ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Dhoot Pride Residency-Devidayal Apartment

Registered Litigation declared Residential / Group Housing project

Dhoot Pride Residency-Devidayal Apartment

By DHOOT DEVELOPERS PVT. LTD.

RG-MH-72470 · RERA P51800008534 · Last updated on MahaRERA portal: 26 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 1 complaint at MahaRERA
  • Completion date moved by 36 months
  • 1 extension taken
  • Rs 20.00 crore secured on the land, in favour of Hero Housing Finance Ltd

Clear

  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
5 of 11Construction stages donefurthest along: Podiums (if any), 90%
37 of 64Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 142 documents Report an error

Dhoot Pride Residency-Devidayal Apartment is a Residential / Group Housing project by DHOOT DEVELOPERS PVT. LTD. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008534 on 19 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 27 of the 64 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameDhoot Pride Residency-Devidayal Apartment
  • TypeResidential / Group Housing
  • Location
    • R.P.ROAD
    • MULUND WEST
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800008534
  • ReraGenie IDRG-MH-72470

Builder

  • NameDHOOT DEVELOPERS PVT. LTD.
  • Entity typeCompany
  • DirectorsShyam Sundar Kasat, Piyush PawanKumar Dhoot
  • Other registrations4 more →
  • Completed3 of 5
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed142 files

Current status

42%27 of 64 units booked
65.2%Work done, per cost certificate

Figures as on 26 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Devidayal Apartment CHSLNA212164064

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 90%.

Devidayal Apartment CHSL: 79% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)90%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.35%

Progress on shared amenities15

As on 26 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes85%
Storm Water DrainsYes85%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes70%
Water conservation /Rain water harvestingYes85%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,672 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofHero Housing Finance Ltd
Secured amountRs 20.00 crore
CERSAI search filedYes
Declared on14 Jun 2025

Approvals and building plan

Permissible FSI4966.43
Proposed, not sanctioned1,213 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 1 AND 2 BHAVESHWAR BUILDING NO 3 BHAVESHWAR LANE GROUND FLOOR GHATKOPAR EAST MUMBAI 400077
Estimated costRs 30.02 cr
Cost incurredRs 19.56 cr
Work done65.15%
BuildingWingEstimatedIncurred
Devidayal Apartment CHSLNARs 30.02 crRs 19.56 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR P Asundaria
EngineerSandeep Sakal
EngineerKalyanji M. Parmar
Chartered AccountantShashank R Jain & Associates
Chartered AccountantDipesh Thakkar
PartnerRole in project
DHOOT DEVELOPERS PVT. LTD.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800012077Dec 2023 → Dec 2026

Reason as filed by the promoterAs per DCPR 2034 project is eligible for 17 floors instead of 14 floors

Litigation declared1

CaseCourtStatus
CARBP/700/2018/2018BOMBAY HIGH COURTFinal order passed

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000197294Devidayal Apartments Co-Operative Housing Society LimitedDhoot Developers Private Limited17/06/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed142

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 142 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A Devidayal FY 25-26.pdf26 Jun 2026
Withdrawal Update Form 1File: Form 1 of Devidayal 31032026.pdf28 Apr 2026
Withdrawal Update Form 2File: Form 2 of Devidayal 31032026.pdf28 Apr 2026
Withdrawal Update Form 3File: Form 3 of Devidayal 31032026.pdf28 Apr 2026
Withdrawal Update Form 1File: Form 1 Devidayal 31122025.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 Devidayal 31122025.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 Devidayal 31122025.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1 Devidayal 30092025.pdf6 Nov 2025
Withdrawal Update Form 2File: Form 2 Devidayal 30092025.pdf6 Nov 2025
Withdrawal Update Form 3File: Form 3 Devidayal 30092025.pdf6 Nov 2025
Form 5 (FY 2024-2025)File: DD - Annexure F Form 5.pdf30 Sep 2025
Withdrawal Update Form 1File: Form 1 Pride.pdf6 Aug 2025
Withdrawal Update Form 2File: Form 2 Pride.pdf6 Aug 2025
Withdrawal Update Form 3File: FORM 3 Devidayal 30062025.pdf6 Aug 2025
Form 2A (FY 2024-2025)File: Form 2A Pride.pdf17 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DHOOT Pride.pdf14 Apr 2025
Certificates of CA (Form 3)File: Form 3 Final.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DD - Form 2 Engineer's Certificate 31-03-2025 Final.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DD form 1 dec 24.pdf9 Jan 2025
Certificates of CA (Form 3)File: Form-3 31122024 with sign.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 devidayal rera dec 24.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pride - 300924.pdf16 Oct 2024
Certificates of CA (Form 3)File: Form-3 30092024-compressed.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pride - 300924.pdf16 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 23 - 24 - Pride.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pride.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pride.pdf15 Jul 2024
Certificates of CA (Form 3)File: Form 3 Pride 30062024.pdf15 Jul 2024
Certificates of CA (Form 3)File: Form 3 Pride 30062024.pdf15 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: DD - Form 2A 23-24.pdf31 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Ar Certificate - 31032024 - DD.PDF13 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DD - Form 2.pdf13 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A march 23.pdf13 Apr 2024
Certificates of CA (Form 3)File: Form 3 Devidayal 31032024_compressed.pdf13 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pride.pdf15 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pride.pdf15 Jan 2024
Certificates of CA (Form 3)File: Form 3 - Pride.pdf15 Jan 2024
Proforma of Agreement for saleFile: AGREEMENT FOR SALE- DEVIDAYAL APARTMENTS ( RERA)-07112023.pdf7 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DD 30092023.pdf12 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DD 30092023.pdf12 Oct 2023
Certificates of CA (Form 3)File: Form-3 DD 3009_compressed.pdf12 Oct 2023
Details of encumbrancesFile: Encrumbrance Devidayal.pdf14 Sep 2023
CERSAI detailsFile: CERSAI REPORT of DEVIDAYAL APARTMENT.pdf12 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Dhoot Form 5.pdf5 Sep 2023
Declaration about Commencement CertificateFile: Declaration - CC.pdf16 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: Full CC.pdf14 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 30062023.pdf14 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer's Certificate 30-06-2023.pdf14 Jul 2023
Certificates of CA (Form 3)File: Form 3 CA Certificate 30-06-2023 Sign Copy.pdf14 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 march 23 compressed.pdf11 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 march 23.pdf11 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A march 23.pdf11 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold unsold inventory.pdf11 Apr 2023
Certificates of CA (Form 3)File: Form 3 march23 compressed.pdf11 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -Dec 22.pdf16 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Dec 22.pdf16 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Unit 31-12-22.pdf16 Jan 2023
Certificates of CA (Form 3)File: Form 3 -Dec 22_compressed.pdf16 Jan 2023
Details of encumbrances concerned to LegalFile: Legal Encumberance Declaration.pdf8 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sep22.pdf8 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep22.pdf8 Oct 2022
Disclosure of sold/ booked inventoryFile: Sold Unold 30092022.pdf8 Oct 2022
Certificates of CA (Form 3)File: Form-3 Sep-22 Signed copy_compressed.pdf8 Oct 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaraion for separate bank account.pdf8 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: DEVIDAYAL - FORM 5.pdf30 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Devidayal_30062022.pdf4 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Devidayal_30062022.pdf4 Aug 2022
Disclosure of sold/ booked inventoryFile: Devidayal Sold Unsold.pdf4 Aug 2022
Certificates of CA (Form 3)File: Form 3_Devidayal_30062022_compressed.pdf4 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Devidayal_31-03-2022.pdf30 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Devidayal_31-03-2022.pdf30 Jun 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold devidayal.pdf30 Jun 2022
Certificates of CA (Form 3)File: Form 3_Devidayal_31-03-2022_compressed.pdf30 Jun 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Devidayal Society Registration Certificate.pdf24 May 2022
Layout approvalFile: Layout - 1.pdf18 Apr 2022
Layout approvalFile: Drawing for Full CC dtd 06012022 1-3.pdf18 Apr 2022
Copy of Layout Approval (in case of layout)File: Layout - 1.pdf18 Apr 2022
Copy of Layout Approval (in case of layout)File: Drawing for Full CC dtd 06012022 1-3.pdf18 Apr 2022
Declaration about Commencement CertificateFile: CC Declaration_Upto Plinth_12042022.pdf13 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: DD FirstCC_signed.pdf12 Apr 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Dhoot Emerald ResidencyPlot no 57 Jaygun Sagar CHSL 90ft Road Ghatkopar East Mumbai-40007725CompletedMar 2018Jan 2018

How this compares with Mumbai Suburban

42%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 36 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Dhoot Pride Residency-Devidayal Apartment on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MULUND WEST6,700+ in Mumbai Suburban

2 kmDhoot Pride Residency-DeCompleted 91Lapsed / revoked 67Other 127Dot size: filed unitsN

Filed coordinates, straight-line distance. 285 registered projects within 2 km.

Builder: DHOOT DEVELOPERS PVT. LTD.

DHOOT DEVELOPERS PVT. LTD. has 5 registrations on MahaRERA, including Dhoot Emrald Residency-Jaygun Sagar CHSL and Dhoot Adi Residency-Shree Adi House CHSL. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Dhoot Pride Residency-Devidayal Apartment is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dhoot Pride Residency-Devidayal Apartment?

The registered promoter entity is DHOOT DEVELOPERS PVT. LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dhoot Pride Residency-Devidayal Apartment?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Dhoot Pride Residency-Devidayal Apartment?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Dhoot Pride Residency-Devidayal Apartment?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dhoot Pride Residency-Devidayal Apartment?

The professionals named in the filing: Architect: R P Asundaria; Engineer: Sandeep Sakal; Engineer: Kalyanji M. Parmar; Chartered Accountant: Shashank R Jain & Associates; Chartered Accountant: Dipesh Thakkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dhoot Pride Residency-Devidayal Apartment?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dhoot Pride Residency-Devidayal Apartment. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dhoot Pride Residency-Devidayal Apartment to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.