ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / DHANALAXMI HERITAGE

Registration lapsed No litigation declared Others project

DHANALAXMI HERITAGE

By M/S. K P DEVELOPERS & BUILDERS

RG-MH-46401 · RERA P52100015453 · Last updated on MahaRERA portal: 17 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 33 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 164 documents Report an error

DHANALAXMI HERITAGE is a Others project by M/S. K P DEVELOPERS & BUILDERS in Pune, Maharashtra, registered with MahaRERA as P52100015453 on 27 Feb 2018. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 33 months from the original filing.

At a glance

Project

  • NameDHANALAXMI HERITAGE
  • TypeOthers
  • Location
    • 0
    • Chikhali
    • Haveli
    • Pune
    • 411062
  • Pincode411062
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100015453
  • ReraGenie IDRG-MH-46401

Builder

  • NameM/S. K P DEVELOPERS & BUILDERS
  • Entity typePartnership
  • PartnersBharat Ratanshi Patel, Pachan Karamshi Patel, Mangesh Uttam Kute, Ganesh Uttam Kute, Piyush Vasant Patel, Rupesh Bhagwan Kute, Uttam Maruti Kute, Virji Karamshi Patel
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredFeb 2018First promiseMar 2023Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on27 Feb 2018
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 30 Mar 2023)
  • Buildings1 building record
  • Documents filed164 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DHANALAXMI HERITAGENA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

DHANALAXMI HERITAGE: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed22

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots22
Closed/Covered22

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,594 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
DAMODAR RAMBHAU MOREPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Permissible FSI8518.6
Proposed, not sanctioned8,518 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAKURDI

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR UMESH NAMDE
EngineerMR RAVINDRA KARNAWAT
PartnerRole in project
M/S. K P DEVELOPERS & BUILDERS-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100015135Mar 2023 → Mar 2024

Reason as filed by the promoterDUE TO COVID 19 AND NON AVAILABILITY OF RESOURCES.

EXT52100019838Mar 2023 → Dec 2024

Reason as filed by the promoterNon-availability of resources

EXT52100028262Mar 2023 → Dec 2025

Reason as filed by the promoterThe project has been extended due to the pending receipt of the Lift NOC and Fire Extinguisher NOC. Additionally, the landscaping and garden development work is yet to be completed.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Feb 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed164

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 164 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Final.pdf17 Jul 2025
Certificates of CA (Form 3)File: Form_3_CA_Signed Final_compressed.pdf17 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Final.pdf17 Jul 2025
Disclosure of sold/ booked inventoryFile: sold circular (30-06-2025).pdf17 Jul 2025
Other - TechnicalFile: PERT CHart.pdf17 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: K P Developers Form 5 24-25 CA Signed Final.pdf7 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: K P Developers Form 5.pdf26 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - (30-09-2024).pdf2 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - (31-12-2024).pdf2 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (31-03-2025).pdf2 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (30-06-2024).pdf2 Jun 2025
Certificates of CA (Form 3)File: Form 3 CA Signed (Q4) Final.pdf2 Jun 2025
Certificates of CA (Form 3)File: Form 3 CA Signed (Q3) Final.pdf2 Jun 2025
Certificates of CA (Form 3)File: Form 3 CA Signed (Q2) Final.pdf2 Jun 2025
Certificates of CA (Form 3)File: Form 3 CA Signed (Q2) Final.pdf2 Jun 2025
Certificates of CA (Form 3)File: Form 3 CA Signed (Q1).pdf2 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 (30-06-2024).pdf2 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 (30-09-2024).pdf2 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 (31-12-2024).pdf2 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 (31-03-2025).pdf2 Jun 2025
Disclosure of sold/ booked inventoryFile: SOLD CIRCULAR APR - JUN - 2024.pdf2 Jun 2025
Disclosure of sold/ booked inventoryFile: SOLD CIRCULAR JUN - SEP - 2024.pdf2 Jun 2025
Disclosure of sold/ booked inventoryFile: SOLD CIRCULAR OCT - DEC - 2024.pdf2 Jun 2025
Disclosure of sold/ booked inventoryFile: SOLD CIRCULAR JAN - MAR - 2025.pdf2 Jun 2025
Declaration in FORM BFile: Form B Notary.pdf23 Apr 2025
Layout approvalFile: Highlighted.pdf4 Jun 2024
Building plan approvalFile: scan (2).pdf4 Jun 2024
Building plan approvalFile: scan (3).pdf4 Jun 2024
Building plan approvalFile: scan (4).pdf4 Jun 2024
Building plan approvalFile: scan (5).pdf4 Jun 2024
Building plan approvalFile: scan (6).pdf4 Jun 2024
Building plan approvalFile: scan (7).pdf4 Jun 2024
Building plan approvalFile: scan (8).pdf4 Jun 2024
Copy of Layout Approval (in case of layout)File: Highlighted.pdf4 Jun 2024
Building Plan Approval (IOD)File: scan (2).pdf4 Jun 2024
Building Plan Approval (IOD)File: scan (3).pdf4 Jun 2024
Building Plan Approval (IOD)File: scan (4).pdf4 Jun 2024
Building Plan Approval (IOD)File: scan (5).pdf4 Jun 2024
Building Plan Approval (IOD)File: scan (6).pdf4 Jun 2024
Building Plan Approval (IOD)File: scan (7).pdf4 Jun 2024
Building Plan Approval (IOD)File: scan (8).pdf4 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Promoters Declaration-Bharat Ratanshi Patel.pdf31 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Promoters Declaration-Ganesh Uttam Kute.pdf31 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Promoters Declaration-Mangesh Uttam Kute.pdf31 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Promoters Declaration-Pachan Karamshi Patel.pdf31 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Promoters Declaration-Piyush Vasant Patel.pdf31 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Promoters Declaration-Rajesh Jayantilal Patel.pdf31 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Promoters Declaration-Rupesh Bhagwan Kute.pdf31 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Promoters Declaration-Shobha Uttam Kute.pdf31 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Promoters Declaration-Shubhagi Pramod Kute.pdf31 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Promoters Declaration-Virji Karamshi Patel.pdf31 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Declaration upload.pdf31 May 2024
Declaration in FORM BFile: FORM B.pdf29 May 2024
CERSAI detailsFile: CERSAI.pdf29 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Declaration.pdf29 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q4 23-24.pdf23 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A (31-03-2024).pdf23 May 2024
Certificates of CA (Form 3)File: Final Form 3 (Q4 23-24).pdf23 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2022 - 2023 - Q-1.pdf22 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2022 - 2023 - Q-2.pdf22 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2022 - 2023 - Q-3.pdf22 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2022 - 2023 - Q-4.pdf22 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2023 - 2024 - Q-1.pdf22 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2023 - 2024 - Q-2.pdf22 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2023 - 2024 - Q-3.pdf22 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2023 - 2024 - Q-4.pdf22 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FY 17-18.pdf22 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FY 18-19.pdf22 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FY 19-20.pdf22 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FY 20-21.pdf22 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q3 21-22.pdf22 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q4 21-22.pdf22 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q1 22-23.pdf22 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q2 22-23.pdf22 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q3 22-23.pdf22 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q4 22-23.pdf22 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q1 23-24.pdf22 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q2 23-24.pdf22 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q3 23-24.pdf22 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FY 19-20.pdf22 May 2024

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 33 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DHANALAXMI HERITAGE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near 013,700+ in Pune

2 kmDHANALAXMI HERITAGECompleted 8Lapsed / revoked 4Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 17 registered projects within 2 km.

Builder: M/S. K P DEVELOPERS & BUILDERS

M/S. K P DEVELOPERS & BUILDERS has 2 registrations on MahaRERA, including DHANALAXMI ANGAN and DHANALAXMI HERITAGE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that DHANALAXMI HERITAGE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if DHANALAXMI HERITAGE is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DHANALAXMI HERITAGE?

The registered promoter entity is M/S. K P DEVELOPERS & BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DHANALAXMI HERITAGE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DHANALAXMI HERITAGE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DHANALAXMI HERITAGE?

The professionals named in the filing: Architect: MR UMESH NAMDE; Engineer: MR RAVINDRA KARNAWAT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DHANALAXMI HERITAGE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DHANALAXMI HERITAGE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DHANALAXMI HERITAGE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.