Registration lapsed No litigation declared Residential / Group Housing project

Dreams Solace D E F wings

By Dreams Construction Pvt. Ltd.

RG-MH-08597 · RERA P52100001538 · Last updated on MahaRERA portal: 12 Dec 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 40 months past the filed date
  • 2 complaints at MahaRERA
  • Completion date moved by 48 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2023Possession promised40 months past this date
30 of 44Construction stages doneacross 4 buildings; furthest along: Sanitary Fittings within the flats /..., 90%
2Complaints at MahaRERAon this registration
Jump to the 38 documents Report an error

Dreams Solace D E F wings is a Residential / Group Housing project by Dreams Construction Pvt. Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100001538 on 28 Jul 2017. Possession was promised by 30 Jun 2023 and is now 40 months past that date. The completion date has moved by 48 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameDreams Solace D E F wings
  • TypeResidential / Group Housing
  • Location
    • Hadapsar
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100001538
  • ReraGenie IDRG-MH-08597

Builder

  • NameDreams Construction Pvt. Ltd.
  • Entity typeCompany
  • Other registrations2 more →
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

40 months past promisethis monthRegisteredJul 2017First promiseJun 2019Revised toJun 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on28 Jul 2017
  • Promised completion30 Jun 2023
  • Revised completionRevised to 30 Jun 2023 (originally 30 Jun 2019)
  • Buildings4 building records
  • Documents filed38 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D wingNA130000
E wingNA60000
F wingNA60000
Club HouseNA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 12 Dec 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

D wing91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E wing41%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
F wing82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Club House91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 12 Dec 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes65%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes60%
Street LightingYes60%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes80%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes60%

Parking filed70

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots70
Closed/Covered32
Open Space38
BuildingClosed/CoveredOpen SpaceTotal
D wing161127
E wing81321
F wing81422

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,459 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
Pankaj BuildersHadapsarPune
Lahu Hiraman MagarHadapsarPune
Piraji Baban MagarMundhawaPune
Maruti Hanumant MagarMundhawaPune
Kaluram Baburao TupeHadapsarPune
Vishwas Kaluram TupeHadapsarPune

Approvals and building plan

Permissible FSI3192.7
Proposed, not sanctioned3,193 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNear Hadapsar Bhaji Market Gandhi Chowk Hadapsar Pune 411028

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Shripad Padhye
EngineerCicom Consultants
PartnerRole in project
Dreams Construction Pvt. Ltd.-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100011360Jun 2019 → Dec 2022

Reason as filed by the promoterWe have completed D wing and got the occupancy certificate which is uploaded. Now we have starting construction activity in F wing. Out of 16 flats in E & F building we have registered 10 no of flats. Remaining 5 flats are cancelled. So we are requesting to get project expiry date to extended till 31/12/2022.

EXT52100001954Jun 2019 → Jun 2020

Reason as filed by the promoterDue to duel effect of Demonetisation and GST, the cash flow was badly hampered...

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC005000000022018RAHUL BHARAT VEDPATHAKDREAMS CONSTRUCTION PVT LTD19/11/2018
CC005000000106571Ashutosh Ashok AbnaveDreams Constructions Pvt Ltd15/02/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Dec 2023

Documents filed38

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Dreams Solace E F sold Booked Inventory .pdf12 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1 Occupancy Certificate_ Completion Certificate_ Architect's certificate of completion for12 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate solace.pdf5 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_s Certificate.pdf5 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineers Certificate for Quality Assurance 2022.pdf5 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineers Certificate for Quality Assurance 2023.pdf5 Dec 2023
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory.pdf5 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Annual Report on Statement of Account 2022.pdf5 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Annual report on Statement of Account 2023.pdf5 Dec 2023
Other - FinanceFile: Dreams Rajaram NOCs (2).pdf1 Sep 2022
Other - FinanceFile: Dreams Rajaram Release Deed_11zon.pdf1 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Annual report on statement of accounts FY 2018-19.pdf29 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Annual report on statement of accounts FY 2019-20.pdf29 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Annual report on statement of accounts FY 2020-21.pdf29 Jan 2022
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf28 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers Certificate 1.pdf28 Jan 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf28 Jan 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate of D Wing.pdf24 Jan 2022
Certificates of CA (Form 5)File: Dreams Solace Form5.pdf25 Jul 2019
Building plan approvalFile: Solace sanctioned plan 2.pdf12 Jul 2017
Building plan approvalFile: Solace sanctioned plan 3.pdf12 Jul 2017
Building plan approvalFile: Solace sanctioned plan 4.pdf12 Jul 2017
Building plan approvalFile: Solace sanctioned plan 5.pdf12 Jul 2017
Layout approvalFile: Solace sanctioned layout 1.pdf12 Jul 2017
PAN CardFile: Pan Card of Dreams Construction Pvt Ltd-1.pdf12 Jul 2017
Copy of the legal title reportFile: Search Report.pdf12 Jul 2017
Details of encumbrancesFile: encumbrances documents.pdf12 Jul 2017
Copy of Layout Approval (in case of layout)File: Solace sanctioned layout 1.pdf12 Jul 2017
Building Plan Approval (IOD)File: Solace sanctioned plan 2.pdf12 Jul 2017
Building Plan Approval (IOD)File: Solace sanctioned plan 3.pdf12 Jul 2017
Building Plan Approval (IOD)File: Solace sanctioned plan 4.pdf12 Jul 2017
Building Plan Approval (IOD)File: Solace sanctioned plan 5.pdf12 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Solace CC .pdf12 Jul 2017
Declaration in FORM BFile: Affidavit Cum Declaration - from Promoters.pdf12 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Solace Ar Certificate ( form 1 ).pdf12 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE - SOLACE - JUNE 2017.pdf12 Jul 2017
Certificates of CA (Form 3)File: Solace Form 3.pdf12 Jul 2017
Proforma of Allotment letterFile: Dreams Solace - MahaRERA - DRAFT of Agreement for Sale .pdf12 Jul 2017

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Dreams Rachana A B wingsS no 304 1 Hadapsar Tal Haveli Dist Pune 41102874CompletedSep 2014Late, Apr 2015
Dreams Sankalp A to H wingsGat no 862 P Wagholi Tal Haveli Dist Pune336CompletedJun 2014Late, Dec 2016
Dreams Camellia A1 A2 DS No 268 Bavdhan Budruk Tal Mulshi Dist Pune 41102129CompletedJul 2013Late, Aug 2014
Dreams Solace A to C wingsS no 69 6C 2 1 Hadapsar Tal haveli dist Pune 41102872CompletedAug 2012Late, Sep 2012

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 48 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Dreams Solace D E F wings on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hadapsar13,700+ in Pune

2 kmDreams Solace D E F wingCompleted 34Lapsed / revoked 12Other 47Dot size: filed unitsN

Filed coordinates, straight-line distance. 93 registered projects within 2 km.

Builder: Dreams Construction Pvt. Ltd.

Dreams Construction Pvt. Ltd. has 3 registrations on MahaRERA, including Dreams Sankalp L M wings and Dreams Rachana C D wings. Its filings disclose 5 earlier MahaRERA projects: declares 0 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Dreams Solace D E F wings shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Dreams Solace D E F wings is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dreams Solace D E F wings?

The registered promoter entity is Dreams Construction Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dreams Solace D E F wings?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Dreams Solace D E F wings?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Dreams Solace D E F wings?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dreams Solace D E F wings?

The professionals named in the filing: Architect: Ar Shripad Padhye; Engineer: Cicom Consultants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dreams Solace D E F wings?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dreams Solace D E F wings. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dreams Solace D E F wings to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.