Home / Browse projects / Pune, Maharashtra / Dreams Rachana C D wings

Registration lapsed No litigation declared Others project

Dreams Rachana C D wings

By Dreams Construction Pvt. Ltd.

RG-MH-07837 · RERA P52100000273 · Last updated on MahaRERA portal: 29 Oct 2022

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 40 months past the filed date
  • Completion date moved by 48 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2023Possession promised40 months past this date
13 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 90%
0Complaints at MahaRERAon this registration
Jump to the 30 documents Report an error

Dreams Rachana C D wings is a Others project by Dreams Construction Pvt. Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100000273 on 12 Jul 2017. Possession was promised by 28 Jun 2023 and is now 40 months past that date. The completion date has moved by 48 months from the original filing.

At a glance

Project

  • NameDreams Rachana C D wings
  • TypeOthers
  • Location
    • Hadapsar
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000273
  • ReraGenie IDRG-MH-07837

Builder

  • NameDreams Construction Pvt. Ltd.
  • Entity typeCompany
  • Other registrations2 more →
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

40 months past promisethis monthRegisteredJul 2017First promiseJun 2019Revised toJun 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on12 Jul 2017
  • Promised completion28 Jun 2023
  • Revised completionRevised to 28 Jun 2023 (originally 30 Jun 2019)
  • Buildings3 building records
  • Documents filed30 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C wingNA90000
D wingNA90000
Club HouseNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 29 Oct 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 90%.

C wing56%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D wing89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Club House0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Oct 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes60%
Street LightingYes40%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes50%

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Closed/Covered8
Open Space8
BuildingClosed/CoveredOpen SpaceTotal
C wing505
D wing3710
Club House011

Land and ownership11

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,245 sq m
Land owned byThe promoter, with other names on the file
Named landowners11
LandownerVillageDistrict
Tukaram Genu NhavaleHadapsarPune
Baban Genu NhavaleHadapsarPune
Ashok Keraba NhavaleHadapsarPune
Fulabai Keraba NhavaleHadapsarPune
Alka Vilas NhavaleHadapsarPune
Sunita Vishal NhavaleHadapsarPune
Gaurav Vishal NhavaleHadapsarPune
Devashish vishal NhavaleHadapsarPune
Balasaheb Keraba NhavaleHadapsarPune
Santosh Vilas NhavaleHadapsarPune
BALASAHEB KERBA NHAVLEHadapsarPune

Approvals and building plan

Permissible FSI2642.81
Proposed, not sanctioned2,561 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNear Hadapsar Bhaji Market, Gandhi Chowk, Hadapsar, Pune -411028

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Shripad Padhye
EngineerCicom Consultants
PartnerRole in project
Dreams Construction Pvt. Ltd.-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100005640Jun 2019 → Jun 2020

Reason as filed by the promoterDue to duel effect of demonetization and GST the cash flow was badly hampered.

EXT52100009885Jun 2019 → Dec 2021

Reason as filed by the promoter95% of the construction work of D Wing is complete. We have to get required NOC'S from competent authority. after getting noc's we can apply for occupancy certificate. We have initiated the process of getting noc's. So we need extension up till 28 december. The Extension required to the sale of Flats in D wing, as we have not open sale plan for C wing.

EXT52100012388Jun 2019 → Jun 2023

Reason as filed by the promoterThe discrepancy in the Extension details in the Format B was because of categorizing Flats as sold, unsold, booked. Now we have kept only sold & unsold categories. So the Consent earlier was 75 percent has come down to 70 percent.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed30

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration about Commencement CertificateFile: FORMAT D DECLARATION ABOUT COMMENCEMENT CERT.pdf29 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architech Certificate.pdf29 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A ENGINEERS CERTIFICATE FOR QUALITY ASSURANCE .pdf29 Oct 2022
Disclosure of sold/ booked inventoryFile: Sold unsold Inventory.pdf29 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 Annual report on SOA.pdf29 Oct 2022
Declaration about Commencement CertificateFile: Commencement Certificates.pdf12 Aug 2021
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate Dreams Rachana.pdf12 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers Certificate on Quality Assurance (Form 2A FY 2020-21).pdf6 Aug 2021
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf6 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Annual Audit Report of Statutory CA (Form 5) (FY 2017-18).pdf6 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Annual Audit Report of Statutory CA (Form 5) (FY 2018-19).pdf6 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Annual Audit Report of Statutory CA (Form 5) (FY 2019-20).pdf6 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Annual Audit Report of Statutory CA (Form 5) (FY 2020-21).pdf6 Aug 2021
Building plan approvalFile: Rachana sanctioned plan 4.pdf10 Jul 2017
Building plan approvalFile: Rachana sanctioned plan3.pdf10 Jul 2017
Building plan approvalFile: Rachana sanctioned plan 2.pdf10 Jul 2017
Layout approvalFile: Rachana Sanctioned layout 1.pdf10 Jul 2017
Copy of Layout Approval (in case of layout)File: Rachana Sanctioned layout 1.pdf10 Jul 2017
Building Plan Approval (IOD)File: Rachana sanctioned plan 4.pdf10 Jul 2017
Building Plan Approval (IOD)File: Rachana sanctioned plan3.pdf10 Jul 2017
Building Plan Approval (IOD)File: Rachana sanctioned plan 2.pdf10 Jul 2017
Certificates of CA (Form 3)File: Rachana Form 3.pdf10 Jul 2017
PAN CardFile: Pan Card of Dreams Construction Pvt Ltd-1.pdf6 Jul 2017
Copy of the legal title reportFile: Search Report.pdf6 Jul 2017
Details of encumbrancesFile: encumbrances document.pdf6 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf6 Jul 2017
Declaration in FORM BFile: Affidavit Cum Declaration - from Promoters.pdf6 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rachana Ar Certificate ( form 1 ).pdf6 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE - RACHANA - JUNE 2017.pdf6 Jul 2017
Proforma of Allotment letterFile: Dreams Rachana - MahaRERA - DRAFT of Agreement for Sale .pdf6 Jul 2017

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Dreams Rachana A B wingsS no 304 1 Hadapsar Tal Haveli Dist Pune 41102874CompletedSep 2014Late, Apr 2015
Dreams Sankalp A to H wingsGat No 862 P Wagholi Tal Haveli Dist Pune 412207336CompletedJun 2014Late, Dec 2016
Dreams Camellia A1 A2 DS No 268 Bavdhan Budruk Tal Mawal Dist Pune 41102129CompletedJul 2013Late, Aug 2014
Dreams Solace A to C wingsS no 69 6C 2 69 2C 1 Hadapsar Tal Haveli Dist Pune 41102872CompletedAug 2012Late, Sep 2012

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 48 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Dreams Rachana C D wings on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hadapsar13,700+ in Pune

2 kmDreams Rachana C D wingsCompleted 42Lapsed / revoked 15Other 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 99 registered projects within 2 km.

Builder: Dreams Construction Pvt. Ltd.

Dreams Construction Pvt. Ltd. has 3 registrations on MahaRERA, including Dreams Sankalp L M wings and Dreams Rachana C D wings. Its filings disclose 5 earlier MahaRERA projects: declares 0 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Dreams Rachana C D wings shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Dreams Rachana C D wings is delayed beyond 28 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dreams Rachana C D wings?

The registered promoter entity is Dreams Construction Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dreams Rachana C D wings?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Dreams Rachana C D wings?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dreams Rachana C D wings?

The professionals named in the filing: Architect: Ar Shripad Padhye; Engineer: Cicom Consultants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dreams Rachana C D wings?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dreams Rachana C D wings. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dreams Rachana C D wings to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.