICATION SCREENSHOT.pdf14 May 2025
Layout approvalFile: EKATA APPROVED PLAN 1.pdf2 May 2025
Building plan approvalFile: EKATA APPROVED PLAN 2.pdf2 May 2025
PAN CardFile: Raaz Sir Pan Card.pdf2 May 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE.pdf2 May 2025
Copy of Layout Approval (in case of layout)File: EKATA APPROVED PLAN 1.pdf2 May 2025
Proforma of Allotment letterFile: ALLOTMENT LETTER DRAFT.pdf2 May 2025
Declaration in FORM BFile: FORM B EKATA RESIDENCY.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 EKATA RESIDENCY.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 EKATA RESIDENCY.pdf2 May 2025
Commencement Certificates / NA Order for plotted developmentFile: ONLINE CC ORDER.pdf2 May 2025
Building Plan Approval / NA Order for plotted developmentFile: EKATA APPROVED PLAN 2.pdf2 May 2025
Declaration about Commencement CertificateFile: FORMAT D CC DECLARATION.pdf2 May 2025
CERSAI detailsFile: CERSAI REPORT.pdf2 May 2025
Deviation Report with respect to Allotment letterFile: NO DEVIATION ALLOTMENT.pdf2 May 2025
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE.pdf2 May 2025
Deviation Report with respect to model copy of AgreementFile: DEVIATION FOR SALE AGREEMENT.pdf2 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A INTEREST OTHER THAN.pdf2 May 2025
Disclosure for secured/unsecured finance availed for the projectFile: SECURED LOAN.pdf2 May 2025

Promoter's earlier projects16

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

9 delivered on promise7 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SUNSHINE GREEN PARK PH-3GOKHIVARE VASAI EAST207CompletedDec 2026Jan 2025
SUNSHINE GREEN PARK PH-VGOKHIVARE VASAI EAST28CompletedDec 2025Jan 2025
STERLING HEIGHTS E WINGYASHWANT SMART CITY GOKHIWARE VASAI EAST112CompletedDec 2025Apr 2025
SUNSHINE GREEN PARK PH-2GOKHIVARE VASAI EAST294CompletedJun 2025Jan 2025
MARVEL HEIGHTSYASHWANT SMART CITY GOKHIWARE VASAI EAST134CompletedJun 2025Apr 2025
SUNSHINE SAPPHIREGOKHIVARE YASHWANT SMART CITY VASAI EAST52CompletedDec 2024Late, Apr 2025
STERLING HEIGHTS B WINGYASHWANT SMART CITY GOKHIVARE VASAI137CompletedDec 2024Late, Apr 2025
STERLING HEIGHTS A-WINGYASHWANT SMART CITY GOKHIVARE VASAI EAST119CompletedDec 2024Late, Apr 2025
SHAMROCK RESIDENCYS NO 41 H NO 161 181 19 MANICKPUR VASAI PALGHAR30CompletedApr 2024Sep 2021
MEERA AVENUEYASHWANT SMART CITY GOKHIWARE VASAI EAST205CompletedDec 2022Oct 2021
SARGAM RESIDENCYCHANDRAPADA JUCHANDRA BAPANE ROAD NAIGAON TAL VASAI PALGHAR203CompletedDec 2021Jun 2018
ROMAN RESIDENCYVILL WADAVALI TAL VASAI DIST PALGHAR62CompletedAug 2019Late, Sep 2021
SUNSHINE SAPPHIREYASHWANT SMART CITY GOKHIWARE VASAI EAST136CompletedMay 2019Late, Mar 2021
SUNSHINE PALACEVASAI STATION VASAI EAST46CompletedMar 2018Nov 2017
SUNSHINE GREEN PARK PH-1S no 226 228 227 H no 2 3 4 5 GOKHIVARE VASAI EAST343CompletedMar 2018Late, Jul 2018
SARGAM AVENUECHANDRAPADA NAIGAON EAST TAL VASAI DIST PALGHAR132CompletedMar 2016Late, Jun 2018

How this compares with Palghar

31%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EKATA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DIWANMAN3,200+ in Palghar

2 kmEKATA RESIDENCYCompleted 45Lapsed / revoked 27Other 52Dot size: filed unitsN

Filed coordinates, straight-line distance. 124 registered projects within 2 km.

Builder: SHANTEE HOMES PROPRIETOR RAAZ MOHAMMED ABDUL SAMAD PATHAN

SHANTEE HOMES PROPRIETOR RAAZ MOHAMMED ABDUL SAMAD PATHAN has 1 registration on MahaRERA, including EKATA RESIDENCY. Its filings disclose 15 earlier MahaRERA projects: declares 9 of 15 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if EKATA RESIDENCY is delayed beyond 30 Apr 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EKATA RESIDENCY?

The registered promoter entity is SHANTEE HOMES PROPRIETOR RAAZ MOHAMMED ABDUL SAMAD PATHAN, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EKATA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EKATA RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EKATA RESIDENCY?

The professionals named in the filing: Architect: MUFADDAL MERCHANT; Architect: DIPESH VANMALI; Engineer: MOHAMMED SHOEB BHATI; Chartered Accountant: JINESH JOSHI; Chartered Accountant: HARESH MEHTA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EKATA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EKATA RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EKATA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.