CONTENDRE ENCLAVE

By Contendre Infratech Pvt. Ltd.

RG-MH-06714 · RERA P51800053218 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 5 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
May 2026Possession promised5 months past this date
8 of 11Construction stages donefurthest along: Basement (if any), 0%
25 of 30Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

CONTENDRE ENCLAVE is a Residential / Group Housing project by Contendre Infratech Pvt. Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800053218 on 23 Oct 2023. Possession was promised by 31 May 2026 and is now 5 months past that date. 5 of the 30 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameCONTENDRE ENCLAVE
  • TypeResidential / Group Housing
  • Location
    • NA
    • PLOT NO 9C
    • Nahur
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800053218
  • ReraGenie IDRG-MH-06714

Builder

  • NameContendre Infratech Pvt. Ltd.
  • Entity typeCompany
  • DirectorsNITA PARESH SHETH, PARESH MANILAL SHETH
  • Other registrations2 more →
  • Completed2 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

5 months past promisethis monthRegisteredOct 2023PromisedMay 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on23 Oct 2023
  • Promised completion31 May 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed68 files

Current status

17%5 of 30 units booked
84.2%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CONTENDRE ENCLAVENA131130030

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

CONTENDRE ENCLAVE: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed36

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots36
Closed/Covered36

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area820 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
Declared on1 Jul 2025
LandownerVillageDistrict
MANGALA PARK CO-OPERATIVE SOCIETY LIMITEDNahurMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2205.54
Proposed, not sanctioned2,206 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHANKARDHAN PLAZA,OPP MEHUL CINEMA,JUNCTION OF M M ROAD AND NAHUR ROADMULUND WESTMUMBAI-400 080
Estimated costRs 20.81 cr
Cost incurredRs 17.52 cr
Work done84.15%
BuildingWingEstimatedIncurred
-NARs 11.26 crRs 9.33 cr
CONTENDRE ENCLAVENARs 9.56 crRs 8.18 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR PASUNDARIA
EngineerJAGDISH SHAH
EngineerDattatraya Bhor
Chartered AccountantCA VIJAY SHAH
Chartered AccountantM T C & CO. LLP
PartnerRole in project
Contendre Infratech Pvt. Ltd.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Jan 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1_ DEC 25_ CONTENDRE ENCLAVE.pdf20 Apr 2026
Withdrawal Update Form 1File: FORM 1_ MARCH 26_ CONTENDRE ENCLAVE.pdf20 Apr 2026
Withdrawal Update Form 2File: FORM 2_ DEC 25_ CONTENDRE ENCLAVE.pdf20 Apr 2026
Withdrawal Update Form 2File: FORM 2_ MARCH 26_ CONTENDRE ENCLAVE.pdf20 Apr 2026
Withdrawal Update Form 3File: FORM 3_ DEC 25_ CONTENDRE ENCLAVE.pdf20 Apr 2026
Withdrawal Update Form 3File: FORM 3_ MARCH 26_ CONTENDRE ENCLAVE.pdf20 Apr 2026
Building plan approvalFile: REVISED PLANS.pdf2 Jan 2026
Building plan approvalFile: OC PLANS - CONTENDRE ENCLAVE.pdf2 Jan 2026
Building plan approvalFile: OC PLANS - CONTENDRE ENCLAVE.pdf2 Jan 2026
Form 5 (FY 2023-2024)File: MTC CO LLP FORM 5.pdf19 Dec 2025
Building plan approvalFile: PLAN CONTNDRE.pdf4 Dec 2025
Withdrawal Update Form 1File: FORM 1_ SEP 25_ CONTENDRE ENCLAVE.pdf25 Nov 2025
Withdrawal Update Form 2File: FORM 2_ SEP 25_ CONTENDRE ENCLAVE.pdf25 Nov 2025
Withdrawal Update Form 3File: FORM 3_ SEP 25_ CONTENDRE ENCLAVE.pdf25 Nov 2025
Form 2A (FY 2024-2025)File: FORM 2 A for FY 24-2025.pdf25 Nov 2025
Form 1File: FORM 1_ MARCH 25_ CONTENDRE ENCLAVE.pdf3 Oct 2025
Form 2File: FORM 2_ MARCH 25_ CONTENDRE ENCLAVE.pdf3 Oct 2025
Form 3File: FORM 3_ MARCH 25_ CONTENDRE ENCLAVE.pdf3 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ MARCH 25_ CONTENDRE ENCLAVE.pdf3 Oct 2025
Building plan approvalFile: OC PLANS_compressed.pdf1 Oct 2025
Withdrawal Update Form 1File: FORM 1_ JUNE 25_ CONTENDRE ENCLAVE.pdf1 Oct 2025
Withdrawal Update Form 2File: FORM 2_ JUNE 25_ CONTENDRE ENCLAVE.pdf1 Oct 2025
Withdrawal Update Form 3File: FORM 3_ JUNE 25_ CONTENDRE ENCLAVE.pdf1 Oct 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 A for FY 24-25.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ DEC 24.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ DEC 24.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ DEC 24.pdf3 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ DEC 24.pdf3 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5_ MARCH 24.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ SEP 24.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ SEP 24_compressed.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ SEP 24.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ SEP 24.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1_DEC 24.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 FORM 1_MARCH 24.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 FORM 1_JUNE 24.pdf6 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 FORM 2_DEC 24.pdf6 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 FORM 2_MARCH 24.pdf6 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 FORM 2_JUNE 24.pdf6 Aug 2024
Disclosure of sold/ booked inventoryFile: 10 SOLD UNSOLD_ DEC 2024.pdf6 Aug 2024
Disclosure of sold/ booked inventoryFile: 11 SOLD UNSOLD_ MARCH 24.pdf6 Aug 2024
Disclosure of sold/ booked inventoryFile: 12 SOLD UNSOLD_ JUNE 24.pdf6 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 FORM 3_DECEMBER 24.pdf6 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 FORM 3_MARCH 24.pdf6 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 FORM 3_ JUNE 24.pdf6 Aug 2024
Details of encumbrances concerned to FinanceFile: RERA Encumbrance.pdf14 Apr 2024
Details of encumbrances concerned to LegalFile: RERA Encumbrance.pdf14 Apr 2024
Layout approvalFile: PLAN.pdf13 Oct 2023
Building plan approvalFile: PLAN.pdf13 Oct 2023
Copy of Layout Approval (in case of layout)File: PLAN.pdf13 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN.pdf13 Oct 2023
Declaration about Commencement CertificateFile: cc declaration.pdf13 Oct 2023
Declaration in FORM BFile: FORM B.pdf9 Oct 2023
Copy of the legal title reportFile: TILE.pdf30 Sep 2023
PAN CardFile: 1 PAN Card.pdf15 Sep 2023
Details of encumbrances concerned to FinanceFile: 3 a Details of encumbrances concerned to Finance.pdf15 Sep 2023
Details of encumbrances concerned to FinanceFile: 4 b Details of encumbrances concerned to Legal.pdf15 Sep 2023
Details of encumbrances concerned to LegalFile: 3 a Details of encumbrances concerned to Finance.pdf15 Sep 2023
Details of encumbrances concerned to LegalFile: 4 b Details of encumbrances concerned to Legal.pdf15 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: cc print.pdf15 Sep 2023
CERSAI detailsFile: 12 CERSAI details.pdf15 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf15 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 14 Disclosure of Interest in Other Real Estate Organizations.pdf15 Sep 2023
Proforma of Agreement for saleFile: 15 Proforma of Agreement for sale.pdf15 Sep 2023
Proforma of Allotment letterFile: 16 Proforma of Allotment letter.pdf15 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 17 Separate Bank Account details including no encumbrances on the Bank Account or no escro15 Sep 2023
Deviation Report with respect to Allotment letterFile: 18 Deviation Report with respect to Allotment letter.pdf15 Sep 2023
Deviation Report with respect to model copy of AgreementFile: 19 Deviation Report with respect to model copy of Agreement.pdf15 Sep 2023

How this compares with Mumbai Suburban

17%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CONTENDRE ENCLAVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PLOT NO 9C6,700+ in Mumbai Suburban

Builder: Contendre Infratech Pvt. Ltd.

Contendre Infratech Pvt. Ltd. has 3 registrations on MahaRERA, including JIN YASH and CONTENDRE HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that CONTENDRE ENCLAVE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if CONTENDRE ENCLAVE is delayed beyond 31 May 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CONTENDRE ENCLAVE?

The registered promoter entity is Contendre Infratech Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CONTENDRE ENCLAVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CONTENDRE ENCLAVE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CONTENDRE ENCLAVE?

The professionals named in the filing: Architect: R PASUNDARIA; Engineer: JAGDISH SHAH; Engineer: Dattatraya Bhor; Chartered Accountant: CA VIJAY SHAH; Chartered Accountant: M T C & CO. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CONTENDRE ENCLAVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CONTENDRE ENCLAVE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CONTENDRE ENCLAVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.