ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Cove - Lake District - Phase II

Registration lapsed No litigation declared Residential / Group Housing project

Cove - Lake District - Phase II

By Lake District Realty Private Limited

RG-MH-20106 · RERA P52100005657 · Last updated on MahaRERA portal: 6 May 2022

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 43 months past the filed date
  • 14 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2023Possession promised43 months past this date
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 70%
14Complaints at MahaRERAon this registration
Jump to the 51 documents Report an error

Cove - Lake District - Phase II is a Residential / Group Housing project by Lake District Realty Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100005657 on 11 Aug 2017. Possession was promised by 30 Mar 2023 and is now 43 months past that date. 14 complaints are on record with the regulator.

At a glance

Project

  • NameCove - Lake District - Phase II
  • TypeResidential / Group Housing
  • Location
    • Yeolewadi
    • YAWALEWADI
    • Haveli
    • Pune
    • 411048
  • Pincode411048
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100005657
  • ReraGenie IDRG-MH-20106

Builder

  • NameLake District Realty Private Limited
  • Entity typeCompany
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

43 months past promisethis monthRegisteredAug 2017PromisedMar 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on11 Aug 2017
  • Promised completion30 Mar 2023
  • Revised completionNone
  • Buildings2 building records
  • Documents filed51 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Cove - Lake District - Phase II - A4NA200000
Cove - Lake District - Phase II - A5NA200000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 6 May 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 70%.

Cove - Lake District - Phase II - A46%
ActivityProgress
Excavation70%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Cove - Lake District - Phase II - A56%
ActivityProgress
Excavation70%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 6 May 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes40%
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes30%
Landscaping & Tree PlantingYes10%
Street LightingYes30%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%
Other Tennis court Children play area swimming poolYes100%

Parking filed146

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots146
Closed/Covered99
Open Space47
BuildingClosed/CoveredOpen SpaceTotal
Cove - Lake District - Phase II - A49824122
Cove - Lake District - Phase II - A512324

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,605 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Pune Kondhwa Realty Private LimitedMumbai CityMumbai City

Approvals and building plan

Permissible FSI26483.48
Proposed, not sanctioned16,981 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLaukik Apartments, Ground Floor, Plot No 3, CTS No 870, Bhandarkar Road, Pune - 411004, Maharashtra,

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLaxman Thite
EngineerS S Patane
PartnerRole in project
Lake District Realty Private Limited-

Complaints filed with MahaRERA14

Case no.ComplainantRespondentFiled
CC005000000010700Mr. Shrant GourLake District Realty Private Limited22/12/2017
CC005000000010702Ashish Kumar BothraLake District Realty Private Limited22/12/2017
CC005000000010705Amit Gupta through POA Holder Mr. Kailash Chandra GuptaPRA Realty Pvt. Ltd28/02/2018
CC005000000011713Ajit KumarLake District Realty Private Limited08/07/2018
CC005000000022744Devebbroto DeyLake District Realty Pvt Ltd18/03/2019
CC005000000258794RATANRAAO BHIMRAO HUDEDM/S. PUNE KONDHAVA REALTY PVT LTD. THROUGH ITS DIRECTOR RAJESH C. CHAULKAR30/04/2023
CC005000000106684Mr. Narendra BodhisatvaM/s. Pune Kondhwa Realty Pvt. Ltd.28/02/2022
CC005000000147180Chandramouli BasuM/s. Pune Kondhwa Realty Pvt. Ltd.23/06/2022
CC005000000177774Sandeep Subhash BafnaPune Kondhwa Realty Private Limited07/11/2022
CC005000000208218ZAKIR NISSAR DHARAMSEYPune Kondhwa Realty Private Limited03/02/2023
CC005000000238565Mr Vivek HebbalPune Kondhwa Realty Private Limited01/04/2023
CC005000000238668Mr Sachin Amol GaikwadPune Kondhwa Realty Private Limited18/04/2023
CC005000000269484Mr Terence Ozwald MenezesPune Kondhwa Realty Private Limited26/09/2023
CC12504440Preetam Atmaram BhosaleLake District Realty Private Limited13/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed51

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Building, A-6 ,A-7, A-4, A-5 Dated 14-10-2020_compressed.pdf6 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Building, A-6, A-7, A-4, A-5 Dated 11-01-2021_compressed.pdf6 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Building, A-6 ,A-7 ,A-4, A-5 Dated 15-04-2021_compressed.pdf6 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Building, A-6, A-7, A-4, A-5 Dated 12-07-2021_compressed.pdf6 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Building, A-6 ,A-7 ,A-4, A-5 Dated 15-01-2022_compressed.pdf6 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Building, A-6 ,A-7 ,A-4, A-5 Dated 12-04-2022_compressed.pdf6 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate A4-A5 Date 01-09-2020.pdf6 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate A4-A5 01-12-2020.pdf6 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate A4-A5 1-03-2021.pdf6 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate A4-A5 01-06-2021.pdf6 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate A4-A5 01-09-2021.pdf6 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate A4-A5 dated 1-12-2021.pdf6 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate A4-A5 Dated 01-03-2022.pdf6 May 2022
Certificates of CA (Form 3)File: CA certificate Ph-II 06-05-2022.pdf6 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5_RERA_A4 and A5_FY 19-20.pdf6 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_RERA_A4 and A5_FY 20-21.pdf6 May 2022
Certificates of CA (Form 5)File: Form 5 Phase II 31032018.pdf20 Jun 2019
Layout approvalFile: Sanctioned Layout Approval.pdf29 Jul 2017
Building plan approvalFile: Building Approval - C6, C7, A4 and A5 - 5.pdf29 Jul 2017
Building plan approvalFile: Building Approval - A4 and A5 - 2.pdf29 Jul 2017
Building plan approvalFile: Building Approval - A4 and A5 - 3.pdf29 Jul 2017
Building plan approvalFile: Building Approval - C6, C7, A4 and A5 - 4.pdf29 Jul 2017
Building plan approvalFile: Building Approval - A4 and A5 - 1.pdf29 Jul 2017
Copy of the legal title reportFile: Copy of Legal Title Report - Part-I.pdf29 Jul 2017
Copy of the legal title reportFile: Copy of Legal Title Report - Part-II.pdf29 Jul 2017
Details of encumbrancesFile: 8751-2016 Indenture of Mortgage Reliance -Part-1.pdf29 Jul 2017
Details of encumbrancesFile: 8751-2016 Indenture of Mortgage Reliance -Part-2.pdf29 Jul 2017
Details of encumbrancesFile: 8751-2016 Indenture of Mortgage Reliance -Part-3.pdf29 Jul 2017
Details of encumbrancesFile: 8751-2016 Indenture of Mortgage Reliance -Part-4.pdf29 Jul 2017
Details of encumbrancesFile: 8751-2016 Indenture of Mortgage Reliance -Part-5.pdf29 Jul 2017
Details of encumbrancesFile: 8751-2016 Indenture of Mortgage Reliance -Part-6.pdf29 Jul 2017
Details of encumbrancesFile: DTD part-1.pdf29 Jul 2017
Details of encumbrancesFile: DTD Part-2.pdf29 Jul 2017
Details of encumbrancesFile: DTD Part-3.pdf29 Jul 2017
Details of encumbrancesFile: DTD part-4.pdf29 Jul 2017
Details of encumbrancesFile: DTD part-5.pdf29 Jul 2017
Details of encumbrancesFile: DTD part-6.pdf29 Jul 2017
Details of encumbrancesFile: DTD part-7.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Sanctioned Layout Approval.pdf29 Jul 2017
Building Plan Approval (IOD)File: Building Approval - A4 and A5 - 1.pdf29 Jul 2017
Building Plan Approval (IOD)File: Building Approval - A4 and A5 - 2.pdf29 Jul 2017
Building Plan Approval (IOD)File: Building Approval - A4 and A5 - 3.pdf29 Jul 2017
Building Plan Approval (IOD)File: Building Approval - C6, C7, A4 and A5 - 4.pdf29 Jul 2017
Building Plan Approval (IOD)File: Building Approval - C6, C7, A4 and A5 - 5.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 2016.pdf29 Jul 2017
Declaration in FORM BFile: Form B - Promoter.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate by Architect - Form 1 - Phase II.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate by Engineer - Phase II.pdf29 Jul 2017
Certificates of CA (Form 3)File: Form 3 - CA Certificate - Phase II.pdf29 Jul 2017
Proforma of Allotment letterFile: Copy of Agreement for Sale.pdf29 Jul 2017
Proforma of Allotment letterFile: Declaration for Allotment Letter - Phase II.pdf29 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Cove - Lake District - Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Yeolewadi13,700+ in Pune

2 kmCove - Lake District - PCompleted 17Lapsed / revoked 12Other 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 37 registered projects within 2 km.

Builder: Lake District Realty Private Limited

Lake District Realty Private Limited has 2 registrations on MahaRERA, including Cove - Lake District - Phase I and Cove - Lake District - Phase II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Cove - Lake District - Phase II shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Cove - Lake District - Phase II is delayed beyond 30 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Cove - Lake District - Phase II?

The registered promoter entity is Lake District Realty Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Cove - Lake District - Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Cove - Lake District - Phase II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Cove - Lake District - Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Cove - Lake District - Phase II?

The professionals named in the filing: Architect: Laxman Thite; Engineer: S S Patane. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Cove - Lake District - Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Cove - Lake District - Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Cove - Lake District - Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.