D N Nagar Shivneri CHS Ltd
RG-MH-11156 · RERA P51800004197 · Last updated on MahaRERA portal: 28 Sep 2019
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 43 months past the filed date
- 22 complaints at MahaRERA
- Completion date moved by 48 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
D N Nagar Shivneri CHS Ltd is a Residential / Group Housing project by Sai Siddhant Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800004197 on 8 Aug 2017. Possession was promised by 30 Mar 2023 and is now 43 months past that date. The completion date has moved by 48 months from the original filing. 22 complaints are on record with the regulator.
At a glance
Project
- NameD N Nagar Shivneri CHS Ltd
- TypeResidential / Group Housing
- Location
- Ganesh Chawk
- D N Nagar Andheri West
- Andheri
- Mumbai Suburban
- 400053
- Pincode400053
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800004197
- ReraGenie IDRG-MH-11156
Builder
- NameSai Siddhant Developers
- Entity typePartnership
- PartnersHeena Jayesh Tanna, Vivek Jayesh Tanna
- Other registrations4 more →
- No longer live5 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on8 Aug 2017
- Promised completion30 Mar 2023
- Revised completionRevised to 30 Mar 2023 (originally 31 Mar 2019)
- Buildings1 building record
- Documents filed26 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Sai Shivneri | NA | 17 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 Sep 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 80%.
Sai Shivneri: 46% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 75% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 30% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 28 Sep 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 70% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed90
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| D N Nagar Shivneri CHS Ltd | Andheri | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ellora Project Consultants Pvt Ltd |
| Engineer | Ellora Project Consultants Pvt Ltd |
| Chartered Accountant | Anup B.Agrawal & Co. |
| Chartered Accountant | Mohandas & Co |
| Partner | Role in project |
|---|---|
| Sai Siddhant Developers | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterI Mr. Jayesh Tanna,say that, due to some issues which aroused with the society as well as due to change in permission related norms where in MHADA became the planning authority, getting further approvals from MHADA is stuck and the project got stuck and which has resulted in to delay in completion of the project, however the issues with society is now been resolved and MHADA authority has also started with processing of files for further approvals hence considering the issues, I herewith request your good self to kindly allow us for extension of time for completion of project to 30.03.2020 fro
Reason as filed by the promoterThis is to bring to your kind attention that the initial date of completion of the project so mentioned by us was 31.3.2019 after which a further extension was acquired by us till 30.3.2020. It is only due to flip flops in the MHADA policy because of which we could not obtain further permission and the project could not be completed. Moreover, due to such mitigating circumstances, existing members of the society have sent us a termination notice which is also challenged by us in the appropriate forum. Also, due to sluggish market conditions, increased rate of premiums and temporary financial c
Litigation declared4
| Case | Court | Status |
|---|---|---|
| 628/2017 | High Court of Judicature at Bombay | Hearing |
| 50/2018 | High Court of Judicature at Bombay | Pending |
| 388/2020 | High Court of Judicature at Bombay | Disposed off |
| -/2020 | Arbitration Tribunal | Pending |
Complaints filed with MahaRERA22
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000198982 | D. N. Nagar Shivneri Co-operative Housing Society Limited | Sai Siddhant Developers | 13/11/2021 |
| CC006000000570817 | vijaychoksi | VIRAF MAJRA | 18/06/2024 |
| CC006000000580882 | vijay choksi | Kamla Jain | 22/06/2024 |
| CC006000000580900 | vijay choksi | Deepak Kadam | 24/06/2024 |
| CC006000000580901 | vijay choksi | Sunil Keswani | 24/06/2024 |
| CC006000000197873 | Romil Ravindra Desai | M/s. Sai Siddhant Developers | 04/08/2021 |
| CC006000000210434 | KAMLA PARASMAL JAIN | SAI SIDDHANT DEVELOPERS | 17/03/2022 |
| CC006000000210449 | Siddharth Dinesh Shetty and Vatsala Shetty | SAI SIDDHANT DEVELOPERS | 19/03/2022 |
| CC006000000210454 | ASHISH LAL MOHAN GUPTA | SAI SIDDHANT DEVELOPERS | 19/03/2022 |
| CC006000000210461 | Pitamber Assandas Kewlani | SAI SIDDHANT DEVELOPERS | 20/03/2022 |
| CC006000000210538 | M/s Synergy Infra Project | M/s Sai Siddhant Developers | 25/03/2022 |
| CC006000000251544 | RAJNISH VISHWABANDHU GAUTAM | SAI SIDDHANT DEVELOPERS | 24/06/2022 |
| CC006000000282198 | Dushyant Jain | M/s.Sai Siddhant Developers | 09/08/2022 |
| CC006000000292221 | VIRAF KEKOBAD MAJRA | SAI SIDDHANT DEVELOPERS | 05/08/2022 |
| CC006000000398044 | Deepika Kotian | Sai Siddhant Developers | 02/11/2023 |
| CC006000000408189 | Vijay Jadhav | Sai Siddhant Developers | 07/01/2024 |
| CC006000000408478 | SUNIL KUMAR KESWANI | Sai Siddhant Developers | 14/12/2023 |
| CC006000000428879 | SURESH KUMAR VATNANI | SAI SIDDHANT DEVELOPERS | 17/01/2024 |
| CC006000000429523 | Deepak Ramchandra Kadam | MESSRS SAI SIDDHANT DEVELOPERS | 08/03/2024 |
| CC006000000480221 | Sunil Kumar Gupta | Sai Siddhant Developers | 07/05/2024 |
| CC006000000591487 | Honey Katyal | Sai Siddhant Developers | 09/08/2024 |
| CC12601072 | aman abdullah | Sai Siddhant Developers | 27/02/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed26
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 5)File: shivneri.pdf | 28 Sep 2019 |
| Certificates of CA (Form 5)File: Bldg no 5.pdf | 13 Oct 2018 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Shivneri.pdf | 30 Mar 2018 |
| Details of encumbrancesFile: ENCUMBRANCES.pdf | 30 Jul 2017 |
| Declaration in FORM BFile: Form B Affidavit.pdf | 30 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf | 29 Jul 2017 |
| Certificates of CA (Form 3)File: CA Certificate bldg no 5.pdf | 29 Jul 2017 |
| Proforma of Allotment letterFile: AOS Bldg no 5.pdf | 29 Jul 2017 |
| Building plan approvalFile: iod.pdf | 24 Jul 2017 |
| Layout approvalFile: scan-001.pdf | 24 Jul 2017 |
| Layout approvalFile: scan-002.pdf | 24 Jul 2017 |
| Layout approvalFile: scan-003.pdf | 24 Jul 2017 |
| Layout approvalFile: scan-004.pdf | 24 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: scan-001.pdf | 24 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: scan-002.pdf | 24 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: scan-003.pdf | 24 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: scan-004.pdf | 24 Jul 2017 |
| Building Plan Approval (IOD)File: iod.pdf | 24 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: CC shivneri chs.pdf | 24 Jul 2017 |
| OtherFile: 1 to 25.pdf | 24 Jul 2017 |
| OtherFile: 26 to 52.pdf | 24 Jul 2017 |
| OtherFile: 53 to 75.pdf | 24 Jul 2017 |
| OtherFile: 76 to 81.pdf | 24 Jul 2017 |
| PAN CardFile: Pan card copy siddhant.pdf | 17 Jul 2017 |
| Copy of the legal title reportFile: Titel Certificate.pdf | 17 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Bldg 5.pdf | 17 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 26 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep D N Nagar Shivneri CHS Ltd on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near D N Nagar Andheri West6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 311 registered projects within 2 km.
LIVSMART KURLA
D. K. REALTY (INDIA) PVT. LTD.
MOONGIPA ARCADE
MOONGIPA REALTY PRIVATE LIMITED
LINKBAY RESIDENCES PHASE I
PORTSMOUTH BUILDCON PRIVATE LIMITED
Purva Estrella
Puravankara Ltd
78 LAKE TOWN
ANIRDESH DEVELOPERS PRIVATE LIMITED
Transcon Triumph Tower 2
Transcon Triumph Phase 2 Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: Sai Siddhant Developers
Sai Siddhant Developers has 5 registrations on MahaRERA, including D N Nagar Suryakiran CHS Limited and D N Nagar Shivneri CHS Ltd. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that D N Nagar Shivneri CHS Ltd shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if D N Nagar Shivneri CHS Ltd is delayed beyond 30 Mar 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of D N Nagar Shivneri CHS Ltd?
The registered promoter entity is Sai Siddhant Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in D N Nagar Shivneri CHS Ltd?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against D N Nagar Shivneri CHS Ltd?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for D N Nagar Shivneri CHS Ltd?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at D N Nagar Shivneri CHS Ltd?
The professionals named in the filing: Architect: Ellora Project Consultants Pvt Ltd; Engineer: Ellora Project Consultants Pvt Ltd; Chartered Accountant: Anup B.Agrawal & Co.; Chartered Accountant: Mohandas & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in D N Nagar Shivneri CHS Ltd?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback