D N Nagar Dwarka CHS Ltd.
RG-MH-10724 · RERA P51800003897 · Last updated on MahaRERA portal: 14 Oct 2021
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 67 months past the filed date
- 14 complaints at MahaRERA
- Completion date moved by 27 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
D N Nagar Dwarka CHS Ltd. is a Residential / Group Housing project by SSSC Escatics Pvt. Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800003897 on 6 Aug 2017. Possession was promised by 31 Mar 2021 and is now 67 months past that date. The completion date has moved by 27 months from the original filing. 14 complaints are on record with the regulator.
At a glance
Project
- NameD N Nagar Dwarka CHS Ltd.
- TypeResidential / Group Housing
- Location
- D N Nagar Ganesh Chawk
- Andheri West
- Andheri
- Mumbai Suburban
- 400053
- Pincode400053
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800003897
- ReraGenie IDRG-MH-10724
Builder
- NameSSSC Escatics Pvt. Ltd.
- Entity typeCompany
- Managing DirectorVivek Jayesh Tanna
- Other registrations2 more →
- No longer live3 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on6 Aug 2017
- Promised completion31 Mar 2021
- Revised completionRevised to 31 Mar 2021 (originally 31 Dec 2018)
- Buildings1 building record
- Documents filed48 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Sai Dwarka | NA | 15 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 Oct 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 80%.
Sai Dwarka: 49% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 65% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 25% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 14 Oct 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed35
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| hjasjdsakd | Andheri | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sanjay B Shah |
| Engineer | K C Shah Consultants |
| Chartered Accountant | Anup B.Agrawal & Co. |
| Chartered Accountant | Mohandas & Co |
| Partner | Role in project |
|---|---|
| SSSC Escatics Pvt. Ltd. | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe request for a further extension of 15 months as there was an unintentional delay in completing the project due to certain mitigating circumstances. These mitigating circumstances include flipflops in MHADA policy, non clearance of MHADA layout of D N Nagar. Because of such reasons which were beyond our control, the project got delayed. In, lieu of such delay, being a redevelopment project, the society had also filed litigation against us which is now resolved. Also MHADA has now become the special planning authority and hence we are in process of obtaining further permissions from MHADA.
Reason as filed by the promoterI Mr. Jayesh Tanna, promoter of the project D N Nagar Dwarka CHS Ltd a society redevelopment project at plot having Survey No. 106A, CTS no 195 part at D N Nagar, Andheri, Mumbai Suburban, 400053 duly registered with MahaRERA having project registration number: P51800003897 hereby say that while registering the project with MahaRERA authority in the month of July 2017, the project completion date was mentioned as 31.12.2018. I further say that, due to some issues which aroused with the society as well as due to change in permission related norms where in MHADA became the planning authority, ge
Complaints filed with MahaRERA14
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000055384 | MAHESH HOTCHAND THAWANI | SSSC ESCATICS PRIVATE LIMITED | 21/07/2018 |
| CC006000000055410 | RINKU MAHESH THAWANI | SSSC ESCATICS PRIVATE LIMITED | 21/07/2018 |
| CC006000000251385 | Mr. Kuldeep Singh Sarin | M/s SSSC Escatics Pvt. Ltd. | 30/07/2022 |
| CC006000000262013 | PUJA ISHWAR | SSSC ESCATICS PVT LTD | 22/07/2022 |
| CC006000000292790 | Ritesh Chudasama | M/s. SSSC ESCATICS Pvt. Ltd. | 27/09/2022 |
| CC006000000302992 | Jaikumar Prakash Soni | M/s. SSSC ESCATICS Pvt. Ltd. | 18/10/2022 |
| CC006000000303160 | Suraj Bhaskar Baadkar | M/s. SSSC ESCATICS Pvt Ltd | 01/11/2022 |
| CC006000000303166 | Prachi Pradeep Maroo | SSSC Escatics Private Limited | 04/11/2022 |
| CC006000000375246 | Neetu Arjun Sharma | M/s SSSC ESCATICS Pvt Ltd | 12/04/2023 |
| CC006000000398097 | Vijay Jadhav | Director of the SSSC Escatics Private Limited | 07/01/2024 |
| CC006000000480089 | SUNITA DARSHANLAL OBEROI | Shree Sai Sagar Consultants | 17/04/2024 |
| CC006000000500523 | Rajkumar Singh | SSSC Escatics Pvt. Ltd. | 21/05/2024 |
| CC12500316 | Vimmi Amar Singh | SSSC Escatics Pvt. Ltd. | 29/01/2025 |
| CC12600386 | Parthiv Vinaykant Parekh | SSSC Escatics Pvt. Ltd. | 21/01/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed48
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: List 2.pdf | 14 Oct 2021 |
| Certificates of CA (Form 3)File: form 3_compressed.pdf | 14 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5.pdf | 14 Oct 2021 |
| Declaration about Commencement CertificateFile: Declaration CC.pdf | 3 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Disclouser of sold list.pdf | 3 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: DWARKA1819.pdf | 2 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arcitect Certificate Bldg no 28 1920.pdf | 24 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arcitect Certificate Bldg no 28 21.pdf | 24 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Subhash Aprl 2019 to jun 2019.pdf | 24 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Subhash jully 2019 to sept2019.pdf | 24 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Oct 2019 to Dec 2019.pdf | 24 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Subash jan 2020 to Mar 2020.pdf | 24 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Apr 2020 to jun 2020.pdf | 24 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: july 2020 to sept 2020.pdf | 24 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Subhash oct 2020 to dec 2020.pdf | 24 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Subash jan 2020 to Mar 2020.pdf | 24 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Subash jan 2021 to Mar 2021_compressed.pdf | 24 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Certificate Dwarka 28 MArch 2020_compressed.pdf | 24 Jul 2021 |
| Certificates of CA (Form 5)File: dwarka.pdf | 28 Sep 2019 |
| Details of encumbrancesFile: Encumbrance Dwarka.pdf | 11 Jan 2019 |
| Certificates of CA (Form 5)File: bldg no 28.pdf | 13 Oct 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dwarka.pdf | 31 Mar 2018 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Dwarka.pdf | 30 Mar 2018 |
| Proforma of Allotment letterFile: Final Dwarka agreement.pdf | 25 Nov 2017 |
| Details of encumbrancesFile: Encumbrance bldg 28.pdf | 29 Jul 2017 |
| Declaration in FORM BFile: Form B Affidavit Bldg no 28.pdf | 29 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate for Maha RERA for Bldg no 28.pdf | 29 Jul 2017 |
| Certificates of CA (Form 3)File: CA Certificate bldg no 28.pdf | 29 Jul 2017 |
| Proforma of Allotment letterFile: AOS Bldg no 28.pdf | 29 Jul 2017 |
| Layout approvalFile: 1_Page_7.pdf | 24 Jul 2017 |
| Building plan approvalFile: IOD.pdf | 24 Jul 2017 |
| Layout approvalFile: 1_Page_4.pdf | 24 Jul 2017 |
| Layout approvalFile: 1_Page_5.pdf | 24 Jul 2017 |
| Layout approvalFile: 1_Page_6.pdf | 24 Jul 2017 |
| PAN CardFile: Pan Card_SSSC EPL.pdf | 24 Jul 2017 |
| Copy of the legal title reportFile: Title.pdf | 24 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: 1_Page_4.pdf | 24 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: 1_Page_5.pdf | 24 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: 1_Page_6.pdf | 24 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: 1_Page_7.pdf | 24 Jul 2017 |
| Building Plan Approval (IOD)File: IOD.pdf | 24 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 24 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dwarka.pdf | 24 Jul 2017 |
| OtherFile: 1 to 22.pdf | 24 Jul 2017 |
| OtherFile: 23 to 40.pdf | 24 Jul 2017 |
| OtherFile: 41 to 52.pdf | 24 Jul 2017 |
| OtherFile: 53 to 70.pdf | 24 Jul 2017 |
| OtherFile: 71 to 78.pdf | 24 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 48 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep D N Nagar Dwarka CHS Ltd. on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Andheri West6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 284 registered projects within 2 km.
LIVSMART KURLA
D. K. REALTY (INDIA) PVT. LTD.
MOONGIPA ARCADE
MOONGIPA REALTY PRIVATE LIMITED
LINKBAY RESIDENCES PHASE I
PORTSMOUTH BUILDCON PRIVATE LIMITED
Purva Estrella
Puravankara Ltd
78 LAKE TOWN
ANIRDESH DEVELOPERS PRIVATE LIMITED
Transcon Triumph Tower 2
Transcon Triumph Phase 2 Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: SSSC Escatics Pvt. Ltd.
SSSC Escatics Pvt. Ltd. has 3 registrations on MahaRERA, including D N Nagar Dwarka CHS Ltd. and Nest Wing A. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that D N Nagar Dwarka CHS Ltd. shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if D N Nagar Dwarka CHS Ltd. is delayed beyond 31 Mar 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of D N Nagar Dwarka CHS Ltd.?
The registered promoter entity is SSSC Escatics Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in D N Nagar Dwarka CHS Ltd.?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against D N Nagar Dwarka CHS Ltd.?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for D N Nagar Dwarka CHS Ltd.?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at D N Nagar Dwarka CHS Ltd.?
The professionals named in the filing: Architect: Sanjay B Shah; Engineer: K C Shah Consultants; Chartered Accountant: Anup B.Agrawal & Co.; Chartered Accountant: Mohandas & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in D N Nagar Dwarka CHS Ltd.?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback