Davakhar Elegance Phase II
By DAVAKHAR INFRASTRUCTURE PRIVATE LIMITED
RG-MH-81893 · RERA P51700046008 · Last updated on MahaRERA portal: 19 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 6 months past the filed date
- Completion date moved by 25 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Davakhar Elegance Phase II is a Others project by DAVAKHAR INFRASTRUCTURE PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700046008 on 15 Jun 2022. Possession was promised by 29 Apr 2026 and is now 6 months past that date. The completion date has moved by 25 months from the original filing. 18 of the 38 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameDavakhar Elegance Phase II
- TypeOthers
- Location
- Opp Essar Petrol Pump
- Kalyan East
- Pisawali
- Kalyan
- Thane
- 421306
- Pincode421306
- RERA no.P51700046008
- ReraGenie IDRG-MH-81893
Builder
- NameDAVAKHAR INFRASTRUCTURE PRIVATE LIMITED
- Entity typeCompany
- CINU45400MH2010PTC199726
- GSTIN27AADCD3567H1ZK
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- DirectorSOPAN GOPAL DAVAKHAR
- Other registrations5 more →
- Completed1 of 6
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on15 Jun 2022
- Promised completion29 Apr 2026
- Revised completionRevised to 29 Apr 2026 (originally 31 Mar 2024)
- Buildings1 building record
- Documents filed88 files
Current status
Figures as on 19 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building no 2 | NA | 8 | 8 | 12 | 26 | 38 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 19 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 99%.
Building no 2: 99% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 97% |
| Sanitary Fittings within the flats / premises | 99% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 98% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 98% |
Progress on shared amenities15
As on 19 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed102
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building no 2 | NA | Rs 8.50 cr | Rs 8.33 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Decon Consultants |
| Engineer | Manohar Patil & Associates |
| Chartered Accountant | Ankit Paras Jain & Co |
| Chartered Accountant | Mayur Jain |
| Partner | Role in project |
|---|---|
| DAVAKHAR INFRASTRUCTURE PRIVATE LIMITED | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterwe could not complete the said project within stipulated period due to shortage of sand, inadequate labour supply and changes in policies. The finishing work, fire fighting NOC, electricity main line connection and solar work are yet to be completed. we request you to kindly grant extension till 31.03.2025
Reason as filed by the promoterWe say that our project 80% completed in March-2025. However, we have sold 18 units till dated. Hence, there is an issue for cash flow for the project. There are some inquiries from customer for flats/shops and we are expecting the said inquiries shall be converted into bookings. Considering this situation, we assure you that we shall complete the project by 31.03.2026 in all aspect. Hence, we want to apply for extension for 1 year till 31.03.2026.
Reason as filed by the promoterThe project received its Occupancy Certificate (OC) on 29.04.2026. However, the approved project completion date was 31.03.2026. Since the completion date had already expired before the OC was received, the project has been marked as lapsed, and the completion status is currently not getting updated. Therefore, we are applying for an extension of the project completion date in RERA to regularize the project status and update the completion details accordingly.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 May 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jul 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed88
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: Form-2A 31-03-2025.pdf | 19 Aug 2026 |
| Form 2A (FY 2024-2025)File: Form-2A 31-03-2025.pdf | 19 Aug 2026 |
| Form 2A (FY 2025-2026)File: Form-2A 31-03-2026.pdf | 19 Aug 2026 |
| Form 5 (FY 2024-2025)File: Form-5.pdf | 19 Aug 2026 |
| Form 5 (FY 2024-2025)File: Form-5.pdf | 19 Aug 2026 |
| Layout approvalFile: ELEGANCE PLAN_1.pdf | 31 Jul 2026 |
| Building plan approvalFile: ELEGANCE PLAN_2.pdf | 31 Jul 2026 |
| Building plan approvalFile: ELEGANCE PLAN_3.pdf | 31 Jul 2026 |
| Declaration and undertaking (Annexure A)File: Undertaking.pdf | 31 Jul 2026 |
| Withdrawal Update Form 1File: Final Form-1 31-03-2026 Signed.pdf | 21 May 2026 |
| Withdrawal Update Form 2File: Form 2 Mar 26 DE 2 (1).pdf | 21 May 2026 |
| Withdrawal Update Form 3File: Form-3 Davakhar Elegance Phase-II 31-03-2026 Signed.pdf | 21 May 2026 |
| Withdrawal Update Form 1File: Form 1 30-06-2025.pdf | 23 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 Sept 25 De 1.pdf | 23 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 DEc 25 De 1.pdf | 23 Feb 2026 |
| Withdrawal Update Form 2File: Form-2 30-06-2025.pdf | 23 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 Sept 25 DE 2.pdf | 23 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 Dec 25 DE 2.pdf | 23 Feb 2026 |
| Withdrawal Update Form 3File: Form-3 30-06-2025 Signed.pdf | 23 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Sept.pdf | 23 Feb 2026 |
| Withdrawal Update Form 3File: Fomr 3 Dec.pdf | 23 Feb 2026 |
| Form 1File: Form-1 30-06-2024.pdf | 25 Aug 2025 |
| Form 2File: Form-2 30-06-2024.pdf | 25 Aug 2025 |
| Form 3File: Form-3 30-06-2024.pdf | 25 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold List 30-06-2024.pdf | 25 Aug 2025 |
| Form 1File: Form-1 30-09-2024.pdf | 25 Aug 2025 |
| Form 2File: Form-2 30-09-2024.pdf | 25 Aug 2025 |
| Form 3File: Form-3 30-09-2024.pdf | 25 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold UNsold List 30-09-2024.pdf | 25 Aug 2025 |
| Form 1File: Form-1 31-12-2024.pdf | 25 Aug 2025 |
| Form 2File: Form-2 31-12-2024.pdf | 25 Aug 2025 |
| Form 3File: Form-3 31-12-2024.pdf | 25 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold List 30-06-2025.pdf | 25 Aug 2025 |
| Form 1File: Form-1 31-03-25.pdf | 25 Aug 2025 |
| Form 2File: Form-2 31-March-2025.pdf | 25 Aug 2025 |
| Form 3File: Form-3 All Page Signed.pdf | 25 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold List 31-03-2025.pdf | 25 Aug 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A- 31-03-2024 Sing.pdf | 25 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 (2).pdf | 18 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 31-03-23.pdf | 12 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf | 12 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 31-12-2023 (1)_compressed.pdf | 3 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 31-03-2024_compressed.pdf | 3 May 2024 |
| Declaration in FORM BFile: Form B Davkhar Elegance Ph II_compressed.pdf | 26 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC 31-12-23.pdf | 26 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC 31-03-24.pdf | 26 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SE 31-12-23.pdf | 26 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SE 31-12-23.pdf | 26 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsold 31-12-2023.pdf | 26 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold And Unsold 31-03-2024.pdf | 26 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Davakhar cc.pdf | 30 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: DIPL RERA Form 5 Phase II.pdf | 30 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase 2 30-9-23.pdf | 21 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase 2 30-9-23.pdf | 21 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Cost Estimate Structural Engineer 30-09-23.pdf | 21 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Phase II 31st Mar 23.pdf | 8 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Phase II 30 June 23.pdf | 8 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Cost Estimate Structural Engineer 31-03-23 (1).pdf | 8 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Cost Estimate Structural Engineer 30-06-23.pdf | 8 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 8 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Davkhar Infrastructure Phase 2.pdf | 8 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Adobe Scan 15 Jul 2022 (1).pdf | 15 Jul 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: revised commencement certificate_compressed.pdf | 1 Jul 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Davakhar Elegance Revised CC Compressed.pdf | 1 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Davkhar Form 3_Signed.pdf | 1 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-both party signed.pdf | 2 Jun 2022 |
| Copy of the legal title reportFile: Title Report1_compressed.pdf | 28 May 2022 |
| Copy of the legal title reportFile: Title Report2_compressed.pdf | 28 May 2022 |
| Copy of the legal title reportFile: Title Report3_compressed.pdf | 28 May 2022 |
| Layout approvalFile: Plan copy-1 (1).pdf | 24 May 2022 |
| Layout approvalFile: Plan copy-2.pdf | 24 May 2022 |
| Building plan approvalFile: Plan copy-1 (1).pdf | 24 May 2022 |
| Building plan approvalFile: Plan copy-2.pdf | 24 May 2022 |
| PAN CardFile: Davakhar Pan.pdf | 24 May 2022 |
| Details of encumbrancesFile: No encrumbrances Letter on Letter Head_compressed.pdf | 24 May 2022 |
| Copy of Layout Approval (in case of layout)File: Plan copy-1 (1).pdf | 24 May 2022 |
| Copy of Layout Approval (in case of layout)File: Plan copy-2.pdf | 24 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan copy-1 (1).pdf | 24 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan copy-2.pdf | 24 May 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 24 May 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| DAVAKHAR ELEGANCEP51700016124 | KALYAN EAST, Thane | Apr 2018 | Ongoing | Dec 2022 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations, which the RERA portal never shows together
- All 88 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Davakhar Elegance Phase II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kalyan East7,600+ in Thane
Kohinoor Eden
KGI REALTY PRIVATE LIMITED
Olympia City Phase 1
Balaji Rattan Lifespaces
Krishna Trident
Sonawane Infrastructure Private Limited
Rai s Heaven
RAI RESIDENCY Private Limited
Metro Grande Tower C and D
West Pioneer Properties India Pvt Ltd
SEASON SAHARA BUILDING NO 4 AND 5
SAMARTH SAI BUILDERS & DEVELOPERS
See every Thane project, with the district possession charts
Builder: DAVAKHAR INFRASTRUCTURE PRIVATE LIMITED
DAVAKHAR INFRASTRUCTURE PRIVATE LIMITED has 6 registrations on MahaRERA, including DAVAKHAR ELEGANCE and Davakhar Elegance Phase II. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that Davakhar Elegance Phase II shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Davakhar Elegance Phase II is delayed beyond 29 Apr 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Davakhar Elegance Phase II?
The registered promoter entity is DAVAKHAR INFRASTRUCTURE PRIVATE LIMITED, a company as per the filing. Its CIN U45400MH2010PTC199726 and GSTIN 27AADCD3567H1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Davakhar Elegance Phase II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Davakhar Elegance Phase II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Davakhar Elegance Phase II?
The professionals named in the filing: Architect: Decon Consultants; Engineer: Manohar Patil & Associates; Chartered Accountant: Ankit Paras Jain & Co; Chartered Accountant: Mayur Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Davakhar Elegance Phase II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.