ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / DESHMUKH ARCADE

Registration lapsed No litigation declared Residential / Group Housing project

DESHMUKH ARCADE

By SHREE SAMARTH KRUPA DEVELOPERS

RG-MH-64148 · RERA P52000008235 · Last updated on MahaRERA portal: 12 Aug 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 90 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
5 of 11Construction stages donefurthest along: External plumbing and external plaster, 95%
16 of 18Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

DESHMUKH ARCADE is a Residential / Group Housing project by SHREE SAMARTH KRUPA DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000008235 on 18 Aug 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 90 months from the original filing. 2 of the 18 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameDESHMUKH ARCADE
  • TypeResidential / Group Housing
  • Location
    • 3537 4A HISSA NO 1A41 PLOT 7
    • PLOT NO 7
    • Neral
    • Karjat
    • Raigarh
    • 410101
  • Pincode410101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000008235
  • ReraGenie IDRG-MH-64148

Builder

  • NameSHREE SAMARTH KRUPA DEVELOPERS
  • Entity typePartnership
  • PartnersVILAS BALIRAM ZANJE, SAURABH PRADIP ANGANE, MILIND VILAS ZANJE
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredAug 2017First promiseJun 2018Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on18 Aug 2017
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 30 Jun 2018)
  • Buildings1 building record
  • Documents filed74 files

Current status

11%2 of 18 units booked
95.0%Work done, per cost certificate

Figures as on 12 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DESHMUKH ARCADENA6618018

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.

DESHMUKH ARCADE: 66% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered1
Open Space1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area516 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Jul 2025

Approvals and building plan

Sanctioning authorityAMC
Permissible FSI590.58
Proposed, not sanctioned591 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVANGANI THANE
Estimated costRs 2.08 cr
Cost incurredRs 1.97 cr
Work done95.0%
BuildingWingEstimatedIncurred
DESHMUKH ARCADENARs 2.08 crRs 1.97 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAISINGH MANMOHAN SINGH AHUJA
EngineerSACHIN MADHUKUMAR BORASE
Chartered AccountantRahul Hotwani
PartnerRole in project
SHREE SAMARTH KRUPA DEVELOPERS-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000011177Jun 2018 → Dec 2022

Reason as filed by the promoterThe project comprises of one building. The work has been due to lack sales and financial problem. We try to increase sales by advertisement but yet now no sale till date. So we kindly request you to extend the date of completion to 30/12/2020 to complete the project.

EXT52000018820Jun 2018 → Dec 2024

Reason as filed by the promoterThe project is under construction & we are putting our full efforts to complete it at the earliest, but it is getting delayed due to non booking of any Flat in our project, Hence we request you to kindly grant us the extension of proposed date for completion of project and find the Letter for application and consent from 51% Flats uploaded in Other Documents as below.

EXT52000013401Jun 2018 → Dec 2023

Reason as filed by the promotera)Due to transportation issues delay in material of procurement. b) Non- availability of workers/ manpower c) As per Banking and Registration department norms RERA extension certificate required for Registration of unsold Flats and claim for inventory of sold flats from bankers.

EA27072502210Jun 2018 → Dec 2025

Reason as filed by the promoterThe project is under construction & we are putting our full efforts to complete it at the earliest, but it is getting delayed due to non booking of any Flat in our project, Hence we request you to kindly grant us the extension of proposed date for completion of project and find the Letter for application and consent from 51% Flats uploaded in Other Documents as below.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1-1_merged.pdf12 Aug 2026
Withdrawal Update Form 2File: Form 2 Signed (1).pdf12 Aug 2026
Withdrawal Update Form 3File: Form 3 Signed_merged.pdf12 Aug 2026
Withdrawal Update Form 1File: Form 1-1_merged.pdf15 Jan 2026
Withdrawal Update Form 2File: Form 2 Signed (1).pdf15 Jan 2026
Withdrawal Update Form 3File: Form 3 Signed_merged.pdf15 Jan 2026
Form 1File: Form 1.pdf25 Dec 2025
Form 2File: Form 2.pdf25 Dec 2025
Form 3File: Form 3.pdf25 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf25 Dec 2025
Withdrawal Update Form 1File: Form 1-1_merged.pdf25 Dec 2025
Withdrawal Update Form 1File: Form 1-1_merged.pdf25 Dec 2025
Withdrawal Update Form 2File: Form 2 Signed (1).pdf25 Dec 2025
Withdrawal Update Form 2File: Form 2 Signed (1).pdf25 Dec 2025
Withdrawal Update Form 3File: Form 3 Signed_merged.pdf25 Dec 2025
Withdrawal Update Form 3File: Form 3 Signed_merged.pdf25 Dec 2025
Form 1File: Form 1-1_merged.pdf13 Sep 2025
Form 2File: Form 2.pdf13 Sep 2025
Form 3File: Form 3 Signed_merged.pdf13 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf13 Sep 2025
Self-declaration of Quarterly ProgressFile: Sold Unsold and Format B.pdf13 Sep 2025
OthersFile: Form 2A.pdf13 Sep 2025
Withdrawal Update Form 1File: Form 1-1_merged.pdf7 Sep 2025
Withdrawal Update Form 1File: Form 1-1_merged.pdf7 Sep 2025
Withdrawal Update Form 2File: Form 2 Signed (1).pdf7 Sep 2025
Withdrawal Update Form 2File: Form 2 Signed (1).pdf7 Sep 2025
Withdrawal Update Form 3File: Form 3 Signed_merged.pdf7 Sep 2025
Withdrawal Update Form 3File: Form 3 Signed_merged.pdf7 Sep 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf7 Sep 2025
Form 1File: Form 1.pdf16 Aug 2025
Form 2File: Form 2.pdf16 Aug 2025
Form 3File: Form 3_compressed.pdf16 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf16 Aug 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf13 Apr 2024
Declaration in FORM BFile: Affidavit cum Declaration Form B.pdf13 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf13 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf13 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A.pdf13 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf13 Apr 2024
Certificates of CA (Form 3)File: Form 3_compressed.pdf13 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf12 Apr 2024
Declaration in FORM BFile: Affidavit cum Declaration Form B.pdf12 Apr 2024
Certificates of CA (Form 3)File: Form 3.pdf6 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf5 Apr 2024
Declaration about Commencement CertificateFile: Format D.pdf5 Apr 2024
Declaration in FORM BFile: Affidavit cum Declaration Form B.pdf5 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Signed.pdf5 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Signed.pdf5 Apr 2024
Disclosure of sold/ booked inventoryFile: Declaration for Sold Unsold.pdf5 Apr 2024
Declaration in FORM BFile: FORMENT B.pdf10 Mar 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf10 Mar 2023
Disclosure of sold/ booked inventoryFile: FORMENT B.pdf10 Mar 2023
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate pdf.pdf2 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate.pdf2 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate.pdf2 Feb 2022
CERSAI detailsFile: Declration Of Cersai pdf.pdf2 Feb 2022
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Booked Inventory.pdf2 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM V 2017-18 PDF.pdf2 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM V 2018-19 PDF.pdf2 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM V 2019-20 PDF.pdf2 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM V 2020-21 PDF.pdf2 Feb 2022
Layout approvalFile: plan.pdf31 Jul 2017
Building plan approvalFile: building plan.pdf31 Jul 2017
PAN CardFile: Pancard.pdf31 Jul 2017
Copy of the legal title reportFile: application for building construction (2).pdf31 Jul 2017
Details of encumbrancesFile: DECLARATION-.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: plan.pdf31 Jul 2017
Building Plan Approval (IOD)File: building plan.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Search.pdf31 Jul 2017
Declaration in FORM BFile: DECLARATION-.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's certificate-il.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's certificate.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA1.pdf31 Jul 2017
Proforma of Allotment letterFile: format for agreement of sale.pdf31 Jul 2017

How this compares with Raigarh

11%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 90 months
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DESHMUKH ARCADE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PLOT NO 75,900+ in Raigarh

2 kmDESHMUKH ARCADECompleted 17Lapsed / revoked 15Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 41 registered projects within 2 km.

Builder: SHREE SAMARTH KRUPA DEVELOPERS

SHREE SAMARTH KRUPA DEVELOPERS has 2 registrations on MahaRERA, including DESHMUKH ARCADE and NARAYAN ARCADE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that DESHMUKH ARCADE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if DESHMUKH ARCADE is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DESHMUKH ARCADE?

The registered promoter entity is SHREE SAMARTH KRUPA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DESHMUKH ARCADE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DESHMUKH ARCADE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DESHMUKH ARCADE?

The professionals named in the filing: Architect: RAISINGH MANMOHAN SINGH AHUJA; Engineer: SACHIN MADHUKUMAR BORASE; Chartered Accountant: Rahul Hotwani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DESHMUKH ARCADE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DESHMUKH ARCADE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DESHMUKH ARCADE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.