Home / Browse projects / Palghar, Maharashtra / CRYSTAL EMPIRE
CRYSTAL EMPIRE
RG-MH-77352 · RERA P99000008459 · Last updated on MahaRERA portal: 26 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 34 months past the filed date
- 7 complaints at MahaRERA
- Completion date moved by 30 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CRYSTAL EMPIRE is a Residential / Group Housing project by SAI CRYSTAL GROUP in Palghar, Maharashtra, registered with MahaRERA as P99000008459 on 19 Aug 2017. Possession was promised by 30 Dec 2023 and is now 34 months past that date. The completion date has moved by 30 months from the original filing. 214 of the 218 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete. 7 complaints are on record with the regulator.
At a glance
Project
- NameCRYSTAL EMPIRE
- TypeResidential / Group Housing
- Location
- Achole Road
- Nallasopara East
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401209
- Pincode401209
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000008459
- ReraGenie IDRG-MH-77352
Builder
- NameSAI CRYSTAL GROUP
- Entity typePartnership
- PartnersDAYARAM ZURI PAL, VIJAY YASHWANT GHOLAP, RAVINDRANATH RAMADHAR SINGH, ZARRAR MUSAVVIR DAYER, IMTIYAZHUSSAIN ALIHUSSAIN KHAN, IBRAHIM SAIFUDDIN KAPADIA, MANOJ RAJBAHADUR PAL, ASLAM MUSHA ALI SHAIKH, JAVED MOHAMMED HALIM SHAIKH, RAJESH MAHABAL PAL
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on19 Aug 2017
- Promised completion30 Dec 2023
- Revised completionRevised to 30 Dec 2023 (originally 30 Jun 2021)
- Buildings1 building record
- Documents filed43 files
Current status
Figures as on 26 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| CRYSTAL EMPIRE | NA | 17 | 14 | 194 | 24 | 218 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 26 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.
CRYSTAL EMPIRE: 98% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 90% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 26 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 30% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 30% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANJAY S NARANG |
| Engineer | Mukesh Kumar |
| Chartered Accountant | Anilkumar Parmar |
| Partner | Role in project |
|---|---|
| SAI CRYSTAL GROUP | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterCovid Pendamic
Reason as filed by the promoter.Explanatory note regarding the state of development works in the projects and reason for not completing the development works in the projects within the period declared in the declaration submitted in FORM ‘B’ at the time of making application for the registration of ‘CRYSTAL EMPIRE’ - As per the details mentioned at the time of registration of the project at the MahaRERA Website we had mentioned 30th DECEMBER 2022 as the project completion date, we were unable to complete the project due to various unavoidable reasons. Such as 1. In 2020 due to the Pandemic situation of COVID-19 and locked d
Complaints filed with MahaRERA7
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000089608 | jyoti chaudhari and aakash chaudhari | sai crystal group | 14/06/2019 |
| CC12501400 | Niraj Balkrishna Tiwari | SAI CRYSTAL GROUP | 26/04/2025 |
| CC12501423 | Upendra Avdesh Singh | SAI CRYSTAL GROUP | 28/04/2025 |
| CC12501425 | Manish Arvind Yadav | SAI CRYSTAL GROUP | 28/04/2025 |
| CC12501912 | sanjeev pralhad gupta | SAI CRYSTAL GROUP | 11/06/2025 |
| CC12502035 | Chandan Kumar Choudhary | SAI CRYSTAL GROUP | 21/06/2025 |
| CC12502034 | Raju Dnyanoo Zimbal | SAI CRYSTAL GROUP | 21/06/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Jan 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Jan 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Jan 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed43
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 Oct to Dec 23.pdf | 26 Feb 2026 |
| Form 2File: Form 2 Oct to Dec 23.pdf | 26 Feb 2026 |
| Form 3File: Form 3 Oct to Dec 23.pdf | 26 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Oct to Dec 23_11zon.pdf | 26 Feb 2026 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_compressed.pdf | 20 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: scg form 5 20-21.pdf | 20 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CRYSTAL EMPIRE FORM 5 21-22.pdf | 18 Feb 2023 |
| Declaration about Commencement CertificateFile: DECLARATION OF CC.pdf | 9 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SAI CRYSTAL GROUP FORM 1_compressed.pdf | 9 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SAI CRYSTAL GROUP FORM 2.pdf | 9 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: SAI CRYSTAL GROUP FORM 2A.pdf | 9 Feb 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200258663685_For_Asset_Based_Search_25_01_2023_17_07_39_351.pdf | 9 Feb 2023 |
| Certificates of CA (Form 3)File: FORM 3.pdf | 6 Feb 2023 |
| Declaration about Commencement CertificateFile: cc cir 32.pdf | 21 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: E WIng 1.pdf | 14 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: F sold 4.pdf | 14 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 18 -19-.pdf | 14 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19 -20.pdf | 14 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2a-1-converted.pdf | 12 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2a-3-converted.pdf | 12 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 26 Jul 2021 |
| Layout approvalFile: BLUE PRINT SCG.pdf | 15 Jan 2021 |
| Building plan approvalFile: BLUE PRINT SCG.pdf | 15 Jan 2021 |
| Copy of Layout Approval (in case of layout)File: BLUE PRINT SCG.pdf | 15 Jan 2021 |
| Building Plan Approval (IOD)File: BLUE PRINT SCG.pdf | 15 Jan 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Copy 931.pdf | 15 Jan 2021 |
| Certificates of CA (Form 5)File: img035.pdf | 28 Nov 2018 |
| Certificates of CA (Form 3)File: CA Certificate SAI CRYSTAL GROUP.pdf | 11 Aug 2017 |
| Proforma of Allotment letterFile: Allotment letter.pdf | 7 Aug 2017 |
| Proforma of Allotment letterFile: RERA FORMAT CRYSTAL EMPIRE.pdf | 7 Aug 2017 |
| Layout approvalFile: LAY OUT PLAN.pdf | 2 Aug 2017 |
| Building plan approvalFile: BLDG PLAN1.pdf | 2 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: LAY OUT PLAN.pdf | 2 Aug 2017 |
| Building Plan Approval (IOD)File: BLDG PLAN1.pdf | 2 Aug 2017 |
| PAN CardFile: PAN.pdf | 1 Aug 2017 |
| Copy of the legal title reportFile: Binder1.pdf | 1 Aug 2017 |
| Details of encumbrancesFile: 001.pdf | 1 Aug 2017 |
| Declaration in FORM BFile: FORM 2.pdf | 1 Aug 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Binder1.pdf | 1 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: scan0005.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: scan0006.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: scan0008.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: scan0009.pdf | 31 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 43 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep CRYSTAL EMPIRE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nallasopara East3,200+ in Palghar
Filed coordinates, straight-line distance. 156 registered projects within 2 km.
MLDC YASHWANT ORCHID PHASE I
SAI RYDAM REALTORS PVT LTD
AV CRYSTAL PRESTIGE
RELIABLE HOUSING INDIA PRIVATE LIMITED
ARMAAN LOTUS
MANGAL ARJUN VARATHA
Redevelopement of Sagar Prakash Hsg Co-op Soc
TRIMURTI CONSTRUCTION
SANSKRUTI SAPPHIRE
SANSKRUTI BUILDER AND DEVELOPER
DEEP LANDMARK
ATHARVA ENTERPRISES
See every Palghar project, with the district possession charts
Builder: SAI CRYSTAL GROUP
SAI CRYSTAL GROUP has 1 registration on MahaRERA, including CRYSTAL EMPIRE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What does it mean that CRYSTAL EMPIRE shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if CRYSTAL EMPIRE is delayed beyond 30 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CRYSTAL EMPIRE?
The registered promoter entity is SAI CRYSTAL GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CRYSTAL EMPIRE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against CRYSTAL EMPIRE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for CRYSTAL EMPIRE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CRYSTAL EMPIRE?
The professionals named in the filing: Architect: SANJAY S NARANG; Engineer: Mukesh Kumar; Chartered Accountant: Anilkumar Parmar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CRYSTAL EMPIRE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback