Earth Vintage

By Earth Vintage

RG-MH-42185 · RERA P51900018268 · Last updated on MahaRERA portal: 9 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date
  • Completion date moved by 30 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
70 of 97Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

Earth Vintage is a Residential / Group Housing project by Earth Vintage in Mumbai City, Maharashtra, registered with MahaRERA as P51900018268 on 22 Oct 2018. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 30 months from the original filing. 27 of the 97 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameEarth Vintage
  • TypeResidential / Group Housing
  • Location
    • Senapati Bapat Marg
    • Dadar (West)
    • GNorth-400028
    • Ward GNorth
    • Mumbai City
    • 400028
  • Pincode400028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900018268
  • ReraGenie IDRG-MH-42185

Builder

  • NameEarth Vintage
  • Entity typePartnership
  • PartnersPiyush Jain, Bhupesh Jain
  • Declared earlier projects5 →

Key dates

16 months past promisethis monthRegisteredOct 2018First promiseDec 2022Revised toJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 Oct 2018
  • Promised completion30 Jun 2025
  • Revised completionRevised to 30 Jun 2025 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed96 files

Current status

28%27 of 97 units booked
101.3%Work done, per cost certificate

Figures as on 9 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Earth VintageNA2220742397

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Earth Vintage: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Closed/Covered56

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area608 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Jun 2026

Approvals and building plan

Sanctioning authorityMUNCIPAL CORPARATION OF MUMBAI
Permissible FSI4541.35
Proposed, not sanctioned4,541 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor Matrumandir Jaojee Dadajee Road Mumbai 400007
Estimated costRs 29.65 cr
Cost incurredRs 30.05 cr
Work done101.33%
BuildingWingEstimatedIncurred
Earth VintageNARs 28.15 crRs 28.62 cr
-NARs 1.50 crRs 1.43 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANKITA DHARIA
ArchitectA. P DHARIA & ASSOCIATES
EngineerHEMENDRA M BIDAMIA
Chartered AccountantMEGHAL JAIN & ASSOCIATES
PartnerRole in project
Earth Vintage-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900016480Dec 2022 → Dec 2023

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION FOR 12 MONTHS

EXT51900025134Dec 2022 → Jun 2025

Reason as filed by the promoterWe once again would like to request you that the Project EARTH VINTAGE which is located ot CS/CTS/survey no1386 of Mahim Division, Mumbai 400 028 having its Registration No P51900018268. was mentioned to be completed on 30/12/2023. As per GR no TPB/4320/107/CR-72/2020(Part I)/UD-11 dated 08/07/2021 the revised sanction is awaited. Due to delay in granting sanction by MCGM the project was not able to get completed in time 2025 We would like to request you to further grant us further extension up to 30th June We request you kindly grant Request you to kindly consider the above MS the certificate

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Oct 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Aug 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Jul 2022

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Earth vintage Form 1 june 25.pdf9 Jun 2026
Withdrawal Update Form 2File: Vintage form- 2 June 2025.pdf9 Jun 2026
Withdrawal Update Form 3File: Earth vintage form 3 june 25.pdf9 Jun 2026
Declaration in FORM BFile: DECLARATION IN FORM B.pdf3 Apr 2025
Disclosure of sold/ booked inventoryFile: disclosure of inventory.pdf28 Mar 2025
Declaration in FORM BFile: P51900018268_FileName_1.pdf18 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form -1 Earth Vintage.pdf22 Jan 2025
Certificates of CA (Form 3)File: Form -3 Vintage.pdf22 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 vintage dec 2024.pdf22 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Earth Vintage Form 5.pdf21 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A 2022-2023.pdf21 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A 2023-2024.pdf21 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A 2022-2023.pdf21 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A 2023-2024.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Earth Vintage Form 5.pdf21 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Vintage form 1.pdf19 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Form 2 Oct 2024.pdf19 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure Inventory.pdf19 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Vintage form 1.pdf19 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Form 2 Oct 2024.pdf19 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure Inventory.pdf19 Nov 2024
Certificates of CA (Form 3)File: form -3 Earth Vintage.pdf30 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf12 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf12 Aug 2024
Certificates of CA (Form 3)File: form 3.pdf12 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 (2).pdf10 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: E Vintage Form-2.pdf10 May 2024
Certificates of CA (Form 3)File: E Vintage Form3.pdf10 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: E Vintage FORM 1 OCT 2023.pdf16 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: E Vintage FORM 1 DEC 2023.pdf16 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 VINTAGE OCT 2023.pdf16 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 VINTAGE DEC 2023.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: E Vintage Disclosure OF inv DEC 2023.pdf16 Jan 2024
Certificates of CA (Form 3)File: E Vintage Form-3 DEC 2023.pdf16 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: E Vintage Form 5 (01-04-2022 To 31-03-2023 ).pdf7 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT FORM 1.pdf18 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EARTH VINTAGE FORM 2 JUNE 2023.pdf18 Jul 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY JUNE 2023.pdf18 Jul 2023
Certificates of CA (Form 3)File: EARTH VINTAGE FORM 3 JUNE QUARTER.pdf18 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf15 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form -2A 2021.pdf15 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2A 2022.pdf15 May 2023
Certificates of CA (Form 3)File: FORM 3 VINTAGE MARCH 23_compressed.pdf28 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CFT SEPT 2022.pdf26 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CFT DEC 2022.pdf26 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CFT MARCH 2023.pdf26 Apr 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf26 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 spetember 2022.pdf13 Dec 2022
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf13 Dec 2022
Certificates of CA (Form 3)File: Earth vintage FORM _3 AUG 2020.pdf13 Dec 2022
Certificates of CA (Form 3)File: Earth vintage From 3-31st Dec 2020.pdf13 Dec 2022
Certificates of CA (Form 3)File: Earth vintage Form -3 31 March 2021.pdf13 Dec 2022
Certificates of CA (Form 3)File: Earth Vintage From -31st Decmber 2021.pdf13 Dec 2022
Certificates of CA (Form 3)File: Earth vintage Form-31st March 2022.pdf13 Dec 2022
Certificates of CA (Form 3)File: Earth Vintage Form- 30th June 2022.pdf13 Dec 2022
Certificates of CA (Form 3)File: Earth Vintage Form -30th September 2022.pdf13 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Earth Vintages Form-5 31st march 2022.pdf13 Dec 2022
Declaration about Commencement CertificateFile: CC Declaration.pdf23 Jul 2022
CERSAI detailsFile: CERSAI.pdf23 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 2021.pdf23 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 MARCH 2019.pdf23 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 2020.pdf23 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 2021.pdf23 Jul 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate.pdf18 Jul 2022
Layout approvalFile: Layout Approval.pdf8 Jul 2022
Layout approvalFile: 2274790Amendletter_signed.pdf8 Jul 2022
Details of encumbrances concerned to LegalFile: 181004 Encumbrance.pdf8 Jul 2022
Copy of Layout Approval (in case of layout)File: Layout Approval.pdf8 Jul 2022
Copy of Layout Approval (in case of layout)File: 2274790Amendletter_signed.pdf8 Jul 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2296166_OC_signed.pdf8 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf3 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf3 Aug 2021
Form 2AFile: Form 2A.pdf3 Aug 2021
Layout approvalFile: 190722 Amendment Approval Ltr.pdf30 Aug 2019
Copy of Layout Approval (in case of layout)File: 190722 Amendment Approval Ltr.pdf30 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: 190809 CC Full.pdf30 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 19Q2 Arch Certificate.pdf19 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 19Q2 Arch Certificate.pdf19 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 19Q2 Eng Certificate.pdf19 Aug 2019
Form 2AFile: 19Q2 Form 2A.pdf19 Aug 2019

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Earth Baug116 Shamaldas Gandhi Marg Princess Street Mumbai 400 00237CompletedDec 2017Late, Mar 2018
Earth ClassicDr Babasaheb Ambedkar Road Matunga East Mumbai 400 01929CompletedOct 2017Late, Nov 2017
Earth Pillar22 24B Junction of Khadilkar Road and Sadashiv Cross Road Girgaum Mumbai 40000454CompletedApr 2015Apr 2015
Earth Galaxy163 A Dr B A Road Dadar Mumbai 40001421CompletedApr 2014Apr 2014
Earth View12th Khetwadi Back Road Girgaon Mumbai 40000445CompletedAug 2012Aug 2012

How this compares with Mumbai City

28%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 30 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is among them

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Earth Vintage on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dadar (West)780+ in Mumbai City

2 kmEarth VintageCompleted 69Lapsed / revoked 57Other 97Dot size: filed unitsN

Filed coordinates, straight-line distance. 223 registered projects within 2 km.

Builder: Earth Vintage

Earth Vintage has 1 registration on MahaRERA, including Earth Vintage. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 5 past projects completed on time. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What does it mean that Earth Vintage shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Earth Vintage is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Earth Vintage?

The registered promoter entity is Earth Vintage, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Earth Vintage?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Earth Vintage?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Earth Vintage?

The professionals named in the filing: Architect: ANKITA DHARIA; Architect: A. P DHARIA & ASSOCIATES; Engineer: HEMENDRA M BIDAMIA; Chartered Accountant: MEGHAL JAIN & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Earth Vintage?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Earth Vintage. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Earth Vintage to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.