Home / Browse projects / Sindhudurg, Maharashtra / Dipali Residency
Dipali Residency
RG-MH-06376 · RERA P52900053530 · Last updated on MahaRERA portal: 28 Mar 2026
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Dipali Residency is a Residential / Group Housing project by Dattatray Construction in Sindhudurg, Maharashtra, registered with MahaRERA as P52900053530 on 10 Nov 2023. The registration is recorded completed; possession was promised by 24 Dec 2026. 13 of the 18 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameDipali Residency
- TypeResidential / Group Housing
- Location
- Salaiwada
- Sawantwadi (M Cl)
- Sawantwadi
- Sindhudurg
- 416510
- Pincode416510
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52900053530
- ReraGenie IDRG-MH-06376
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on10 Nov 2023
- Promised completion24 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed93 files
Current status
Figures as on 28 Mar 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Dipali Residency | NA | 6 | 6 | 18 | 0 | 18 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
Dipali Residency: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 28 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed29
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Maxie F Dsouza Also Known As Dipali B Wadkar | Sawantwadi (M Cl) | Sindhudurg |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Dipali Residency | NA | Rs 2.65 cr | Rs 2.65 cr |
| - | NA | Rs 10.00 lakh | Rs 10.00 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sahas arvind patil |
| Engineer | Mr Uday Sadashiv Parale |
| Engineer | swapnil Subhash patil |
| Chartered Accountant | Mr Sudhir Ganesh Naik |
| Chartered Accountant | S V MODAK AND CO |
| Partner | Role in project |
|---|---|
| Dattatray Construction | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Sep 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Jul 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed93
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: 1 Ar Certificate No 1 Qtr 3 2025-26.pdf | 28 Mar 2026 |
| Withdrawal Update Form 2File: 2 Eng Certificate No 2 Qtr 3 2025-26.pdf | 28 Mar 2026 |
| Withdrawal Update Form 3File: 3 CA Certificate No 3 Qtr 3 2025-26.pdf | 28 Mar 2026 |
| Occupational CertificateFile: OCCUPANCY CERTIFICATE.pdf | 28 Mar 2026 |
| Withdrawal Update Form 1File: Ar Certificate No 1 F Y 2025-26 Qtr 1.pdf | 9 Feb 2026 |
| Withdrawal Update Form 1File: Ar Certificate No 1 F Y 2025-26 Qtr 2.pdf | 9 Feb 2026 |
| Withdrawal Update Form 2File: Eng Certificate No 2 F Y 2025-26 Qtr 1.pdf | 9 Feb 2026 |
| Withdrawal Update Form 2File: Eng Cerificate No 2 F Y 2025-26 Qtr 2.pdf | 9 Feb 2026 |
| Withdrawal Update Form 3File: CA Certificate No 3 F Y 2025-26 Qtr 1.pdf | 9 Feb 2026 |
| Withdrawal Update Form 3File: CA Certificate No 3 F Y 2025-26 Qtr 2.pdf | 9 Feb 2026 |
| Form 5 (FY 2024-2025)File: CA Certificate No 5 (1).pdf | 9 Feb 2026 |
| Form 1File: ar certi.pdf | 22 Jan 2026 |
| Form 2File: ER CERT QTR4 24-25.pdf | 22 Jan 2026 |
| Form 3File: ca certififcate.pdf | 22 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: sold unsold qtr 4 2024-25.pdf | 22 Jan 2026 |
| Form 2A (FY 2023-2024)File: QUALITY ASSURANCE CERT 2023-24.pdf | 1 Jan 2026 |
| Form 2A (FY 2024-2025)File: QUALITY ASSURANCE CERT 2024-25.pdf | 1 Jan 2026 |
| Form 1File: 1 ar certificate 23-24 qtr 3.pdf | 2 Aug 2025 |
| Form 2File: ENGINEER CERTIFICATE 2023-24 QTR 3.pdf | 2 Aug 2025 |
| Form 3File: CA CERTIFICATE 2023-24 QTR 3.pdf | 2 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY 23-24 QTR 3.pdf | 2 Aug 2025 |
| Form 1File: 2 ar certificate 23-24 qtr 4.pdf | 2 Aug 2025 |
| Form 2File: ENGINEER CERTIFICATE 2023-24 QTR 4.pdf | 2 Aug 2025 |
| Form 3File: CA CERTIFICATE 2023-24 QTR 4.pdf | 2 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY 23-24 QTR 4.pdf | 2 Aug 2025 |
| Form 1File: 3 ar certificate 24-25 qtr 1.pdf | 2 Aug 2025 |
| Form 2File: ENGINEER CERTIFICATE 2024-25 QTR 1.pdf | 2 Aug 2025 |
| Form 3File: CA CERTIFICATE 2024-25 QTR 1.pdf | 2 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY 24-25 QTR 1.pdf | 2 Aug 2025 |
| Form 1File: 4 ar certificate 24-25 qtr 2.pdf | 2 Aug 2025 |
| Form 2File: ENGINEER CERTIFICATE 2024-25 QTR 2.pdf | 2 Aug 2025 |
| Form 3File: CA CERTIFICATE 2024-25 QTR 2.pdf | 2 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY 24-25 QTR 2.pdf | 2 Aug 2025 |
| Form 1File: 5 ar certificate 24-25 qtr 3.pdf | 2 Aug 2025 |
| Form 2File: ENGINEER CERTIFICATE 2024-25 QTR 3.pdf | 2 Aug 2025 |
| Form 3File: CA CERTIFICATE 2024-25 QTR 3.pdf | 2 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY 24-25 QTR 3.pdf | 2 Aug 2025 |
| Form 5 (FY 2023-2024)File: CA Certificate No 5 F Y 2023-24.pdf | 2 Aug 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD QTR 4 2024-25.pdf | 28 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QAULITY ASSURANCE CERT 2024-25.pdf | 28 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 ar certificate.pdf | 21 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 ar certificate.pdf | 21 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 ar certificate.pdf | 21 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 ar certificate.pdf | 21 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 ar certificate.pdf | 21 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ar certificate 31052023.pdf | 21 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 2023-24 QTR 3_compressed.pdf | 21 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 2023-24 QTR 4_compressed.pdf | 21 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 2024-25 QTR 1_compressed.pdf | 21 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 2024-25 QTR 2_compressed.pdf | 21 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 2024-25 QTR 3_compressed.pdf | 21 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 2023-24 QTR 4_compressed.pdf | 21 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 2024-25 QTR 3_compressed (1).pdf | 21 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 2024-25 QTR 2_compressed.pdf | 21 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 2024-25 QTR 1_compressed.pdf | 21 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 2023-24 QTR 3.pdf | 21 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf | 21 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY 23-24 QTR 3.pdf | 21 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY 23-24 QTR 4.pdf | 21 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY 24-25 QTR 1.pdf | 21 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY 24-25 QTR 2.pdf | 21 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY 24-25 QTR 3.pdf | 21 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: engineer quality assurance certi 2A Form -.pdf | 21 Feb 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: BANK LETTER REGARDING RERA AC.pdf | 21 Feb 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: SECURED UNSECURED FINANCE.pdf | 21 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Certificate No 5 F Y 2023-24.pdf | 13 Jan 2025 |
| Proforma of Agreement for saleFile: Agreement for RERA registration.pdf | 25 Oct 2023 |
| Copy of the legal title reportFile: LEGAL TITLE WITH LAND OWNER_compressed (1).pdf | 22 Sep 2023 |
| Declaration in FORM BFile: FORM B FOR LAND OWNER_compressed (1).pdf | 22 Sep 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: separate bank ac details.pdf | 22 Sep 2023 |
| Declaration in FORM BFile: form b.pdf | 13 Sep 2023 |
| PAN CardFile: SELF DECLARATION.pdf | 29 Aug 2023 |
| Other - LegalFile: SELF DECLARATION.pdf | 26 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: financial encumbrance new.pdf | 24 Aug 2023 |
| Details of encumbrances concerned to LegalFile: financial encumbrance new.pdf | 24 Aug 2023 |
| Building plan approvalFile: approval plan.pdf | 27 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: approval plan.pdf | 27 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf | 27 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate_NEW.pdf | 25 Jul 2023 |
| Building plan approvalFile: NA Order.pdf | 22 Jul 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Dattaguru NiwasP52900034870 | majgaon, Sindhudurg | 80 | Apr 2022 | Ongoing | Mar 2029 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sindhudurg
Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 93 filed documents as one ZIP, foldered, with a manifest
Keep Dipali Residency on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Salaiwada530+ in Sindhudurg
Filed coordinates, straight-line distance. 54 registered projects within 2 km.
perto de goa phase R 1
ANKIT VASTU CREATIONS PRIVATE LIMITED
ASHTVINAYAK GRUHSANKUL
MR PANKAJ ROHIDAS NARVEKAR
SAWANTWADI ENCLAVE
LANDKRAFT SPACES PRIVATE LIMITED
APNA GHAR
VYANKATESH VASANT DESHPANDE
Riviera Suites
Home and Soul Developers Private Limited
HERITAGE HOMES
HERITAGE REALTORS
See every Sindhudurg project, with the district possession charts
Builder: Dattatray Construction
Dattatray Construction has 2 registrations on MahaRERA, including Dipali Residency and Dattaprasad Niwas. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Sindhudurg district page.
Frequently asked questions
What are my rights if Dipali Residency is delayed beyond 24 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Dipali Residency?
The registered promoter entity is Dattatray Construction, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Dipali Residency?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Dipali Residency?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Dipali Residency?
The professionals named in the filing: Architect: Sahas arvind patil; Engineer: Mr Uday Sadashiv Parale; Engineer: swapnil Subhash patil; Chartered Accountant: Mr Sudhir Ganesh Naik; Chartered Accountant: S V MODAK AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Dipali Residency?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback