Completed No litigation declared Residential / Group Housing project

Dipti Royal Arc

By Dipti Associates

RG-MH-79000 · RERA P51900034863 · Last updated on MahaRERA portal: 24 Jan 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

Dipti Royal Arc is a Residential / Group Housing project by Dipti Associates in Mumbai City, Maharashtra, registered with MahaRERA as P51900034863 on 28 Apr 2022. The registration is recorded completed; possession was promised by 31 Dec 2024.

At a glance

Project

  • NameDipti Royal Arc
  • TypeResidential / Group Housing
  • Location
    • Dr Madhukar B Raut Road
    • Shivaji Park
    • Mumbai City
    • 400028
  • Pincode400028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900034863
  • ReraGenie IDRG-MH-79000

Builder

  • NameDipti Associates
  • Entity typePartnership
  • PartnerSagar Shah
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects2 →

Key dates

this monthRegisteredApr 2022PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Apr 2022
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed65 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Dipti Royal ArcNA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

Dipti Royal Arc: 84% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities15

As on 24 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Closed/Covered40

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area647 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3410.88
Proposed, not sanctioned3,405 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMittal Court B Wing Ground floor, Nariman Point, Mumbai - 400021

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectStudio Changani
EngineerManzur Husain Hebballi
Chartered AccountantDixit Dattatray and Associates
Chartered AccountantMohandas and Co
PartnerRole in project
Dipti Associates-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 26 Nov 2024

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Royal Arc Jan 2025.pdf24 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2438293_OC_signed.pdf26 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Royal Arc Sep 2024 signed_0001.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Royal Arc Sep 2024 signed.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Royal Arc 30062024 signed_0001.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Royal Arc 30062024 Signed_0001.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Royal Arc 30062024 Signed_0001.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dipti Royal Arc March 2024 Signed_0001.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Royal Arc March 2024 Signed_0001.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Royal Arc March 2024 signed_0001.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Quarter 4 31122023_0001.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Quarter 4 31122023_0001.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Quarter 4 31122023_0001.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 30th Sept 2023_compressed.pdf21 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 30 Sept 2023.pdf21 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30092023.pdf21 Oct 2023
Building plan approvalFile: Raj Kamal - Amended May 2023-7.pdf17 Oct 2023
Building plan approvalFile: Raj Kamal - Amended May 2023-1-2_compressed.pdf17 Oct 2023
Building plan approvalFile: Raj Kamal - Amended May 2023-3-4.pdf17 Oct 2023
Building plan approvalFile: Raj Kamal - Amended May 2023-5-6.pdf17 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Raj Kamal - Amended May 2023-1-2_compressed.pdf17 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Raj Kamal - Amended May 2023-3-4.pdf17 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Raj Kamal - Amended May 2023-5-6.pdf17 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Raj Kamal - Amended May 2023-7.pdf17 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - 2022-23.pdf17 Oct 2023
Details of encumbrances concerned to FinanceFile: Title Certificate LD Shah 15th april 2022.pdf8 Sep 2023
Details of encumbrances concerned to LegalFile: Title Certificate LD Shah 15th april 2022.pdf8 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dec2022.pdf5 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mar2023.pdf5 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: June2023.pdf5 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: June2022.pdf4 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sept2022.pdf4 Sep 2023
Building plan approvalFile: Drawing - Amended May 2023-1-2.pdf2 Sep 2023
Building plan approvalFile: Drawing - Amended May 2023-3-4.pdf2 Sep 2023
Building plan approvalFile: Drawing - Amended May 2023-5-6.pdf2 Sep 2023
Building plan approvalFile: Drawing - Amended May 2023-7-8.pdf2 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Drawing - Amended May 2023-1-2.pdf2 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Drawing - Amended May 2023-3-4.pdf2 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Drawing - Amended May 2023-5-6.pdf2 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Drawing - Amended May 2023-7-8.pdf2 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: 23-08-31 Further CC_signed.pdf2 Sep 2023
PAN CardFile: DIPTI ASSOCIATES PAN CARD.pdf18 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA form 1 DIPTI RAJKAMAL 30-06-2023.pdf18 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA form 1-DIPTI RAJKAMAL-31st Dec 2022.pdf11 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA form 1-DIPTI RAJKAMAL-31st March 2023.pdf11 Aug 2023
Proforma of Agreement for saleFile: RERA Agreement for Sale - 20th April 2022.pdf11 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA form 1 DIPTI RAJKAMAL 11th Aug 2022.pdf7 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Annexure B.pdf7 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf7 Sep 2022
Building plan approvalFile: Plans - Compressed.pdf25 Apr 2022
Copy of the legal title reportFile: Title Certificate LD Shah 15th april 2022.pdf25 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: Plans - Compressed.pdf25 Apr 2022
Declaration in FORM BFile: Declaration form B 21st april 2022.pdf21 Apr 2022
Proforma of Allotment letterFile: Allotment Letter.pdf20 Apr 2022
Layout approvalFile: No Layout.pdf5 Apr 2022
Building plan approvalFile: Amend letter_signed July 20.pdf5 Apr 2022
Details of encumbrancesFile: No encumbrances.pdf5 Apr 2022
Copy of Layout Approval (in case of layout)File: No Layout.pdf5 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: Amend letter_signed July 20.pdf5 Apr 2022
Declaration about Commencement CertificateFile: CC Declaration.pdf5 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate.pdf5 Apr 2022
CERSAI detailsFile: CERSAI_Search_Report_200235197485_For_Asset_Based_Search_15_04_2022_17_36_54_621.pdf5 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf5 Apr 2022
Proforma of Allotment letterFile: RERA Agreement for Sale - 20th April 2022.pdf5 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: CC upto 8 floors - Kenin Jain - Nov 2020.pdf1 Apr 2022

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is completed

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Dipti Royal Arc on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shivaji Park780+ in Mumbai City

2 kmDipti Royal ArcCompleted 79Lapsed / revoked 66Other 97Dot size: filed unitsN

Filed coordinates, straight-line distance. 242 registered projects within 2 km.

Builder: Dipti Associates

DIPTI ASSOCIATES has 3 registrations on MahaRERA, including DIPTI OCEAN TERRACES and Dipti Royal Arc. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Dipti Royal Arc is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dipti Royal Arc?

The registered promoter entity is Dipti Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dipti Royal Arc?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Dipti Royal Arc?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dipti Royal Arc?

The professionals named in the filing: Architect: Studio Changani; Engineer: Manzur Husain Hebballi; Chartered Accountant: Dixit Dattatray and Associates; Chartered Accountant: Mohandas and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dipti Royal Arc?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dipti Royal Arc. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dipti Royal Arc to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.