Dridhena Developers and Realtors
By Dridhena Developers and Realtors
RG-MH-25814 · RERA P51800007733 · Last updated on MahaRERA portal: 8 May 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 49 months
- 4 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Dridhena Developers and Realtors is a Residential / Group Housing project by Dridhena Developers and Realtors in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800007733 on 17 Aug 2017. The registration is recorded completed; possession was promised by 31 Mar 2023. The completion date has moved by 49 months from the original filing.
At a glance
Project
- NameDridhena Developers and Realtors
- TypeResidential / Group Housing
- Location
- Borivali
- Mumbai Suburban
- 400062
- Pincode400062
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800007733
- ReraGenie IDRG-MH-25814
Builder
- NameDridhena Developers and Realtors
- Entity typePartnership
- PartnersSameer Kamalakar Desai, Vinay Jitendrabhai Patel
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on17 Aug 2017
- Promised completion31 Mar 2023
- Revised completionRevised to 31 Mar 2023 (originally 28 Feb 2019)
- Buildings1 building record
- Documents filed69 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Dridhena Developers and Realtors | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 8 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 90%.
Dridhena Developers and Realtors: 80% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 55% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 55% |
Progress on shared amenities15
As on 8 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 55% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 55% |
| Storm Water Drains | Yes | 55% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 55% |
| Water conservation /Rain water harvesting | Yes | 55% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed15
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NEOCON Infrastructure Services Pvt Ltd |
| Engineer | R D Magdum |
| Partner | Role in project |
|---|---|
| Dridhena Developers and Realtors | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promotera. Due to current COVID 19 situation in the entire country, the construction activities were at stand still for more than 7-8 months. b. Other reasons for delay in completing the project are same as stated while applying for Extension under 6: i. CC for 4 and half floor was granted by Municipal Corporation of Greater Mumbai. Further CC for 2 and half floor was not issued by Municipal Corporation of Greater Mumbai due to new Rule relating the width of Road adjoining the Building. ii. Delay in implementation of new DP plan by Municipal Corporation of Greater Mumbai. iii. Stay of Supreme Court on
Reason as filed by the promotera. Due to the current COVID 19 situation in the entire country, the construction activities were at stand still for more than 7-8 months. b. Other reasons for delay in completing the project are same as stated while applying for Extension under Section 6 i. CC for 4 and half floor was granted by Municipal Corporation of Greater Mumbai. Further CC for 2 and half floor was not issued by Municipal Corporation of Greater Mumbai due to new Rule relating the width of the Road adjoining the Building. ii. Delay in implementation of new DP plan by Municipal Corporation of Greater Mumbai. iii. Stay of S
Reason as filed by the promoterDelay in getting Commencement Certificate and Effect of COVID-19
Reason as filed by the promoterThe completion of project is delayed due to the following: 1. CC for 4 and half floor was granted by Municipal Corporation of Greater Mumbai. Further CC for 2 and half floor was not issued by Municipal Corporation of Greater Mumbai due to new Rule relating the width of the Road adjoining the Building. 2. Delay in implementation of new DP plan by Municipal Corporation of Greater Mumbai. 3. Stay of Supreme Court on Municipal Corporation of Greater Mumbai to restrict further permission due to Dumping Ground issue.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Jun 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 14 Jun 2023
Documents filed69
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Other - TechnicalFile: Letter and documents.pdf | 8 May 2025 |
| Other - TechnicalFile: Possession Letters.pdf | 8 May 2025 |
| Building plan approvalFile: BUILDING PLAN APPROVAL.pdf | 14 Jun 2023 |
| Building Plan Approval (IOD)File: BUILDING PLAN APPROVAL.pdf | 14 Jun 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2370435_OC_signed.pdf | 14 Jun 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Revalidation.pdf | 19 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Sept 22.pdf | 19 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Sept 22.pdf | 19 Oct 2022 |
| Form 2AFile: Form 2A - Sept 22.pdf | 19 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - March 22.pdf | 19 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 19 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Mar 22.pdf | 19 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 15 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 15 Jul 2022 |
| Layout approvalFile: LETTER.pdf | 31 Jul 2021 |
| Layout approvalFile: Copy of Layout Approval.pdf | 31 Jul 2021 |
| Copy of Layout Approval (in case of layout)File: Copy of Layout Approval.pdf | 31 Jul 2021 |
| Copy of Layout Approval (in case of layout)File: LETTER.pdf | 31 Jul 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: LETTER.pdf | 31 Jul 2021 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT CC.pdf | 31 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A.pdf | 31 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5.pdf | 31 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5.pdf | 31 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5.pdf | 31 Jul 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 30 Jul 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: 2273881_FurtherCC_signed.pdf | 16 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: SOLD-BOOKED INVENTORY.pdf | 16 Jul 2021 |
| Building plan approvalFile: IOD - Amended.pdf | 1 Sep 2020 |
| Layout approvalFile: Amended Drawing-1.pdf | 1 Sep 2020 |
| Layout approvalFile: Amended Drawing-2.pdf | 1 Sep 2020 |
| Copy of Layout Approval (in case of layout)File: Amended Drawing-1.pdf | 1 Sep 2020 |
| Copy of Layout Approval (in case of layout)File: Amended Drawing-2.pdf | 1 Sep 2020 |
| Building Plan Approval (IOD)File: IOD - Amended.pdf | 1 Sep 2020 |
| Building plan approvalFile: Amended Drawing-1.pdf | 8 Nov 2019 |
| Building plan approvalFile: Amended Drawing-2.pdf | 8 Nov 2019 |
| Building Plan Approval (IOD)File: Amended Drawing-1.pdf | 8 Nov 2019 |
| Building Plan Approval (IOD)File: Amended Drawing-2.pdf | 8 Nov 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate(MCGM).pdf | 8 Nov 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Engineer's Certificate - Form 2.pdf | 8 Nov 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate - Form 2.pdf | 8 Nov 2019 |
| Building plan approvalFile: final rera_compressed (2)-1-7.pdf | 24 Jun 2019 |
| Building plan approvalFile: final rera_compressed (2)-8-18.pdf | 24 Jun 2019 |
| Building plan approvalFile: final rera_compressed (2)-19-28.pdf | 24 Jun 2019 |
| Building Plan Approval (IOD)File: final rera_compressed (2)-1-7.pdf | 24 Jun 2019 |
| Building Plan Approval (IOD)File: final rera_compressed (2)-8-18.pdf | 24 Jun 2019 |
| Building Plan Approval (IOD)File: final rera_compressed (2)-19-28.pdf | 24 Jun 2019 |
| Layout approvalFile: Layout plan.pdf | 17 Jun 2019 |
| Copy of Layout Approval (in case of layout)File: Layout plan.pdf | 17 Jun 2019 |
| Form 2AFile: Quality Assurance certificate - Form 2A.pdf | 9 Mar 2019 |
| Certificates of CA (Form 3)File: CA Certificate - Form 3.pdf | 9 Mar 2019 |
| Certificates of CA (Form 5)File: Form 5.pdf | 9 Mar 2019 |
| Layout approvalFile: Layout.pdf | 31 Jul 2017 |
| Building plan approvalFile: IOD.pdf | 31 Jul 2017 |
| PAN CardFile: PAN of Dhridendra Developer.pdf | 31 Jul 2017 |
| Copy of the legal title reportFile: 1Title Certificate-COMPRESSED.pdf | 31 Jul 2017 |
| Copy of the legal title reportFile: 2Title Certificate COMPRESSED.pdf | 31 Jul 2017 |
| Copy of the legal title reportFile: 3Title Certificate- COMPRESSED.pdf | 31 Jul 2017 |
| Details of encumbrancesFile: No Encumbrance Certificate.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: IOD.pdf | 31 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 31 Jul 2017 |
| Declaration in FORM BFile: FORM B.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 1.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate1.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: CA certificate letter.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: AGREEMENT FOR SALE (RERA) - July 17.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: LETTER OF ALLOTMENT - July 17 (RERA).pdf | 31 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 69 filed documents as one ZIP, foldered, with a manifest
Keep Dridhena Developers and Realtors on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Borivali6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 344 registered projects within 2 km.
NIRLON EMPLOYEES COOPERATIVE HOUSING SOCIETY L
SHIVAM PARIVAR DEVELOPERS PVT LTD
GUNDECHA REXON SUITES PHASE 1
ANAYA INFRASTRUCTURE PVT LTD
PALAI TOWERS
N D DEVELOPERS
AGARWAL FLORENCE
PARAM ANAND BUILDERS LLP
KRISHNA KUNJ PHASE 1
PRINCE HOUSING AND HOSPITALITY PRIVATE LIM
NIRLON EMPLOYEES CHS LTD BUILDING NO. 10
Shivam Parivar Developers Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: Dridhena Developers and Realtors
Dridhena Developers and Realtors has 1 registration on MahaRERA, including Dridhena Developers and Realtors. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Dridhena Developers and Realtors is delayed beyond 31 Mar 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Dridhena Developers and Realtors?
The registered promoter entity is Dridhena Developers and Realtors, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Dridhena Developers and Realtors?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Dridhena Developers and Realtors?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Dridhena Developers and Realtors?
The professionals named in the filing: Architect: NEOCON Infrastructure Services Pvt Ltd; Engineer: R D Magdum. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Dridhena Developers and Realtors?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback