Home / Browse projects / Palghar, Maharashtra / Dream Residency
Dream Residency
RG-MH-89141 · RERA P99000048917 · Last updated on MahaRERA portal: 6 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Dream Residency is a Residential / Group Housing project by Trimurti Enterprise in Palghar, Maharashtra, registered with MahaRERA as P99000048917 on 24 Jan 2023. Possession is promised by 31 May 2027. 14 of the 48 units on this registration are recorded sold or booked, and 13 of 22 construction stages are filed complete.
At a glance
Project
- NameDream Residency
- TypeResidential / Group Housing
- Location
- AshokVan Data Mandir
- Wada
- Vada (CT)
- Vada
- Palghar
- 421303
- Pincode421303
- RERA no.P99000048917
- ReraGenie IDRG-MH-89141
Builder
- NameTrimurti Enterprise
- Entity typePartnership
- PartnersJayant Ashok Jadhav, Bharat Ashok Jadhav
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on24 Jan 2023
- Promised completion31 May 2027
- Revised completionNone
- Buildings2 building records
- Documents filed87 files
Current status
Figures as on 6 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Sonchapha | NA | 7 | 7 | 24 | 0 | 24 |
| Building No 3 | NA | 1 | 1 | 24 | 0 | 24 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 6 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
13 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
Sonchapha91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building No 327%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 6 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed6
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership3
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Nitin Ashok Jadhav | Thane (M Corp.) | Thane |
| Jayant Ashok Jadhav | Thane (M Corp.) | Thane |
| Bharat Ashok Jadhav | Vada (CT) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Sonchapha | NA | Rs 2.45 cr | Rs 2.45 cr |
| Building No 3 | NA | Rs 1.75 cr | Rs 26.25 lakh |
| - | NA | Rs 40.00 lakh | Rs 10.00 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vision Architects |
| Engineer | Vinayak Chopdekar and Associates |
| Engineer | Pranali Jadhav |
| Chartered Accountant | Kapure & Kapure Chartered Accountant |
| Chartered Accountant | Shripati Gandi Choudhari & Co Chartered Accountant |
| Partner | Role in project |
|---|---|
| Trimurti Enterprise | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Nov 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Oct 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Oct 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 May 2027
Documents filed87
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A March 26.pdf | 6 Jul 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: Signed Form 3_compressed.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Dec 25.pdf | 17 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Dec 25.pdf | 17 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - Trimurti enterprise Dec 25_compressed.pdf | 17 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Sep 25.pdf | 31 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 Sep 25.pdf | 31 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Sep 25_compressed.pdf | 31 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Dream Residency March 25.pdf | 1 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 June 25.pdf | 23 Aug 2025 |
| Withdrawal Update Form 2File: Form 2 June 25.pdf | 23 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 - Trimurti enterprise June 2025.pdf | 23 Aug 2025 |
| Withdrawal Update Form 1File: Form 1 June 25.pdf | 7 Aug 2025 |
| Withdrawal Update Form 2File: Form 2 June 25.pdf | 7 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 - Trimurti enterprise June 2025.pdf | 7 Aug 2025 |
| Form 1File: Form 1 March 25.pdf | 20 Jun 2025 |
| Form 2File: Form 2 March 25.pdf | 20 Jun 2025 |
| Form 3File: Form 3 - Trimurti enterprise March 25_compressed.pdf | 20 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold_Booked Inventory - Trimurti Enterprises - March 25.pdf | 20 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Trimurti enterprise March 25_compressed.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 25.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory - Trimurti Enterprises - March 25.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 25.pdf | 12 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 March 24.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 24.pdf | 22 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 24.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Trimurti enterprise Dec 24 Signed copy_compressed.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory - Trimurti Enterprises - Dec 24.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 30 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Trimurti enterprise Sep 24_compressed.pdf | 30 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory - Trimurti Enterprises - Sep 24.pdf | 30 Oct 2024 |
| Layout approvalFile: Plan .pdf | 17 Oct 2024 |
| Building plan approvalFile: Plan .pdf | 17 Oct 2024 |
| Copy of Layout Approval (in case of layout)File: Plan .pdf | 17 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 17 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan .pdf | 17 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory - Trimurti Enterprises - June 24.pdf | 8 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Trimurti enterprise June 24_compressed.pdf | 8 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: VINAYAK CHOPDEKAR and ASSOCIATES.pdf | 20 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Signed Form 2A.pdf | 12 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: site Engineers Certificate 2024.pdf | 12 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 24.pdf | 17 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 March 24.pdf | 17 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory - Trimurti Enterprises - March 24.pdf | 17 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Trimurti enterprise Mar 24.pdf | 17 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Trimurti Enterprises Dec 23.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Enginer Certificate Dec 23.pdf | 20 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory - Trimurti Enterprises - Dec 2023.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Trimurti enterprise Dec 2023_compressed.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From -1 Dream Residency Sep 23_compressed.pdf | 9 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From -2 Dream Residency Sep 23_compressed.pdf | 9 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 Trimurti Enterprises Sep 23 Sined Copy_compressed.pdf | 9 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1.pdf | 2 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2.pdf | 2 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 June 23.pdf | 2 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form -5 March 2023.pdf | 22 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 16 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 16 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form -3_compressed.pdf | 16 Jun 2023 |
| Other - TechnicalFile: FINAL APPROVED DWG WITH STAMP.pdf | 17 Jan 2023 |
| Other - TechnicalFile: Declaration_TRimurti.pdf | 17 Jan 2023 |
| Layout approvalFile: FINAL APPROVED DWG WITH STAMP-2_compressed.pdf | 5 Jan 2023 |
| Building plan approvalFile: FINAL APPROVED DWG WITH STAMP-2_compressed.pdf | 5 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: FINAL APPROVED DWG WITH STAMP-2_compressed.pdf | 5 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: FINAL APPROVED DWG WITH STAMP-2_compressed.pdf | 5 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other rera organisation .pdf | 5 Jan 2023 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE -RERA 211222.pdf | 21 Dec 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation AFS - 211222_compressed.pdf | 21 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed.pdf | 25 Nov 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -_compressed.pdf | 25 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 25 Nov 2022 |
| Deviation Report with respect to Allotment letterFile: Deviataion Allotment letter.pdf | 25 Nov 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200253106990_For_Asset_Based_Search_24_11_2022_17_01_14_030.pdf | 24 Nov 2022 |
| Proforma of Allotment letterFile: Allotment letter_compressed.pdf | 24 Nov 2022 |
| PAN CardFile: Pan card entity.pdf | 19 Nov 2022 |
| Copy of the legal title reportFile: Title report.pdf | 19 Nov 2022 |
| Details of encumbrances concerned to FinanceFile: Declaration for no encumbrace finance.pdf | 19 Nov 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 87 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Dream Residency on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Wada3,200+ in Palghar
WOLLYWOOD PHASE VI
NIRVANA LIFESTYLE VENTURES
Greenway
Greenway Properties
Rajeshree Plaza
Liva Infra Builders and Developers
ELEMENTS
MAYUR VAN CLUB AND HOLIDAY RESORTS PRIVATE
BALKRUSHNA SANKUL
Sai Construction
Sontakke Arcade
SIDDHIVINAYAK DEVELOPERS
See every Palghar project, with the district possession charts
Builder: Trimurti Enterprise
Trimurti Enterprise has 1 registration on MahaRERA, including Dream Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if Dream Residency is delayed beyond 31 May 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Dream Residency?
The registered promoter entity is Trimurti Enterprise, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Dream Residency?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Dream Residency?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Dream Residency?
The professionals named in the filing: Architect: Vision Architects; Engineer: Vinayak Chopdekar and Associates; Engineer: Pranali Jadhav; Chartered Accountant: Kapure & Kapure Chartered Accountant; Chartered Accountant: Shripati Gandi Choudhari & Co Chartered Accountant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Dream Residency?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback