Registered No litigation declared Residential / Group Housing project

Dhananjay Starlight

By DHANRAJ STARLIGHT

RG-MH-92640 · RERA P99000081038 · Last updated on MahaRERA portal: 20 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 40%
203 of 279Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

Dhananjay Starlight is a Residential / Group Housing project by DHANRAJ STARLIGHT in Palghar, Maharashtra, registered with MahaRERA as P99000081038 on 14 Nov 2025. Possession is promised by 20 Dec 2029. 76 of the 279 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameDhananjay Starlight
  • TypeResidential / Group Housing
  • Location
    • Achole Road
    • Village Achole
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401209
  • Pincode401209
  • RERA no.P99000081038
  • ReraGenie IDRG-MH-92640

Builder

  • NameDHANRAJ STARLIGHT
  • Entity typePartnership

Key dates

this monthRegisteredNov 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Nov 2025
  • Promised completion20 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed104 files

Current status

27%76 of 279 units booked
33.0%Work done, per cost certificate

Figures as on 20 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Dhananjay StarlightNA200121158279

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 40%.

Dhananjay Starlight: 52% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed49

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots49
Open Space49

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,639 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jun 2026
LandownerVillageDistrict
The Blue Star Co-op Housing Society LimitedVasai-Virar City (M Corp)Palghar
Jayesh Mansukhlal DesaiVasai-Virar City (M Corp)Palghar
Bharat Mansukhlal DesaiVasai-Virar City (M Corp)Palghar
Rashmi Mukesh KotichaVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVasai Virar City municipal Corporation
Permissible FSI9421.9
Proposed, not sanctioned9,422 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No-7,8,9, Sai Tower CHSL, D-Wing, Ambadi Road, Vasai West-401202
Estimated costRs 30.43 cr
Cost incurredRs 10.03 cr
Work done32.97%
BuildingWingEstimatedIncurred
Dhananjay StarlightNARs 23.33 crRs 10.03 cr
-NARs 7.10 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHREE CONSULTANTS
EngineerCON ARCH INDIA
EngineerShilplekha Associates
Chartered AccountantDARSHAN B RAUT & ASSOCIATES
Chartered AccountantMishra Mayekar and Co.
PartnerRole in project
DHANRAJ STARLIGHT-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Oct 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 20 Dec 2029

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 MAR 26.pdf20 Jun 2026
Withdrawal Update Form 2File: FORM 2 MAR 26.pdf20 Jun 2026
Withdrawal Update Form 3File: FORM 3 MAR 26.pdf20 Jun 2026
Withdrawal Update Form 1File: Form 1 .pdf19 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf19 Jun 2026
Withdrawal Update Form 3File: FORM 3 DEC 25.pdf19 Jun 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL LETTER REPLY PROJECT COST VS REVENUE.pdf11 Nov 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL LETTER REPLY PROJECT COST VS REVENUE.pdf11 Nov 2025
Other - FinanceFile: LANDOWNER DECLRATION FOR NO RERA BANK AC.pdf6 Nov 2025
Other - FinanceFile: LANDOWNER DECLRATION FOR NO RERA BANK AC.pdf6 Nov 2025
Copy of the legal title reportFile: RERA_Title_Achole_145C.pdf28 Oct 2025
Copy of the legal title reportFile: RERA_Title_Achole_145C.pdf28 Oct 2025
Other - LegalFile: DECLARATION WITH 7 12.pdf18 Oct 2025
Other - LegalFile: CONFIRMATION DEED 1-20.pdf18 Oct 2025
Other - LegalFile: CONFIRMATION DEED 21-41.pdf18 Oct 2025
Other - LegalFile: DECLARATION WITH 7 12.pdf18 Oct 2025
Other - LegalFile: CONFIRMATION DEED 1-20.pdf18 Oct 2025
Other - LegalFile: CONFIRMATION DEED 21-41.pdf18 Oct 2025
Copy of the legal title reportFile: legal title report-145B.pdf22 Sep 2025
Copy of the legal title reportFile: legal title report-145B.pdf22 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3FORM - 3 - DHANRAJ STARLIGHT.pdf21 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3FORM - 3 - DHANRAJ STARLIGHT.pdf21 Aug 2025
Declaration about Commencement CertificateFile: 4CC Declaration.pdf1 Aug 2025
Declaration about Commencement CertificateFile: 4CC Declaration.pdf1 Aug 2025
Building plan approvalFile: 6TH FLOOR ARCHITECT DECLARATION.pdf26 Jul 2025
Building plan approvalFile: 6TH FLOOR ARCHITECT DECLARATION.pdf26 Jul 2025
Details of encumbrances concerned to FinanceFile: 3financial encrumbances declaration.pdf26 Jul 2025
Commencement Certificates / NA Order for plotted developmentFile: 1dhanraj starlight cc.pdf26 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: 6TH FLOOR ARCHITECT DECLARATION.pdf26 Jul 2025
CERSAI detailsFile: 4Cersai declaration.pdf26 Jul 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: 1rera bank account declaration.pdf26 Jul 2025
Details of encumbrances concerned to LegalFile: 3financial encrumbances declaration.pdf26 Jul 2025
Other - FinanceFile: JAYESH DESAI - SUPLLEMENTARY DEED.pdf26 Jul 2025
Other - FinanceFile: JAYESH DESAI - DEC.pdf26 Jul 2025
Disclosure for secured/unsecured finance availed for the projectFile: 2DISCLOSURE FOR SECURED UNSECURED FINANCE.pdf26 Jul 2025
Details of encumbrances concerned to FinanceFile: 3financial encrumbances declaration.pdf26 Jul 2025
Commencement Certificates / NA Order for plotted developmentFile: 1dhanraj starlight cc.pdf26 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: 6TH FLOOR ARCHITECT DECLARATION.pdf26 Jul 2025
CERSAI detailsFile: 4Cersai declaration.pdf26 Jul 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: 1rera bank account declaration.pdf26 Jul 2025
Details of encumbrances concerned to LegalFile: 3financial encrumbances declaration.pdf26 Jul 2025
Other - FinanceFile: JAYESH DESAI - SUPLLEMENTARY DEED.pdf26 Jul 2025
Other - FinanceFile: JAYESH DESAI - DEC.pdf26 Jul 2025
Disclosure for secured/unsecured finance availed for the projectFile: 2DISCLOSURE FOR SECURED UNSECURED FINANCE.pdf26 Jul 2025
Building plan approvalFile: dhanraj drawing floor plan 1 2 3_compressed.pdf18 Jul 2025
Building plan approvalFile: dhanraj drawing floor plan 1 2 3_compressed.pdf18 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: dhanraj drawing floor plan 1 2 3_compressed.pdf18 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: dhanraj drawing floor plan 1 2 3_compressed.pdf18 Jul 2025
Other - TechnicalFile: 8DECLARATION-CUM- UNDERTAKING SPECIMEN.pdf16 Jul 2025
Other - TechnicalFile: 8DECLARATION-CUM- UNDERTAKING SPECIMEN.pdf16 Jul 2025
Other - TechnicalFile: RERA MAIL Declaration new.pdf10 Jul 2025
Other - TechnicalFile: RERA MAIL Declaration new.pdf10 Jul 2025
Proforma of Allotment letterFile: Allotment_Letter 240325.pdf24 Mar 2025
Proforma of Agreement for saleFile: AFS FINAL 240325.pdf24 Mar 2025
Proforma of Allotment letterFile: Allotment_Letter 240325.pdf24 Mar 2025
Proforma of Agreement for saleFile: AFS FINAL 240325.pdf24 Mar 2025
Deviation Report with respect to Allotment letterFile: DHANRAJ STARLIGHT ALLOTMENT LETTER NO DEVIATION.pdf17 Mar 2025
Deviation Report with respect to model copy of AgreementFile: DHANRAJ STARLIGHT AFS NO DEVIATION.pdf17 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DHANRAJ STARLIGHT ANNEXURE A RAJU BHAGWANT KOTLA.pdf17 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DHANRAJ STARLIGHT ANNEXURE A DHANANJAY RAJARAM RAUT.pdf17 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DHANRAJ STARLIGHT ANNEXURE A PRASHANT NARENDRA SHAH.pdf17 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DHANRAJ STARLIGHT ANNEXURE A RAMKAILASH K YADAV.pdf17 Mar 2025
Deviation Report with respect to Allotment letterFile: DHANRAJ STARLIGHT ALLOTMENT LETTER NO DEVIATION.pdf17 Mar 2025
Deviation Report with respect to model copy of AgreementFile: DHANRAJ STARLIGHT AFS NO DEVIATION.pdf17 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DHANRAJ STARLIGHT ANNEXURE A RAJU BHAGWANT KOTLA.pdf17 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DHANRAJ STARLIGHT ANNEXURE A DHANANJAY RAJARAM RAUT.pdf17 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DHANRAJ STARLIGHT ANNEXURE A PRASHANT NARENDRA SHAH.pdf17 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DHANRAJ STARLIGHT ANNEXURE A RAMKAILASH K YADAV.pdf17 Mar 2025
Layout approvalFile: dhanraj drawing layout (1).pdf11 Mar 2025
Building plan approvalFile: dhanraj drawing floor plan 1 (1).pdf11 Mar 2025
Building plan approvalFile: dhanraj drawing floor plan 2 (1).pdf11 Mar 2025
Building plan approvalFile: dhanraj drawing floor plan 3 (1).pdf11 Mar 2025
Building plan approvalFile: dhanraj drawing floor plan 4 (1).pdf11 Mar 2025
Layout approvalFile: dhanraj drawing layout (1).pdf11 Mar 2025
Building plan approvalFile: dhanraj drawing floor plan 1 (1).pdf11 Mar 2025
Building plan approvalFile: dhanraj drawing floor plan 2 (1).pdf11 Mar 2025
Building plan approvalFile: dhanraj drawing floor plan 3 (1).pdf11 Mar 2025
Building plan approvalFile: dhanraj drawing floor plan 4 (1).pdf11 Mar 2025
PAN CardFile: DHANRAJ STAT LIGHT pan card.pdf11 Mar 2025
Details of encumbrances concerned to FinanceFile: legal litigation on land declaration.pdf11 Mar 2025

How this compares with Palghar

27%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Dhananjay Starlight on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village Achole3,200+ in Palghar

Builder: DHANRAJ STARLIGHT

DHANRAJ STARLIGHT has 1 registration on MahaRERA, including Dhananjay Starlight. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Dhananjay Starlight is delayed beyond 20 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dhananjay Starlight?

The registered promoter entity is DHANRAJ STARLIGHT, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dhananjay Starlight?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Dhananjay Starlight?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dhananjay Starlight?

The professionals named in the filing: Architect: SHREE CONSULTANTS; Engineer: CON ARCH INDIA; Engineer: Shilplekha Associates; Chartered Accountant: DARSHAN B RAUT & ASSOCIATES; Chartered Accountant: Mishra Mayekar and Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dhananjay Starlight?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dhananjay Starlight. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dhananjay Starlight to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.