DP STAR TRIVENI
RG-MH-26454 · RERA P51800004550 · Last updated on MahaRERA portal: 20 Jan 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 36 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DP STAR TRIVENI is a Residential / Group Housing project by DP BUILDHOMES LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800004550 on 9 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2024. The completion date has moved by 36 months from the original filing.
At a glance
Project
- NameDP STAR TRIVENI
- TypeResidential / Group Housing
- Location
- DATTA MANDIR ROAD
- BHANDUP WEST
- Kurla
- Mumbai Suburban
- 400078
- Pincode400078
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800004550
- ReraGenie IDRG-MH-26454
Builder
- NameDP BUILDHOMES LLP
- Entity typePartnership
- PartnersSomraj Trilok Dua, Surinderkumar Bansilal Sharma
- PartnerRAJAN DUA
- Other registrations3 more →
- Completed2 of 4
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on9 Aug 2017
- Promised completion31 Dec 2024
- Revised completionRevised to 31 Dec 2024 (originally 15 Dec 2021)
- Buildings1 building record
- Documents filed246 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| DP STAR TRIVENI | NA | 22 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.
DP STAR TRIVENI: 85% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 20 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed49
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | G S Gokhale |
| Engineer | Ranjan Chandrakant Tipnis |
| Partner | Role in project |
|---|---|
| DP BUILDHOMES LLP | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAS PER ATTACHMENT
Reason as filed by the promoterWe have Real Estate project registered with MahaRERA authority with name “DP Star Triveni” vide Certificate No. P51800004550 dated 09/08/2017. Due date for the completion of the project as estimated at the time of the registration is 15/12/2021. We seek extension of one year for due date of completion of the project that is 15/12/2022. Major reasons due to which we seek extension are as follows. 1. Statutory permissions/clearances from various authorities are pending. We are in the process of applying for same. CC permission shall be applied for in 3 months’ time after which we shall require 3
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Jul 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Jul 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 14 Aug 2024
Documents filed246
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 246 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Triveni.pdf | 20 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Triveni.pdf | 28 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rera form 2 Engineer Certificate - Triveni.pdf | 28 Nov 2024 |
| Certificates of CA (Form 3)File: Final Form 3 - Triveni.pdf | 30 Oct 2024 |
| Certificates of CA (Form 3)File: Final Form 3 - March 24 - Triveni_compressed.pdf | 30 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2419747_OC_signed.pdf | 14 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 triveni c wing.pdf | 13 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Triveni Wing C.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 triveni c wing.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Triveni Wing C.pdf | 13 Aug 2024 |
| Layout approvalFile: HPSC4546 pg 1.pdf | 26 Jul 2024 |
| Building plan approvalFile: HPSC4547 pg 2.pdf | 26 Jul 2024 |
| Building plan approvalFile: HPSC4548 pg3.pdf | 26 Jul 2024 |
| Building plan approvalFile: HPSC4549 pg 4.pdf | 26 Jul 2024 |
| Building plan approvalFile: HPSC4550 pg5.pdf | 26 Jul 2024 |
| Building plan approvalFile: HPSC4551 pg 6.pdf | 26 Jul 2024 |
| Building plan approvalFile: HPSC4552 pg 7.pdf | 26 Jul 2024 |
| Building plan approvalFile: HPSC4553 pg 8.pdf | 26 Jul 2024 |
| Building plan approvalFile: HPSC4554 pg 9.pdf | 26 Jul 2024 |
| Building plan approvalFile: HPSC4555 pg 10.pdf | 26 Jul 2024 |
| Building plan approvalFile: HPSC4556 pg 11.pdf | 26 Jul 2024 |
| Building plan approvalFile: HPSC4557 pg 12.pdf | 26 Jul 2024 |
| Building plan approvalFile: HPSC4558 pg 13.pdf | 26 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: HPSC4546 pg 1.pdf | 26 Jul 2024 |
| Building Plan Approval (IOD)File: HPSC4547 pg 2.pdf | 26 Jul 2024 |
| Building Plan Approval (IOD)File: HPSC4548 pg3.pdf | 26 Jul 2024 |
| Building Plan Approval (IOD)File: HPSC4549 pg 4.pdf | 26 Jul 2024 |
| Building Plan Approval (IOD)File: HPSC4550 pg5.pdf | 26 Jul 2024 |
| Building Plan Approval (IOD)File: HPSC4551 pg 6.pdf | 26 Jul 2024 |
| Building Plan Approval (IOD)File: HPSC4552 pg 7.pdf | 26 Jul 2024 |
| Building Plan Approval (IOD)File: HPSC4553 pg 8.pdf | 26 Jul 2024 |
| Building Plan Approval (IOD)File: HPSC4554 pg 9.pdf | 26 Jul 2024 |
| Building Plan Approval (IOD)File: HPSC4555 pg 10.pdf | 26 Jul 2024 |
| Building Plan Approval (IOD)File: HPSC4556 pg 11.pdf | 26 Jul 2024 |
| Building Plan Approval (IOD)File: HPSC4557 pg 12.pdf | 26 Jul 2024 |
| Building Plan Approval (IOD)File: HPSC4558 pg 13.pdf | 26 Jul 2024 |
| Certificates of CA (Form 3)File: form 3 triveni.pdf | 23 May 2024 |
| Certificates of CA (Form 3)File: Rera Form 3 Triveni-1-5.pdf | 23 May 2024 |
| Certificates of CA (Form 3)File: Rera Form 3 Triveni-6-11.pdf | 23 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Triveni March 2023.pdf | 1 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Form 1 Triveni.pdf | 30 Nov 2023 |
| Certificates of CA (Form 3)File: Form 3 Triveni June 23.pdf | 28 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Triveni Mar 23.pdf | 30 Sep 2023 |
| Declaration about Commencement CertificateFile: Declaration about CC Triveni.pdf | 23 Jun 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 2365053_FurtherCC_signed.pdf | 20 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure Sold Booked Inventory Triveni.pdf | 20 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Triveni.pdf | 17 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Form 2 Triveni.pdf | 17 Jun 2023 |
| Certificates of CA (Form 3)File: Triveni Rera Form 3 March 23.pdf | 17 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Triveni Form 5 21-22.pdf | 25 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM -1 Triveni Dec22.pdf | 25 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM -2 Triveni Dec22.pdf | 25 Feb 2023 |
| Certificates of CA (Form 3)File: Triveni Form 3 Dec 22.pdf | 25 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Form- 1 Triveni.pdf | 17 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Triveni.pdf | 17 Nov 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Triveni.pdf | 17 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: C Wing-Form2A-1st Quarter.pdf | 17 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Discolsure Triveni.pdf | 17 Nov 2022 |
| Certificates of CA (Form 3)File: DP Buildhomes LLP_Triveni.pdf | 17 Nov 2022 |
| Certificates of CA (Form 3)File: FORM 3 Triveni Sep 22.pdf | 17 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arhitects Certificates - Triveni C Wing.pdf | 18 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rera Form-2 Triveni C Wing.pdf | 18 Jul 2022 |
| Certificates of CA (Form 3)File: Triveni Form 3 Mar 22-1-5.pdf | 11 Jul 2022 |
| Certificates of CA (Form 3)File: Triveni Form 3 Mar 22-6-11.pdf | 11 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Triveni Discolsure of Sold Inventory April 2022.pdf | 28 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Triveni Form 5 Mar 21.pdf | 23 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: Triveni- Diclosure of Sold_Booked Inventory Dec 2021.pdf | 31 Mar 2022 |
| CERSAI detailsFile: CERSAI_Search_Report.pdf | 29 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form-5 Triveni Mar 19.pdf | 29 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form-5 Triveni Mar 20.pdf | 29 Mar 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Form 1 - Triveni Oct-Dec-21.pdf | 22 Mar 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Form 2 - Triveni Oct-Dec-21.pdf | 22 Mar 2022 |
| Certificates of CA (Form 3)File: Triveni_Form 3_Dec21-1-3.pdf | 22 Mar 2022 |
| Certificates of CA (Form 3)File: Triveni_Form 3_Dec21-4-6.pdf | 22 Mar 2022 |
| Certificates of CA (Form 3)File: Triveni_Form 3_Dec21-7-10.pdf | 22 Mar 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Further CC.pdf | 11 Feb 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Triveni Sep 21.pdf | 3 Nov 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Triveni Sep 21.pdf | 3 Nov 2021 |
| Certificates of CA (Form 3)File: Form 3 Sep 21- Triveni.pdf | 3 Nov 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Form 1 - Triveni.pdf | 22 Sep 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 246 filed documents as one ZIP, foldered, with a manifest
Keep DP STAR TRIVENI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BHANDUP WEST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 263 registered projects within 2 km.
Runwal Forests Tower 9 - 11
Wheelabrator Alloy Castings Limited
SHRADDHA VARDAAN
SHRADDHA LANDMARK PRIVATE LIMITED
SHRADDHA EVOQUE
SHRADDHA LANDMARK PRIVATE LIMITED
Sugee Vaayu
Sugee Developers Private Limited
SHRADDHA CLASSIC
SHRADDHA LANDMARK PRIVATE LIMITED
Om Siddhivinayak CHS Ltd
Shree Shiv Samarth Reality
See every Mumbai Suburban project, with the district possession charts
Builder: DP BUILDHOMES LLP
DP BUILDHOMES LLP has 4 registrations on MahaRERA, including DP STAR TRILOK and DP STAR TRINETRA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if DP STAR TRIVENI is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DP STAR TRIVENI?
The registered promoter entity is DP BUILDHOMES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DP STAR TRIVENI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DP STAR TRIVENI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DP STAR TRIVENI?
The professionals named in the filing: Architect: G S Gokhale; Engineer: Ranjan Chandrakant Tipnis. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DP STAR TRIVENI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback