Home / Browse projects / Mumbai Suburban, Maharashtra / DIVYA JYOT REWA ESTATE
DIVYA JYOT REWA ESTATE
RG-MH-06024 · RERA P51800054575 · Last updated on MahaRERA portal: 13 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 1 case
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DIVYA JYOT REWA ESTATE is a Residential / Group Housing project by DIVYA JYOT PROJECTS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800054575 on 31 Jan 2024. Possession is promised by 31 Dec 2026. 12 of the 93 units on this registration are recorded sold or booked, and 3 of 9 construction stages are filed complete.
At a glance
Project
- NameDIVYA JYOT REWA ESTATE
- TypeResidential / Group Housing
- Location
- P K ROAD
- OPP P & T COLONY
- Mulund
- Kurla
- Mumbai Suburban
- 400080
- Pincode400080
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800054575
- ReraGenie IDRG-MH-06024
Builder
- NameDIVYA JYOT PROJECTS LLP
- Entity typePartnership
- PartnersRAJESH GANGJI SAVLA, HASMUKH PRAVINCHANDRA SHAH, VISHANJI GANGJI GALA, KEVAL RAJESH SAVLA, KIRTIKUMAR KESHAVJI SAVLA
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on31 Jan 2024
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed78 files
Current status
Figures as on 13 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Rewa Estate | NA | 13 | 13 | 69 | 24 | 93 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 9 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 56%.
Rewa Estate: 62% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 56% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 51% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 35% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
Progress on shared amenities15
As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 35% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 35% |
| Storm Water Drains | Yes | 66% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | Not applicable |
| Solid Waste Management And Disposal | Yes | 65% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | Not applicable |
| Fire protection and fire safety requirements | Yes | 25% |
| Electrical meter room, sub-station, receiving station | Yes | 25% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed64
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Rewa Estate | NA | Rs 18.19 cr | Rs 10.93 cr |
| - | NA | Rs 5.50 cr | Rs 3.02 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DILIP SANGHVI CONSULTANTS |
| Architect | R P ASUNDARIA |
| Engineer | RC Tipnis |
| Engineer | nitin y vaidya |
| Chartered Accountant | Umang Dedhia & Co Chartered Accountants |
| Chartered Accountant | Shrenik Vora |
| Chartered Accountant | FORAM KOTHARI & ASSOCIATES |
| Partner | Role in project |
|---|---|
| DIVYA JYOT PROJECTS LLP | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 17187/2025 | BOMBAY HIGH COURT | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Dec 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Jan 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Nov 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed78
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: form 1.pdf | 13 Aug 2026 |
| Withdrawal Update Form 2File: form 2.pdf | 13 Aug 2026 |
| Withdrawal Update Form 3File: form 3.pdf | 13 Aug 2026 |
| Form 2A (FY 2025-2026)File: FORM 2A Dt 300626.pdf | 12 Aug 2026 |
| Withdrawal Update Form 1File: form 1.pdf | 22 Jun 2026 |
| Withdrawal Update Form 2File: INW5642 Form Engineer Certificate.pdf | 22 Jun 2026 |
| Withdrawal Update Form 3File: CA Form 3_organized.pdf | 22 Jun 2026 |
| Withdrawal Update Form 1File: Q3 FORM 1.pdf | 9 Jun 2026 |
| Withdrawal Update Form 1File: Q3 FORM 1.pdf | 9 Jun 2026 |
| Withdrawal Update Form 2File: Q3 FORM 2.pdf | 9 Jun 2026 |
| Withdrawal Update Form 2File: Q3 FORM 2.pdf | 9 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 9 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 9 Jun 2026 |
| Withdrawal Update Form 1File: Q2 FORM 1.pdf | 3 Jun 2026 |
| Withdrawal Update Form 2File: Q2 FORM 2.pdf | 3 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Q2 Final.pdf | 3 Jun 2026 |
| Building plan approvalFile: Latest CC Plan HIGHLIGHTED.pdf | 22 Nov 2025 |
| Building plan approvalFile: Latest CC Plan.pdf | 8 Nov 2025 |
| Commencement certificateFile: 2486195_FurtherCC_signed.pdf | 20 Jul 2025 |
| Building plan approvalFile: scrutiny ammend 4 drawing RE.pdf | 19 Jul 2025 |
| Form 1File: Form 1 Q4 24-25.pdf | 19 Jun 2025 |
| Form 2File: Form 2 Q4 24-25.pdf | 19 Jun 2025 |
| Form 3File: Form 3 Rera Q4 24-25_compressed (2).pdf | 19 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: INW3957 FORM 3 DISCLOSER20250619_12223523.pdf | 19 Jun 2025 |
| Form 1File: Form 1 Q3 24-25 Architecs Certificate RP Asundaria.pdf | 18 Jun 2025 |
| Form 2File: INW3592 Form 2 Q3 24-25.pdf | 18 Jun 2025 |
| Form 3File: INW3735 Form 3 Q3 24-25.pdf | 18 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold Booked Inventory Building Wise Q3 2023-2520250618_19491615.pdf | 18 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 12 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate on Project Cost and Fund withdrawal (Form 3).pdf | 12 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 12 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: INW3099 CA certificate umang dedhia form 3.pdf | 23 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30 09 2024.pdf | 21 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30 09 2024.pdf | 21 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 018 From 3 Certificate dtd 29 05 2024.pdf | 6 Aug 2024 |
| Details of encumbrances concerned to FinanceFile: 2_Encumbrance_concernedto_Finance.pdf | 18 May 2024 |
| Details of encumbrances concerned to LegalFile: 2_Encumbrance_concernedto_Finance.pdf | 18 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect Certificate_070524.pdf | 18 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer Certificate_100424.pdf | 18 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Final.pdf | 23 Jan 2024 |
| Layout approvalFile: 1.pdf | 11 Jan 2024 |
| Layout approvalFile: 2-3.pdf | 11 Jan 2024 |
| Layout approvalFile: 4-5.pdf | 11 Jan 2024 |
| Layout approvalFile: 6.pdf | 11 Jan 2024 |
| Layout approvalFile: 7.pdf | 11 Jan 2024 |
| Building plan approvalFile: 1.pdf | 11 Jan 2024 |
| Building plan approvalFile: 2-3.pdf | 11 Jan 2024 |
| Building plan approvalFile: 4-5.pdf | 11 Jan 2024 |
| Building plan approvalFile: 6.pdf | 11 Jan 2024 |
| Building plan approvalFile: 7.pdf | 11 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: 1.pdf | 11 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: 2-3.pdf | 11 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: 4-5.pdf | 11 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: 6.pdf | 11 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: 7.pdf | 11 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 1.pdf | 11 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2-3.pdf | 11 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 4-5.pdf | 11 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 6.pdf | 11 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 7.pdf | 11 Jan 2024 |
| CERSAI detailsFile: CERSAI Declaration for the project named Divya Jyot Rewa E.pdf | 9 Jan 2024 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate Format-D Dt 21 12 23.pdf | 21 Dec 2023 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 20 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: GetUserDocumentFileContent.pdf | 20 Dec 2023 |
| Details of encumbrances concerned to LegalFile: GetUserDocumentFileContent.pdf | 20 Dec 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200275135180_For_Asset_Based_Search_21_07_2023_18_45_19_675 (1).pdf | 20 Dec 2023 |
| Proforma of Agreement for saleFile: Agreement for Sale.pdf | 5 Aug 2023 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 5 Aug 2023 |
| Deviation Report with respect to Allotment letterFile: Declaration on deviation with allotment letter.pdf | 5 Aug 2023 |
| Deviation Report with respect to model copy of AgreementFile: Declaration on Deviation in Agreement for Sale with AFS model.pdf | 5 Aug 2023 |
| Declaration in FORM BFile: Declaration Form B.pdf | 1 Aug 2023 |
| PAN CardFile: Divya Jyot Projects LLP PAN_BW.pdf | 31 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance.pdf | 31 Jul 2023 |
| Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance.pdf | 31 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory.pdf | 31 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf | 31 Jul 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account for Real Estate Projects.pdf | 31 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 27 Jul 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 78 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DIVYA JYOT REWA ESTATE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near OPP P & T COLONY6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 518 registered projects within 2 km.
Eternia Towers A to D
Oberoi Constructions Limited
Bellanza Phase 1 - Wing A, B, C at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Atmosphere O2
Atmosphere Realty Pvt Ltd
Bellanza Phase 2 - Wing D, E, F at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Forest Hills Ph 1 at The Prestige City
PRESTIGE MULUND REALTY PRIVATE LIMITED
Kalpataru Elitus
Arimas Real Estate Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: DIVYA JYOT PROJECTS LLP
DIVYA JYOT PROJECTS LLP has 1 registration on MahaRERA, including DIVYA JYOT REWA ESTATE. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if DIVYA JYOT REWA ESTATE is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DIVYA JYOT REWA ESTATE?
The registered promoter entity is DIVYA JYOT PROJECTS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DIVYA JYOT REWA ESTATE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DIVYA JYOT REWA ESTATE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DIVYA JYOT REWA ESTATE?
The professionals named in the filing: Architect: DILIP SANGHVI CONSULTANTS; Architect: R P ASUNDARIA; Engineer: RC Tipnis; Engineer: nitin y vaidya; Chartered Accountant: Umang Dedhia & Co Chartered Accountants; Chartered Accountant: Shrenik Vora. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DIVYA JYOT REWA ESTATE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback