RG-MH-01604 · RERA P52100000237 · Last updated on MahaRERA portal: 22 Mar 2022

Source: official MahaRERA filing

Red flags

  • 10 complaints at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2020Possession promisedregistration recorded completed
17 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 80%
10Complaints at MahaRERAon this registration
Jump to the 25 documents Report an error

Dreams Lynnea A B wings is a Residential / Group Housing project by Dreams Construction ( Pune) Pvt. Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100000237 on 10 Jul 2017. The registration is recorded completed; possession was promised by 30 Sep 2020. The completion date has moved by 18 months from the original filing. 10 complaints are on record with the regulator.

At a glance

Project

  • NameDreams Lynnea A B wings
  • TypeResidential / Group Housing
  • Location
    • WAGHOLI
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000237
  • ReraGenie IDRG-MH-01604

Builder

  • NameDreams Construction ( Pune) Pvt. Ltd.
  • Entity typeCompany

Key dates

this monthRegisteredJul 2017First promiseMar 2019Revised toSep 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 Jul 2017
  • Promised completion30 Sep 2020
  • Revised completionRevised to 30 Sep 2020 (originally 31 Mar 2019)
  • Buildings3 building records
  • Documents filed25 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A wingNA140000
B wingNA140000
Club HouseNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 22 Mar 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 80%.

A wing77%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.57%
B wing77%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.57%
Club House52%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Mar 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes10%
Landscaping & Tree PlantingYes25%
Street LightingYes70%
Community BuildingsYes70%
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes10%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationYes25%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes50%

Parking filed152

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots152
Closed/Covered90
Open Space62
BuildingClosed/CoveredOpen SpaceTotal
A wing473380
B wing432972

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,550 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Greenmark PropertiesPune (M Corp.)Pune

Approvals and building plan

Permissible FSI10069.92
Proposed, not sanctioned9,143 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIndra Pushti Opp Fergussion College Gate No 2 Pune 411004

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Shripad Padhye
EngineerCicom Consultants
PartnerRole in project
Dreams Construction ( Pune) Pvt. Ltd.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100001681Mar 2019 → Mar 2020

Reason as filed by the promoterDue to duel impact of GST & Demonetisation the clash flow was badly hampered...

Complaints filed with MahaRERA10

Case no.ComplainantRespondentFiled
CC005000000011704AMIT HARIBHAU BHAGWATDreams Lynnea Through its Signatory Dream Construction pune Pvt.Ltd03/07/2018
CC005000000011544Prasad Raghunath KhandareRamesh Ghisulal Mehta20/05/2018
CC005000000022871GULSHAN KUMARDreams Construction (PUne) P Limited12/04/2019
CC005000000033532Indu JhaDreams Construction (Pune) Pvt. Ltd through it's Director Mr. Ramesh Ghisulal Mehta14/10/2019
CC005000000023104DHARAMDAS TRILOKCHANDANIDREAMS CONSTRUCTION (PUNE) PVT. LTD14/06/2019
CC005000000033461Rakesh Kumar SealUmesh Ambardekar29/09/2019
CC005000000053886Kaavya TrilokchandaniRamesh Ghisulal Mehta04/01/2020
CC005000000054037Haresh Prakshlal KundalDreams Constructions (Pune) Pvt Ltd Company17/02/2020
CC005000000054035Lalit H NihalaniDreams Construction (Pune) Pvt Ltd company17/02/2020
CC005000000054034Shivkumar Chanchaldas TrilokchandaniDreams Constructions (Pune) Pvt. Ltd. Company14/02/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Dec 2021

Documents filed25

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate dreams lynnea.pdf22 Mar 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: lynea completion.pdf17 Dec 2021
Architect’s Certificate on Completion of Project (Form 4)File: ARCHITECTS CERT FORM 4.pdf5 Feb 2021
OtherFile: lynnea-declaration.pdf29 Oct 2020
Certificates of CA (Form 5)File: Dreams Lynnea A B Mar2018.pdf17 Apr 2019
Layout approvalFile: Lynnea Sanctioned layout 1.pdf5 Jul 2017
Building plan approvalFile: Lynnea Sanctioned Plans 2-3.pdf5 Jul 2017
Building plan approvalFile: Lynnea sanctioned Plans 4.pdf5 Jul 2017
Building plan approvalFile: Lynnea Sanctioned Plans 5.pdf5 Jul 2017
Building plan approvalFile: Lynnea Sanctioned Plans 6.pdf5 Jul 2017
Copy of Layout Approval (in case of layout)File: Lynnea Sanctioned layout 1.pdf5 Jul 2017
Building Plan Approval (IOD)File: Lynnea Sanctioned Plans 2-3.pdf5 Jul 2017
Building Plan Approval (IOD)File: Lynnea sanctioned Plans 4.pdf5 Jul 2017
Building Plan Approval (IOD)File: Lynnea Sanctioned Plans 5.pdf5 Jul 2017
Building Plan Approval (IOD)File: Lynnea Sanctioned Plans 6.pdf5 Jul 2017
Details of encumbrancesFile: Self Certification.pdf3 Jul 2017
Declaration in FORM BFile: Affidavit Cum Declaration - from Promoters.pdf3 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE - LYNNEA - JUNE 2017.pdf3 Jul 2017
Proforma of Allotment letterFile: Lynnea - MahaRERA - DRAFT of Agreement for Sale .pdf3 Jul 2017
PAN CardFile: PAN Dreams Construction Pune Pvt Ltd.pdf1 Jul 2017
Copy of the legal title reportFile: Search Report.pdf1 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: N A Order - 2014.pdf1 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate Dreams Lynnea A wing Form 1.pdf1 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's certificate Dreams Lynnea B wing Form 1.pdf1 Jul 2017
Certificates of CA (Form 3)File: Form 3 CA's Certificate.pdf1 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 18 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Dreams Lynnea A B wings on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAGHOLI13,700+ in Pune

2 kmDreams Lynnea A B wingsCompleted 67Lapsed / revoked 27Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 138 registered projects within 2 km.

Builder: Dreams Construction ( Pune) Pvt. Ltd.

Dreams Construction ( Pune) Pvt. Ltd. has 1 registration on MahaRERA, including Dreams Lynnea A B wings. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Dreams Lynnea A B wings is delayed beyond 30 Sep 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dreams Lynnea A B wings?

The registered promoter entity is Dreams Construction ( Pune) Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dreams Lynnea A B wings?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Dreams Lynnea A B wings?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Dreams Lynnea A B wings?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dreams Lynnea A B wings?

The professionals named in the filing: Architect: Ar Shripad Padhye; Engineer: Cicom Consultants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dreams Lynnea A B wings?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dreams Lynnea A B wings. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dreams Lynnea A B wings to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.