ReraGenieLog inGet a buyer report

Home / Browse projects / Sindhudurg, Maharashtra / Dattaprasad Niwas

Registered No litigation declared Others project

Dattaprasad Niwas

By Dattatray Construction

RG-MH-06946 · RERA P52900054665 · Last updated on MahaRERA portal: 29 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Internal walls, 90%
7 of 32Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

Dattaprasad Niwas is a Others project by Dattatray Construction in Sindhudurg, Maharashtra, registered with MahaRERA as P52900054665 on 2 Feb 2024. Possession is promised by 23 Dec 2027. 25 of the 32 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameDattaprasad Niwas
  • TypeOthers
  • Location
    • Majgaon Road
    • Majgaon
    • Majgaon (CT)
    • Sawantwadi
    • Sindhudurg
    • 416510
  • Pincode416510
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900054665
  • ReraGenie IDRG-MH-06946

Builder

  • NameDattatray Construction
  • Entity typeOthers
  • Named personSweety Sharad Sawant
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Feb 2024
  • Promised completion23 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed82 files

Current status

78%25 of 32 units booked
94.2%Work done, per cost certificate

Figures as on 29 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Dattaprasad NiwasNA4424832

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

Dattaprasad Niwas: 74% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.78%

Progress on shared amenities15

As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed37

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots37
Closed/Covered37

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,600 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Mr Benjamine Anton DsouzaMajgaon (CT)Sindhudurg

Approvals and building plan

Sanctioning authoritytown planning department
Permissible FSI1808.79
Proposed, not sanctioned1,809 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch64, Rameshwar Plaza, Near Moti Talav, Sawantwadi, Tal Sawantwadi, Dist Sindhudurg
Estimated costRs 4.35 cr
Cost incurredRs 4.10 cr
Work done94.24%
BuildingWingEstimatedIncurred
Dattaprasad NiwasNARs 4.25 crRs 4.04 cr
-NARs 10.00 lakhRs 6.29 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Sahas Arvind Patil
EngineerMr Uday Sadashiv Parale
EngineerSwapnil Subhash Patil
Chartered AccountantMr Sudhir Ganesh Naik
Chartered AccountantS V MODAK AND CO
Chartered AccountantS V MODAK AND COMPANY
PartnerRole in project
Dattatray Construction-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 23 Dec 2027

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 8 Ar Certificate No 2 F Y 2025-26 Qtr 4.pdf29 Apr 2026
Withdrawal Update Form 2File: 8 Eng Certificate No 2 F Y 2025-26 Qtr 4.pdf29 Apr 2026
Withdrawal Update Form 3File: 8 CA CERTIFICATE NO 3 Qtr 4 F Y 2025-26.pdf29 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A F Y 2025-26.pdf29 Apr 2026
Form 2File: Engineer Certificate.pdf28 Apr 2026
Form 1File: ARCHITECT CERT.pdf28 Apr 2026
Form 3File: CA Certificate (2).pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf28 Apr 2026
Withdrawal Update Form 1File: 1 Ar Certificate No 1 Qtr 3 F Y 2025-26.pdf28 Mar 2026
Withdrawal Update Form 2File: 2 Eng Certificate No 2 Qtr 3 F Y 2025-26.pdf28 Mar 2026
Withdrawal Update Form 3File: 3 CA Certificate No 3 Qtr 3 F Y 2025-26.pdf28 Mar 2026
Form 5 (FY 2024-2025)File: CA Certificate No 5.pdf9 Feb 2026
Withdrawal Update Form 1File: AR QTR 1 25-26.pdf7 Feb 2026
Withdrawal Update Form 1File: Ar Certificate No 1 2025-26 Qtr 2.pdf7 Feb 2026
Withdrawal Update Form 2File: ER CERT QTR 1 25-26.pdf7 Feb 2026
Withdrawal Update Form 2File: Eng Certificate No 2 2025-26 Qtr 2.pdf7 Feb 2026
Withdrawal Update Form 3File: ca certificate.pdf7 Feb 2026
Withdrawal Update Form 3File: CA Certificate No 3 2025-26 Qtr 2.pdf7 Feb 2026
Form 5 (FY 2023-2024)File: CA certificate No 5 F Y 2023-24.pdf7 Feb 2026
Form 1File: AR QTR 4 24-25.pdf22 Jan 2026
Form 2File: ER CERT QTR 4 24-25.pdf22 Jan 2026
Form 3File: ca certificate.pdf22 Jan 2026
Disclosure of Sold and Booked InventoryFile: sold unsold 24-25 qtr 4.pdf22 Jan 2026
Form 2A (FY 2023-2024)File: quality assurance cert 2023-24.pdf1 Jan 2026
Form 2A (FY 2024-2025)File: quality assurance cert 2024-25.pdf1 Jan 2026
Form 1File: architect cert qtr 1.pdf6 Oct 2025
Form 2File: ENGINEER CERTIFICATE QTR1.pdf6 Oct 2025
Form 3File: CA CERTIFICATE FORM 3 QTR 1.pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD QTR 1 2024-25.pdf6 Oct 2025
Form 1File: architect cert qtr 2.pdf6 Oct 2025
Form 2File: ENGINEER CERTIFICATE QTR 2.pdf6 Oct 2025
Form 3File: CA CERTificate FORM 3 qtr2.pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD QTR 2 2024-25.pdf6 Oct 2025
Form 1File: Architect certificate Qtr 3.pdf6 Oct 2025
Form 2File: ENGINEER CERTIFICATE QTR 3.pdf6 Oct 2025
Form 3File: CA Certificate FORM 3 QTR 3.pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD QTR 3 2024-25.pdf6 Oct 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD QTR 4 2024-25.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate Qtr 3.pdf15 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FORM 3 QTR 1_compressed.pdf15 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTificate FORM 3 qtr2_compressed.pdf15 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FORM 3 QTR 3_compressed.pdf15 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect cert qtr 2.pdf5 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect cert qtr 1.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE QTR 3.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Architect certificate Qtr 3.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE QTR 2.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE QTR1.pdf5 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD QTR 1.pdf5 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD QTR 2.pdf5 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD QTR 3.pdf5 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALLLITY ASSURANCE CERTIFICATE 23-24.pdf5 Feb 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: BANK LETTER Dattaprasad niwas (1).pdf5 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: SECURED,UNSECURED FINANCE AVAILED.pdf5 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA certificate No 5 F Y 2023-24.pdf13 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: dattaprasad niwas permission new.pdf9 Nov 2023
Other - TechnicalFile: SELF DECLARATION.pdf4 Nov 2023
Copy of the legal title reportFile: LEGAL TITLE REPORT (2)_compressed.pdf27 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: town planning permission_compressed.pdf27 Oct 2023
Declaration in FORM BFile: Form B Promoter_compressed.pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT.pdf27 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_compressed.pdf27 Oct 2023
CERSAI detailsFile: CERSAI_Search_Report_200284818702_For_Asset_Based_Search_27_10_2023_11_05_13_762.pdf27 Oct 2023
Proforma of Agreement for saleFile: Agreement for RERA registration.pdf27 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Saperate bank ac details.pdf27 Oct 2023
Other - LegalFile: SELF DECLARATION.pdf27 Oct 2023
Layout approvalFile: SACTION PLAN 1.pdf26 Oct 2023
Building plan approvalFile: NA Order_compressed.pdf26 Oct 2023
Details of encumbrances concerned to FinanceFile: FINANCE ENCUMBRACE.pdf26 Oct 2023
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRACE.pdf26 Oct 2023
Details of encumbrances concerned to LegalFile: FINANCE ENCUMBRACE.pdf26 Oct 2023
Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRACE.pdf26 Oct 2023
Copy of Layout Approval (in case of layout)File: SACTION PLAN 1.pdf26 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: NA Order_compressed.pdf26 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: Permission Grampanchayat.pdf26 Oct 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf26 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: OTHER REAL ESTATE MEMBER.pdf26 Oct 2023
Proforma of Allotment letterFile: PROFARMA OF ALLOTMENT LETTER 1.pdf26 Oct 2023
Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT.pdf26 Oct 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION AGREEMENT.pdf26 Oct 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Dattaguru NiwasP52900034870majgaon, Sindhudurg80Apr 2022OngoingMar 2029Not due yet

How this compares with Sindhudurg

78%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is on the register

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep Dattaprasad Niwas on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Majgaon530+ in Sindhudurg

2 kmDattaprasad NiwasCompleted 31Lapsed / revoked 10Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 55 registered projects within 2 km.

Builder: Dattatray Construction

Dattatray Construction has 2 registrations on MahaRERA, including Dipali Residency and Dattaprasad Niwas. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if Dattaprasad Niwas is delayed beyond 23 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dattaprasad Niwas?

The registered promoter entity is Dattatray Construction, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dattaprasad Niwas?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Dattaprasad Niwas?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dattaprasad Niwas?

The professionals named in the filing: Architect: Mr Sahas Arvind Patil; Engineer: Mr Uday Sadashiv Parale; Engineer: Swapnil Subhash Patil; Chartered Accountant: Mr Sudhir Ganesh Naik; Chartered Accountant: S V MODAK AND CO; Chartered Accountant: S V MODAK AND COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dattaprasad Niwas?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dattaprasad Niwas. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dattaprasad Niwas to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.