Home / Browse projects / Mumbai Suburban, Maharashtra / Dev Darshan

Completed No litigation declared Others project

Dev Darshan

By CITY ESTATE DEVELOPERS LIMITED

RG-MH-24491 · RERA P51800007029 · Last updated on MahaRERA portal: 2 Apr 2024

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
20 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

Dev Darshan is a Others project by CITY ESTATE DEVELOPERS LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800007029 on 17 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2022. 1 complaint is on record with the regulator.

At a glance

Project

  • NameDev Darshan
  • TypeOthers
  • Location
    • Kurla
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800007029
  • ReraGenie IDRG-MH-24491

Builder

  • NameCITY ESTATE DEVELOPERS LIMITED
  • Entity typeCompany
  • Managing DirectorDharamchand Jabarchand Surana
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Aug 2017
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings4 building records
  • Documents filed67 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BuildingNA160000
B BuildingNA160000
C BuildingNA00000
D BuildingNA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 2 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.

A Building91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B Building91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C Building0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D Building0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 2 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
Mechanical Stack Parking TowerYes50%

Parking filed46

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots46
Open Space46
BuildingOpen SpaceTotal
A Building2323
B Building2323

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,279 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI12056.6
Proposed, not sanctioned8,223 sq m
Buildings approved4
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCITI SURVEY NO 841 TO 846 FLORENCE CHS LTD

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHemant Karani
EngineerKirtiKumar Shah
PartnerRole in project
CITY ESTATE DEVELOPERS LIMITED-

Litigation declared11

CaseCourtStatus
RAD 1832 OF 2010/2010Samll Causes Court at MumbaiMatter of the Case is going on
1990 /2011Bombay City Civil Court at BombayMattar of the case is going on
3441/2007In the Bombay City Civil Court at BombayMatter of the case is going on
3440/2007In theBombay City Civil Court at BombayMatter of the Case is going on
3431/2007In the Bombay City Civil Court at BombayMatter of the Case is going on
297/462/2007In the Court of Small Caused At BombayMatter of the Case is going on
297/463/2007In the Court of Small Caused At BombayMatter of the case is going on
6947 of 2017/2007In the Court of high CourtCase is going on
1231/ss/2012/2012In the court of LD Metropolitan magistrateCase is going on
14254/2016In the Court of high CourtCase is going on
RAE SUIT NO 438/2012/2012In the Court of Small Caused At BombayCASE IS GOING ON

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000395923Devdarshan Co-operative Housing Society Ltd.M/s. City Estate Developers Limited12/06/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: fotm-3-march-18.pdf2 Apr 2024
Certificates of CA (Form 3)File: form-3-march-19.pdf2 Apr 2024
Certificates of CA (Form 3)File: form-3-march-20.pdf2 Apr 2024
Certificates of CA (Form 3)File: form-3-march-21.pdf2 Apr 2024
Certificates of CA (Form 3)File: form-3-march-22.pdf2 Apr 2024
Certificates of CA (Form 3)File: form-3-march-23.pdf2 Apr 2024
Certificates of CA (Form 3)File: form-3-DEC-23.pdf2 Apr 2024
Certificates of CA (Form 3)File: fotm-3-march-18.pdf1 Apr 2024
Certificates of CA (Form 3)File: fotm-3-march-19.pdf1 Apr 2024
Certificates of CA (Form 3)File: fotm-3-march-20.pdf1 Apr 2024
Certificates of CA (Form 3)File: fotm-3-DEC-23.pdf1 Apr 2024
Certificates of CA (Form 5)File: FORM 5-MAR-18.pdf1 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5-MAR-19.pdf1 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5-MAR-20.pdf1 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5-MAR-21.pdf1 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5-MAR-22.pdf1 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5-MAR-23.pdf1 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MahaRERA - ARCHITECTS 31 Mar 2018.pdf29 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MahaRERA - ARCHITECTS 31 Mar 2019.pdf29 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MahaRERA - ARCHITECTS 31 Mar 2020.pdf29 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MahaRERA - ARCHITECTS 31 Mar 2021.pdf29 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MahaRERA - ARCHITECTS 31 Mar 2022.pdf29 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MahaRERA - ARCHITECTS 31 Mar 2023.pdf29 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MahaRERA - ARCHITECTS 31 Dec 2023.pdf29 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-March 18.pdf29 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-March 19.pdf29 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-MArch 20.pdf29 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-MArch 21.pdf29 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-MArch 22.pdf29 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-MArch 23.pdf29 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Dec 23.pdf29 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A-March 18.pdf29 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A-March 19.pdf29 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A-March 20.pdf29 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A-March 20.pdf29 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A-March 21.pdf29 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-March 22.pdf29 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-March 23.pdf29 Mar 2024
Certificates of CA (Form 3)File: fotm-3-march-21_11zon.pdf29 Mar 2024
Certificates of CA (Form 3)File: fotm-3-march-22_11zon.pdf29 Mar 2024
Certificates of CA (Form 3)File: fotm-3-march-23_11zon.pdf29 Mar 2024
Certificates of CA (Form 5)File: form 5 dev darshan.pdf26 Apr 2019
Certificates of Architect (Form 4)File: form4.pdf26 Apr 2019
Proforma of Allotment letterFile: agreement 7.pdf31 Jul 2017
OtherFile: Declaration.pdf31 Jul 2017
Details of encumbrancesFile: Litigation Encumbrances 290717.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Form 1.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 dev darshan-1.pdf29 Jul 2017
Certificates of CA (Form 3)File: dev darshan form 3.pdf29 Jul 2017
Building plan approvalFile: dev darshan plaan.pdf27 Jul 2017
Layout approvalFile: dev darshan location plan.pdf27 Jul 2017
Building plan approvalFile: iod dev darshan.pdf27 Jul 2017
PAN CardFile: Pan Card.pdf27 Jul 2017
Copy of the legal title reportFile: dev darshan title certificate-1.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: dev darshan location plan.pdf27 Jul 2017
Building Plan Approval (IOD)File: iod dev darshan.pdf27 Jul 2017
Building Plan Approval (IOD)File: dev darshan plaan.pdf27 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: dev darshan cc.pdf27 Jul 2017
Declaration in FORM BFile: dev darshan affidavadit.pdf27 Jul 2017
Proforma of Allotment letterFile: agreement1.pdf27 Jul 2017
Proforma of Allotment letterFile: agreement 2.pdf27 Jul 2017
Proforma of Allotment letterFile: agreement 3.pdf27 Jul 2017
Proforma of Allotment letterFile: agreement 4.pdf27 Jul 2017
Proforma of Allotment letterFile: agreement 5.pdf27 Jul 2017
Proforma of Allotment letterFile: agreement 6.pdf27 Jul 2017
Proforma of Allotment letterFile: agreement 8.pdf27 Jul 2017
Proforma of Allotment letterFile: dev darshan allotment.pdf27 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Dev Darshan on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla6,700+ in Mumbai Suburban

2 kmDev DarshanCompleted 163Lapsed / revoked 140Other 178Dot size: filed unitsN

Filed coordinates, straight-line distance. 481 registered projects within 2 km.

Builder: CITY ESTATE DEVELOPERS LIMITED

CITY ESTATE DEVELOPERS LIMITED has 2 registrations on MahaRERA, including Dev Ashish and Dev Darshan. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Dev Darshan is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dev Darshan?

The registered promoter entity is CITY ESTATE DEVELOPERS LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dev Darshan?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Dev Darshan?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Dev Darshan?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dev Darshan?

The professionals named in the filing: Architect: Hemant Karani; Engineer: KirtiKumar Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dev Darshan?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dev Darshan. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dev Darshan to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.