Home / Browse projects / Aurangabad, Maharashtra / DISHA KUNJBAN PHASE 1
DISHA KUNJBAN PHASE 1
By DEVANAND NARAYANRAO KOTGIRE (HUF)
RG-MH-00594 · RERA P51500001108 · Last updated on MahaRERA portal: 22 Nov 2022
Source: official MahaRERA filing
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DISHA KUNJBAN PHASE 1 is a Others project by DEVANAND NARAYANRAO KOTGIRE (HUF) in Aurangabad, Maharashtra, registered with MahaRERA as P51500001108 on 26 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2019. The completion date has moved by 12 months from the original filing.
At a glance
Project
- NameDISHA KUNJBAN PHASE 1
- TypeOthers
- Location
- Wadgaon Kolhati (CT)
- Aurangabad
- 431136
- Pincode431136
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51500001108
- ReraGenie IDRG-MH-00594
Builder
- NameDEVANAND NARAYANRAO KOTGIRE (HUF)
- Entity typeOthers
- Named personsDEVANAND NARAYANRAO KOTGIRE, ANITA DEVANAND KOTGIRE
- Other registrations3 more →
- Completed3 of 4
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on26 Jul 2017
- Promised completion31 Dec 2019
- Revised completionRevised to 31 Dec 2019 (originally 31 Dec 2018)
- Buildings3 building records
- Documents filed39 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| KUNJABAN BUILDING A1 A2 | NA | 6 | 0 | 0 | 0 | 0 |
| KUNJABAN BUILDING A3 | NA | 6 | 0 | 0 | 0 | 0 |
| KUNJBAN BUILDING B1 B2 | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 22 Nov 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.
KUNJABAN BUILDING A1 A291%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
KUNJABAN BUILDING A391%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
KUNJBAN BUILDING B1 B291%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 22 Nov 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed74
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| KUNJABAN BUILDING A1 A2 | 18 | 10 | 28 |
| KUNJABAN BUILDING A3 | 8 | 6 | 14 |
| KUNJBAN BUILDING B1 B2 | 32 | 0 | 32 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| CITY MANGAL CONSTRUCTION | Aurangabad (M Corp.) | Aurangabad |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AKW ASSOCIATES |
| Engineer | CORE CONSULTANTS |
| Partner | Role in project |
|---|---|
| DEVANAND NARAYANRAO KOTGIRE (HUF) | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe Promoter M/s Devanand Narayan Kotgire (HUF) has completed the project Disha Kunjaban Phase 1 on 05-04-2018, the application for completion as well as for Occupancy certificate is submitted with CIDCO authority on 05-04-2018.The application is pending with CIDCO authority since last 269 days.We, undertake that we will submit completion/occupancy certificate as soon as we receive from competent authority.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed39
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 - DISHA Kunjaban PHASE 1.pdf | 22 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 DNK (HUF) 1108 phase 1.pdf | 10 Jun 2020 |
| Certificates of CA (Form 3)File: DISHA KUNJABAN PHASE-I.pdf | 5 Oct 2019 |
| Certificates of CA (Form 3)File: Disha Kunjaban P-I Dt 10-01-2019 (1).pdf | 27 Feb 2019 |
| Certificates of Architect (Form 4)File: DK Phase I - FORM 4 31-10-18.PDF | 31 Dec 2018 |
| Certificates of CA (Form 3)File: Disha Kunjaban Phase-1 Dt08-10-18.pdf | 26 Dec 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DK Phase I - Arch Cert 31-10-18.PDF | 24 Dec 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DK Phase I - Engg Cert 31-03-18.PDF | 24 Dec 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DK Phase I - Engg Cert 31-07-18.PDF | 24 Dec 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DK Phase I - Engg Cert 31-10-18.PDF | 24 Dec 2018 |
| Certificates of CA (Form 3)File: Disha Kunjaban phase - I.pdf | 13 Dec 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DK Phase I - Architect Cert.PDF | 28 Nov 2018 |
| Certificates of CA (Form 5)File: DISHA KUNJBAN PAHSE I.pdf | 4 Nov 2018 |
| Certificates of CA (Form 3)File: Disha Kunjaban Phase 1.pdf | 25 Aug 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DK Phase I - ARC Cer - 30-4.PDF | 28 May 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DK PHASE I - Engg.PDF | 16 Feb 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DK PHASE I - Arch Certificate.PDF | 13 Feb 2018 |
| Certificates of CA (Form 3)File: Disha Kunjaban Phase-I.pdf | 2 Feb 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DK_PHASE_I_-_Architect_Certifiacte.pdf | 10 Nov 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DK_PHASE_I_-_Engg_Certificate.pdf | 10 Nov 2017 |
| Certificates of CA (Form 3)File: Disha Kunjaban Phase 1.pdf | 8 Nov 2017 |
| Declaration in FORM BFile: DK_Form_B_-_Dev_Phase_I.pdf | 24 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DK_Architect_Certificate_Phase_I.pdf | 24 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DK_Engineer_certificate_I.pdf | 24 Jul 2017 |
| Proforma of Allotment letterFile: DK_Agreement_to_sale_final_1-9.pdf | 24 Jul 2017 |
| Proforma of Allotment letterFile: DK_Agreement_to_sale_final_10-end.pdf | 24 Jul 2017 |
| Certificates of CA (Form 3)File: DISHA KUNJABAN CA Certificate phase -I.pdf | 23 Jul 2017 |
| Building plan approvalFile: DK 02 Bldg A1 A2.pdf | 21 Jul 2017 |
| Building plan approvalFile: DK 04 Bldg A3.pdf | 21 Jul 2017 |
| Building plan approvalFile: DK 05 Bldg B1 B2 B3 B4.pdf | 21 Jul 2017 |
| Copy of the legal title reportFile: DK_Tiltle_cum_serach_report_-_Vaza.pdf | 21 Jul 2017 |
| Details of encumbrancesFile: DK_Index_II.pdf | 21 Jul 2017 |
| Building Plan Approval (IOD)File: DK 02 Bldg A1 A2.pdf | 21 Jul 2017 |
| Building Plan Approval (IOD)File: DK 04 Bldg A3.pdf | 21 Jul 2017 |
| Building Plan Approval (IOD)File: DK 05 Bldg B1 B2 B3 B4.pdf | 21 Jul 2017 |
| Layout approvalFile: DK 01 Layout - Kunjaban.pdf | 16 Jul 2017 |
| PAN CardFile: DNKHUF PAN.pdf | 16 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: DK 01 Layout - Kunjaban.pdf | 16 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: DK Commencement Certificate.pdf | 16 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 39 filed documents as one ZIP, foldered, with a manifest
Keep DISHA KUNJBAN PHASE 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Wadgaon Kolhati (CT)1,400+ in Aurangabad
Filed coordinates, straight-line distance. 36 registered projects within 2 km.
SARA SWARAJYA PHASE-I
SARA INFRASTRUCTURES
Khinvasara Town Part-1
Champalal Kanhaiyalal Khinvasara
Waluj Trade Tower
Govind Enterprises
Renuka Nagari
Shlok Realty
GOLOK CARNATION
GOLOK DEVELOPERS
THE URBAN OASIS
AMRUT NISHA SAI LANDMARKS
See every Aurangabad project, with the district possession charts
Builder: DEVANAND NARAYANRAO KOTGIRE (HUF)
DEVANAND NARAYANRAO KOTGIRE (HUF) has 4 registrations on MahaRERA, including DISHA KUNJBAN PHASE 1 and DISHA KUNJABAN PHASE 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What are my rights if DISHA KUNJBAN PHASE 1 is delayed beyond 31 Dec 2019?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DISHA KUNJBAN PHASE 1?
The registered promoter entity is DEVANAND NARAYANRAO KOTGIRE (HUF), an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DISHA KUNJBAN PHASE 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DISHA KUNJBAN PHASE 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DISHA KUNJBAN PHASE 1?
The professionals named in the filing: Architect: AKW ASSOCIATES; Engineer: CORE CONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DISHA KUNJBAN PHASE 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback