ReraGenieLog inGet a buyer report

Home / Browse projects / Satara, Maharashtra / D P KARISHMA PARK

Registration lapsed No litigation declared Others project

D P KARISHMA PARK

By DP DEVELELOPERS

RG-MH-62317 · RERA P52700017301 · Last updated on MahaRERA portal: 8 Nov 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
11 of 33Construction stages doneacross 3 buildings; furthest along: External plumbing and external plaster, 90%
0Complaints at MahaRERAon this registration
Jump to the 49 documents Report an error

D P KARISHMA PARK is a Others project by DP DEVELELOPERS in Satara, Maharashtra, registered with MahaRERA as P52700017301 on 31 Jul 2018. Possession was promised by 31 Dec 2023 and is now 34 months past that date. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameD P KARISHMA PARK
  • TypeOthers
  • Location
    • 1123 A KAS ROAD
    • SHANIWAR PETH
    • Satara
    • 415002
  • Pincode415002
  • RERA no.P52700017301
  • ReraGenie IDRG-MH-62317

Builder

  • NameDP DEVELELOPERS
  • Entity typePartnership
  • PartnerSIDDHARTH MAGANLAL PUNGALIYA
  • Declared earlier projects2 →

Key dates

34 months past promisethis monthRegisteredJul 2018First promiseMar 2023Revised toDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Jul 2018
  • Promised completion31 Dec 2023
  • Revised completionRevised to 31 Dec 2023 (originally 30 Mar 2023)
  • Buildings3 building records
  • Documents filed49 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA50000
BNA80000
CNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 8 Nov 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 90%.

A98%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
B9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Nov 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered8
BuildingClosed/CoveredTotal
A11
B77

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,566 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
D P DEVELOPERSPune (M Corp.)Pune

Approvals and building plan

Permissible FSI3130.77
Proposed, not sanctioned3,131 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAPTE ROAD PUNE

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJAIDEEP DESHPANDE
EngineerP S KULKARNI
PartnerRole in project
DP DEVELELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52700017134Mar 2023 → Dec 2023

Reason as filed by the promoterWe have received stop work from sanctioning authority due to some irrelevant complaint and same was lifted back on 30th June 2023 and thus causing the delay in completion. relevant documents are attached herewith.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 May 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jul 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed49

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf8 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 3.pdf7 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf7 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM.pdf7 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 4.pdf7 Nov 2023
Declaration in FORM BFile: FORMAT B_page-0001.pdf2 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)_page-0001.pdf1 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)_page-0001.pdf1 Nov 2023
Certificates of CA (Form 3)File: 3 Certificates of CA (Form 3)_page-0001 (2).pdf1 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2019.pdf1 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2020.pdf1 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2021.pdf1 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2021.pdf1 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 2023.pdf1 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A 2023.pdf31 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A 2023.pdf31 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2019.pdf21 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2020.pdf21 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2021.pdf21 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2022.pdf21 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold.pdf21 Sep 2023
Certificates of CA (Form 3)File: CA-compressed.pdf21 Sep 2023
Certificates of CA (Form 3)File: CA_page-0001.pdf21 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: mar 19.pdf17 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mar 20.pdf17 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sept 19.pdf17 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: mar21.pdf17 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: mar21.pdf17 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: mar22.pdf17 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mar 23.pdf17 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dec 18.pdf17 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SEP 19.pdf17 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certifiate_March 2023.pdf1 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineering Certifiate_March 2023.pdf1 Sep 2023
Building plan approvalFile: Revisedplan.pdf28 Mar 2022
Layout approvalFile: Revisedplan.pdf28 Mar 2022
Copy of Layout Approval (in case of layout)File: Revisedplan.pdf28 Mar 2022
Building Plan Approval (IOD)File: Revisedplan.pdf28 Mar 2022
Layout approvalFile: BASEMENT FLOOR PLAN B WING.pdf20 Jul 2018
Copy of Layout Approval (in case of layout)File: BASEMENT FLOOR PLAN B WING.pdf20 Jul 2018
Certificates of CA (Form 3)File: 20180720075900.pdf20 Jul 2018
Declaration in FORM BFile: Scan Form B.pdf17 Jul 2018
Building plan approvalFile: TYPICAL 2ND 4TH FLOOR PLAN C WING.pdf13 Jul 2018
Details of encumbrancesFile: 20180713022235.pdf13 Jul 2018
Building Plan Approval (IOD)File: TYPICAL 2ND 4TH FLOOR PLAN C WING.pdf13 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: 20180713023631.pdf13 Jul 2018
Proforma of Allotment letterFile: 20180713020854.pdf13 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf3 Jul 2018
Copy of the legal title reportFile: Search Report.pdf24 May 2018

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
NAKSHATRAMACHI PETH SATARA15CompletedMay 2016Late, Jun 2016
MANGALYAMANGALWAR PETH SATARA17CompletedMar 2014Late, Mar 2018

How this compares with Satara

16%of Satara projects moved their completion datethis one moved by 9 months
35%of Satara registrations have lapsed or been cancelledthis one is among them

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep D P KARISHMA PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHANIWAR PETH1,100+ in Satara

Builder: DP DEVELELOPERS

DP DEVELELOPERS has 1 registration on MahaRERA, including D P KARISHMA PARK. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What does it mean that D P KARISHMA PARK shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if D P KARISHMA PARK is delayed beyond 31 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of D P KARISHMA PARK?

The registered promoter entity is DP DEVELELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in D P KARISHMA PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for D P KARISHMA PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at D P KARISHMA PARK?

The professionals named in the filing: Architect: JAIDEEP DESHPANDE; Engineer: P S KULKARNI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in D P KARISHMA PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About D P KARISHMA PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save D P KARISHMA PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.