Registered No litigation declared Residential / Group Housing project

EAST WORLD Phase - I

By SANKLA-MAHADIK REALTY

RG-MH-82644 · RERA P52100054774 · Last updated on MahaRERA portal: 18 Aug 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
15 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 80%
44 of 184Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 99 documents Report an error

EAST WORLD Phase - I is a Residential / Group Housing project by SANKLA-MAHADIK REALTY in Pune, Maharashtra, registered with MahaRERA as P52100054774 on 12 Feb 2024. Possession is promised by 31 Dec 2028. 140 of the 184 units on this registration are recorded sold or booked, and 15 of 33 construction stages are filed complete.

At a glance

Project

  • NameEAST WORLD Phase - I
  • TypeResidential / Group Housing
  • Location
    • Pune Solapur Road
    • Manjari Budruk
    • MANJARI Bk
    • Haveli
    • Pune
    • 412307
  • Pincode412307
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054774
  • ReraGenie IDRG-MH-82644

Builder

  • NameSANKLA-MAHADIK REALTY
  • Entity typePartnership
  • GSTIN27AEOFS2466J1ZF
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersSahil Subhash Sankla, Subhash Dhanraj Sankla, Narendra Vijay Mahadik, Vijay Vasantrao Mahadik, Virendra Vijay Mahadik
  • Other registrations2 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredFeb 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Feb 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed99 files

Current status

76%140 of 184 units booked
65.3%Work done, per cost certificate

Figures as on 18 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower No 7NA171456056
Tower No 8NA191664064
Tower No 9NA191664064

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 18 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 80%.

Tower No 775%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Tower No 875%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Tower No 975%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 18 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed264

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots264
Closed/Covered264
BuildingClosed/CoveredTotal
Tower No 78888
Tower No 88888
Tower No 98888

Land and ownership31

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,321 sq m
Land owned byThe promoter, with other names on the file
Named landowners31
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jun 2025
LandownerVillageDistrict
Sharad Bapusaheb KodreMANJARI BkPune
Sanjay Bappusaheb KodreShewalewadiPune
Mr. Sharad Bapusaheb KodreMANJARI BkPune
Mr Sanjay Bapusaheb KodreMANJARI BkPune
Mrs. Sujata Sharad KodreMANJARI BkPune
Mrs Manisha Sanjay KodreMANJARI BkPune
Master Sharanya Mayur KodreMANJARI BkPune
Mr. Akshay Sharad KodreMANJARI BkPune
Mrs. Namrata Akshay KodreMANJARI BkPune
Mr. Vrushabh Sanjay KodreMANJARI BkPune
Mr. Sangram Sanjay KodreMANJARI BkPune
Mr. Amit Hemant BhagatMANJARI BkPune
Mrs. Gauri Amit BhagatMANJARI BkPune
Aradhya Amit BhagatMANJARI BkPune
Mr. Sumit Hemant BhagatMANJARI BkPune
Mr. Abhijit Rajendra BhagatMANJARI BkPune
Mrs. Puja Abhijit BhagatMANJARI BkPune
Shraddha Abhijit BhagatMANJARI BkPune
Puja Rajendra BhagatMANJARI BkPune
Mrs. Sunita Nitin BhagatMANJARI BkPune
Mr. Indrajit Nitin BhagatMANJARI BkPune
Tanaya Nitin BhagatMANJARI BkPune
Mrs. Kiran Sumit BhagatMANJARI BkPune
Arnavi Sumit BhagatMANJARI BkPune
Mr Hemant Prataprao BhagatMANJARI BkPune
Mrs Smita Hemant BhagatMANJARI BkPune
Mr Rajendra Prataprao BhagatMANJARI BkPune
Mrs Poonam Rajendra BhagatMANJARI BkPune
Mr Nitin Prataprao BhagatMANJARI BkPune
Mr. Mayur Sharad KodreMANJARI BkPune
Mrs. Sneha Mayur KodreMANJARI BkPune

Approvals and building plan

Sanctioning authorityPune Metro Politan Regional Development Authority
Permissible FSI21960.11
Proposed, not sanctioned15,404 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch396 2 Lalwani Estate Pune Satara Road Pune-411037
Estimated costRs 63.91 cr
Cost incurredRs 41.76 cr
Work done65.35%
BuildingWingEstimatedIncurred
Tower No 7NARs 26.44 crRs 17.39 cr
Tower No 8NARs 18.73 crRs 12.19 cr
Tower No 9NARs 18.73 crRs 12.19 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA B Architects
ArchitectGM Architect
EngineerChandrashekhar Dharmadhikari
Chartered AccountantNamrata Kalpesh Dhruve & Co
Chartered AccountantKiran Suryawanshi and Associates
PartnerRole in project
SANKLA-MAHADIK REALTY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed99

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: form 2 A EW ph 1.pdf18 Aug 2026
Withdrawal Update Form 1File: EW Form 1 - Ph 1 - June 2026.pdf14 Aug 2026
Withdrawal Update Form 2File: EW Form 2 - Ph 1 - June 2026.pdf14 Aug 2026
Withdrawal Update Form 3File: EW Form 3 - Ph 1 - June 2026.pdf14 Aug 2026
Withdrawal Update Form 1File: Form 1 EW PH 1 Sep 2025.pdf16 Jun 2026
Withdrawal Update Form 1File: Form 1 EW PH 1 Dec 2025.pdf16 Jun 2026
Withdrawal Update Form 1File: EW PH 1 - FORM 1 - 31 MRCH 2026.pdf16 Jun 2026
Withdrawal Update Form 2File: SMR Form 2 - EW Ph1 - Sep 2025.pdf16 Jun 2026
Withdrawal Update Form 2File: SMR Form 2 - EW Ph1 - Dec 2025.pdf16 Jun 2026
Withdrawal Update Form 2File: EW FORM 2 - Ph 1 - MARCH 2026.pdf16 Jun 2026
Withdrawal Update Form 3File: Form 3 EW ph 1 sept 2025 Final.pdf16 Jun 2026
Withdrawal Update Form 3File: FORM 3 DEC 2025 SMR Phase I.pdf16 Jun 2026
Withdrawal Update Form 3File: FORM 3 ph 1 East world MARCH 2026 Final.pdf16 Jun 2026
Form 1File: form 1 march 2024.pdf14 Aug 2025
Form 2File: form 2 march 2024.pdf14 Aug 2025
Form 3File: form 3 march 2024.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Disclosure East World MAR-24.pdf14 Aug 2025
Form 1File: form 1 june 2024.pdf14 Aug 2025
Form 2File: form 2 june 2024.pdf14 Aug 2025
Form 3File: form 3 june 2024.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Disclosure East World JUN-24.pdf14 Aug 2025
Form 1File: form 1 sep 2024.pdf14 Aug 2025
Form 2File: form 2 sep 2024.pdf14 Aug 2025
Form 3File: form 3 sep 2024.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Disclosure East World SEP-24.pdf14 Aug 2025
Form 1File: form 1 dec 2024.pdf14 Aug 2025
Form 2File: form 2 dec 2024.pdf14 Aug 2025
Form 3File: form 3 dec 2024.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Disclosure East World DEC-24.pdf14 Aug 2025
Withdrawal Update Form 1File: Form 1 East World Phase 1 july 2025.pdf14 Aug 2025
Withdrawal Update Form 2File: Form 2 East World phase 1 july 2025.pdf14 Aug 2025
Withdrawal Update Form 3File: FORM 3 -JUNE 2025 -SMR Phase I (2).pdf14 Aug 2025
Withdrawal Update Form 1File: FORM 1 MARCH -2025.pdf11 Aug 2025
Withdrawal Update Form 1File: FORM 1 MARCH -2025.pdf11 Aug 2025
Withdrawal Update Form 2File: FORM 2 SMR 1 Dec 24.pdf11 Aug 2025
Withdrawal Update Form 2File: FORM 2 SMR 1 Dec 24.pdf11 Aug 2025
Withdrawal Update Form 3File: form no 03 sm CA_rotated-rotated_11zon.pdf11 Aug 2025
Withdrawal Update Form 3File: form no 03 sm CA_rotated-rotated_11zon.pdf11 Aug 2025
Form 1File: FORM 1 MARCH -2025.pdf30 Jun 2025
Form 2File: FORM 2 MARCH -2025.pdf30 Jun 2025
Form 3File: FORM 3 MARCH - 2025.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Disclosure MARCH -2025.pdf30 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SMR 1 Dec 24.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SMR 1 Dec 24.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SMR 1 Dec 24.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 EW Ph1.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 T8 T9 31 03 24.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 T8 T9 30 06 24.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 T8 T9 Dt 30 09 24.pdf18 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 2024.pdf18 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2024.pdf18 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept 24.pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SMR Form 2 T8 T9 Dt 31 03 24.pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SMR Form 2 T8 T9 Dt 30 06 24.pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SMR Form 2 T8 T9 Dt 30 09 24.pdf18 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: East World CC Verification.pdf6 Feb 2024
Other - TechnicalFile: East World CC Verification.pdf6 Feb 2024
Other - TechnicalFile: FORAM D.pdf6 Feb 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance- Litigation.pdf5 Feb 2024
Details of encumbrances concerned to LegalFile: No Encumbrance- Litigation.pdf5 Feb 2024
Other - TechnicalFile: Order 50.pdf5 Feb 2024
Other - TechnicalFile: ilovepdf_merged (63).pdf5 Feb 2024
Building plan approvalFile: HPSCANNER4583.pdf1 Feb 2024
Building plan approvalFile: HPSCANNER4584.pdf1 Feb 2024
Layout approvalFile: Copy of Layout- Eastworld_11zon.pdf1 Feb 2024
Building plan approvalFile: Page 2.pdf1 Feb 2024
Building plan approvalFile: HPSCANNER4579.pdf1 Feb 2024
Building plan approvalFile: HPSCANNER4580.pdf1 Feb 2024
Building plan approvalFile: HPSCANNER4581.pdf1 Feb 2024
Building plan approvalFile: HPSCANNER4582.pdf1 Feb 2024
Copy of Layout Approval (in case of layout)File: Copy of Layout- Eastworld_11zon.pdf1 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Page 2.pdf1 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER4579.pdf1 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER4580.pdf1 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER4581.pdf1 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER4582.pdf1 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER4583.pdf1 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER4584.pdf1 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Page 9.pdf1 Feb 2024
CERSAI detailsFile: Cersai Dec.pdf1 Feb 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
EAST WORLD Phase - IIP52100077516Manjari (BK), Pune56Aug 2024OngoingDec 2027Not due yet

How this compares with Pune

76%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep EAST WORLD Phase - I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Manjari Budruk13,700+ in Pune

2 kmEAST WORLD Phase - ICompleted 13Lapsed / revoked 7Other 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 45 registered projects within 2 km.

Builder: SANKLA-MAHADIK REALTY

SANKLA-MAHADIK REALTY has 3 registrations on MahaRERA, including EAST WORLD Phase - I and EAST WORLD Phase - II. Its filings disclose 3 earlier MahaRERA projects: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if EAST WORLD Phase - I is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of EAST WORLD Phase - I?

The registered promoter entity is SANKLA-MAHADIK REALTY, a partnership as per the filing. Its GSTIN 27AEOFS2466J1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in EAST WORLD Phase - I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for EAST WORLD Phase - I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at EAST WORLD Phase - I?

The professionals named in the filing: Architect: A B Architects; Architect: GM Architect; Engineer: Chandrashekhar Dharmadhikari; Chartered Accountant: Namrata Kalpesh Dhruve & Co; Chartered Accountant: Kiran Suryawanshi and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in EAST WORLD Phase - I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About EAST WORLD Phase - I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save EAST WORLD Phase - I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.