EISHA BASILLA

By EISHA CONCORD REALTORS

RG-MH-10841 · RERA P52100004253 · Last updated on MahaRERA portal: 26 Dec 2019

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 72 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 22 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2020Possession promised72 months past this date
1 of 11Construction stages donefurthest along: Basement (if any), 97%
1Complaints at MahaRERAon this registration
Jump to the 42 documents Report an error

EISHA BASILLA is a Others project by EISHA CONCORD REALTORS in Pune, Maharashtra, registered with MahaRERA as P52100004253 on 9 Aug 2017. Possession was promised by 30 Oct 2020 and is now 72 months past that date. The completion date has moved by 22 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameEISHA BASILLA
  • TypeOthers
  • Location
    • Kondhwa Road
    • Kondhwa Budruk
    • kondhwa BK
    • Haveli
    • Pune
    • 411048
  • Pincode411048
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100004253
  • ReraGenie IDRG-MH-10841

Builder

  • NameEISHA CONCORD REALTORS
  • Entity typePartnership
  • PartnersSWARANSINGH GYANSINGH SOHAL, RANJEETSINGH NANDLAL HOODA
  • Declared earlier projects3 →

Key dates

72 months past promisethis monthRegisteredAug 2017First promiseDec 2018Revised toOct 2020

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 Aug 2017
  • Promised completion30 Oct 2020
  • Revised completionRevised to 30 Oct 2020 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed42 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EISHA BASILLANA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Dec 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 97%.

EISHA BASILLA: 89% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)97%
Podiums (if any)96%
Plinth97%
Stilt Floor92%
Slabs of Super Structure83%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises94%
Sanitary Fittings within the flats / premises68%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks72%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.96%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.82%

Progress on shared amenities15

As on 26 Dec 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes88%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes98%
Storm Water DrainsYes98%
Landscaping & Tree PlantingYes65%
Street LightingYes0%
Community BuildingsYes60%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes92%
Water conservation /Rain water harvestingYes80%
Energy managemcntYes45%
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes60%
Open ParkingNoNot applicable

Parking filed127

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots127
Closed/Covered127

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,100 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8442.73
Proposed, not sanctioned7,555 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch562/7 RIVERVIEW APRTMENT OPP SAVARKAR BHAWAN CONGRESS HOUSE ROAD SHIVAJI NAGAR PUNE

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVILAS TARWADI
EngineerDESIGN WERKZ ENGINEERING PVT LTD
PartnerRole in project
EISHA CONCORD REALTORS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100001334Dec 2018 → Apr 2020

Reason as filed by the promoterWe have received the revised sanction in June-2017 wherein one upper floor of B-Bldg., and 2 upper floors of commercial Bldg., were not sanctioned as the DP Road going through the said project was pending for final survey and handover to Pune Municipal Corporation and It is due to their internal departmental decision where we have no role to play or we have not kept any document pending from our end for the said DP road. Hence we have inwarded the application for final sanctioning on 10-Jan-2018 for which we were granted the final sanction by first week of August -2018 thus hampering the work

EXT52100005507Dec 2018 → Apr 2020

Reason as filed by the promoterDear Sir, There was delay in receiving final sanction from Municipal Authorities which halted the project for a long time which we did mention in our last extension. Project was delayed for a reason beyond our control and due to this even we came under financial burden wherein during the same period we had to complete repayment of the project loan taken from State Bank Of India further accompanied with non-payment by customers due to delay. We even requested our customers to make payments as per the clause 16(V) (copy attached) mentioned in agreement however they ensured us of balance payments

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000177837Madhukar Shankar DhandekarM/s. EISHA Concord Realtors Through its Partner/s Mr. Bharat Mithalal Nagori02/12/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed42

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrancesFile: Encumbrance - Index-2.pdf26 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_compressed.pdf23 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate_compressed.pdf23 Sep 2019
Engineers Certificate on Quality Assurance (Form 2A)File: Form - 2A_compressed.pdf23 Sep 2019
Certificates of CA (Form 3)File: CA Certificate_compressed.pdf23 Sep 2019
OtherFile: Part Completion - 2018.PDF30 Jan 2019
Certificates of CA (Form 5)File: Form-5.pdf25 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf25 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf25 Dec 2018
Certificates of CA (Form 3)File: CA Certificate.pdf25 Dec 2018
Certificates of CA (Form 3)File: C A CERTIFICATE.pdf1 Aug 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf23 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate.pdf23 Jul 2018
OtherFile: Development_Agreement-1_10.pdf13 Apr 2018
OtherFile: Development_Agreement_11_20.pdf13 Apr 2018
OtherFile: Development_Agreement_21_30.pdf13 Apr 2018
OtherFile: Development_Agreement_41_50.pdf13 Apr 2018
OtherFile: Development_Agreement_51_60.pdf13 Apr 2018
OtherFile: Development_Agreement_61_70.pdf13 Apr 2018
OtherFile: Development_Agreement_71-83.pdf13 Apr 2018
Proforma of Allotment letterFile: Agreement Draft_Basilla_Revised.pdf30 Jul 2017
Proforma of Allotment letterFile: Allotment_ Draft_Basilla_Revised.pdf30 Jul 2017
Details of encumbrancesFile: 1-10.pdf29 Jul 2017
Details of encumbrancesFile: 11-20.pdf29 Jul 2017
Details of encumbrancesFile: 21-20.pdf29 Jul 2017
Details of encumbrancesFile: 41-50.pdf29 Jul 2017
Details of encumbrancesFile: 51-60.pdf29 Jul 2017
Details of encumbrancesFile: 61-70.pdf29 Jul 2017
Details of encumbrancesFile: 71-80.pdf29 Jul 2017
Details of encumbrancesFile: 81-92.pdf29 Jul 2017
Details of encumbrancesFile: 92-104.pdf29 Jul 2017
Certificates of CA (Form 3)File: CA Certificate.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate.pdf28 Jul 2017
Building plan approvalFile: Plan No 1.pdf27 Jul 2017
Copy of the legal title reportFile: Eisha Basilla Title Report 2017.pdf27 Jul 2017
Building Plan Approval (IOD)File: Plan No 1.pdf27 Jul 2017
Declaration in FORM BFile: Form B _Eisha Concord Realtors.pdf27 Jul 2017
Layout approvalFile: Plan No 1.pdf23 Jul 2017
PAN CardFile: ECR_Pan Card.PDF23 Jul 2017
Copy of Layout Approval (in case of layout)File: Plan No 1.pdf23 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Basilla_Revised_CC_Pages 1 to 4-ilovepdf-compressed.pdf23 Jul 2017

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
EISHA BELLAVISTA PHASE 3SR NO. 15 KONDHWA BUDRUK PUNE-41104847CompletedMar 2011Late, Nov 2011
EISHA BELLAVISTA PHASE 2SR NO. 15 KONDHWA BUDRUK PUNE-411048118CompletedMar 2011Late, Nov 2011
EISHA BELLAVISTA PHASE 1SR NO. 15 KONDHWA BUDRUK PUNE-411048117CompletedApr 2009Late, Jul 2009

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 22 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EISHA BASILLA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kondhwa Budruk13,700+ in Pune

2 kmEISHA BASILLACompleted 67Lapsed / revoked 40Other 82Dot size: filed unitsN

Filed coordinates, straight-line distance. 189 registered projects within 2 km.

Builder: EISHA CONCORD REALTORS

EISHA CONCORD REALTORS has 1 registration on MahaRERA, including EISHA BASILLA. Its filings disclose 3 earlier MahaRERA projects: declares 0 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that EISHA BASILLA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if EISHA BASILLA is delayed beyond 30 Oct 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EISHA BASILLA?

The registered promoter entity is EISHA CONCORD REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EISHA BASILLA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against EISHA BASILLA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for EISHA BASILLA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EISHA BASILLA?

The professionals named in the filing: Architect: VILAS TARWADI; Engineer: DESIGN WERKZ ENGINEERING PVT LTD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EISHA BASILLA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EISHA BASILLA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EISHA BASILLA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.