Construction of MIG t/s on open plot on land bearing S.No.01 pt. on CTS No. 1/3 village kopari powai
By MHADA
RG-MH-18604 · RERA P51800077430 · Last updated on MahaRERA portal: 7 Mar 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Construction of MIG t/s on open plot on land bearing S.No.01 pt. on CTS No. 1/3 village kopari powai is a Residential / Group Housing project by MHADA in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800077430 on 16 Aug 2024. Possession was promised by 31 Dec 2025 and is now 10 months past that date.
At a glance
Project
- NameConstruction of MIG t/s on open plot on land bearing S.No.01 pt. on CTS No. 1/3 village kopari powai
- TypeResidential / Group Housing
- Location
- Adi shankaracharya marg
- Near Shipping corporation india
- opposite powai lake
- Kopari
- Kurla
- Mumbai Suburban
- 400076
- Pincode400076
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800077430
- ReraGenie IDRG-MH-18604
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on16 Aug 2024
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings7 building records
- Documents filed85 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BLDG NO 1A | NA | 20 | 0 | 0 | 0 | 0 |
| BLDG NO 1B | NA | 20 | 0 | 0 | 0 | 0 |
| BLDG NO 1C | NA | 20 | 0 | 0 | 0 | 0 |
| BLDG NO 1D | NA | 20 | 0 | 0 | 0 | 0 |
| BLDG NO 2A | NA | 20 | 0 | 0 | 0 | 0 |
| BLDG NO 3A | NA | 20 | 0 | 0 | 0 | 0 |
| BLDG NO 3B | NA | 20 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building7
As on 7 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
63 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.
BLDG NO 1A98%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
BLDG NO 1B98%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
BLDG NO 1C98%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
BLDG NO 1D98%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
BLDG NO 2A98%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
BLDG NO 3A98%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
BLDG NO 3B98%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 7 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed468
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BLDG NO 1A | 63 | 63 |
| BLDG NO 1B | 64 | 64 |
| BLDG NO 1C | 63 | 63 |
| BLDG NO 1D | 63 | 63 |
| BLDG NO 2A | 71 | 71 |
| BLDG NO 3A | 73 | 73 |
| BLDG NO 3B | 71 | 71 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NITIN A PATIL |
| Engineer | Y P KAJALE |
| Engineer | YOGESH P KAJALE |
| Chartered Accountant | M J RODRIGUES |
| Partner | Role in project |
|---|---|
| MHADA | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Aug 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Aug 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed85
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Kopari Powai Architect.pdf | 7 Mar 2026 |
| Withdrawal Update Form 1File: Kopari Powai Architect.pdf | 7 Mar 2026 |
| Withdrawal Update Form 2File: Quality Assurance.pdf | 7 Mar 2026 |
| Withdrawal Update Form 2File: Quality Assurance.pdf | 7 Mar 2026 |
| Withdrawal Update Form 3File: doc06220020260305112458-compressed.pdf | 7 Mar 2026 |
| Withdrawal Update Form 3File: doc06220020260305112458-compressed.pdf | 7 Mar 2026 |
| Withdrawal Update Form 1File: doc02494920240728134713.pdf | 18 Feb 2026 |
| Withdrawal Update Form 2File: Quality Assurance.pdf | 18 Feb 2026 |
| Withdrawal Update Form 3File: DocScanner Aug 13, 2024 10-23 AM (1).pdf | 18 Feb 2026 |
| Withdrawal Update Form 1File: doc02494920240728134713.pdf | 5 Feb 2026 |
| Withdrawal Update Form 1File: doc02494920240728134713.pdf | 5 Feb 2026 |
| Withdrawal Update Form 1File: doc02494920240728134713.pdf | 5 Feb 2026 |
| Withdrawal Update Form 2File: Quality Assurance.pdf | 5 Feb 2026 |
| Withdrawal Update Form 2File: Quality Assurance.pdf | 5 Feb 2026 |
| Withdrawal Update Form 2File: Quality Assurance.pdf | 5 Feb 2026 |
| Withdrawal Update Form 3File: DocScanner Aug 13, 2024 10-23 AM (1).pdf | 5 Feb 2026 |
| Withdrawal Update Form 3File: DocScanner Aug 13, 2024 10-23 AM (1).pdf | 5 Feb 2026 |
| Withdrawal Update Form 3File: DocScanner Aug 13, 2024 10-23 AM (1).pdf | 5 Feb 2026 |
| Form 1File: Kopari Powai Architect Certificate.pdf | 1 Dec 2025 |
| Form 2File: Kopari Powai Engineer Certificate.pdf | 1 Dec 2025 |
| Form 3File: Kopari Powai CA Form_compressed.pdf | 1 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Kopari Powai CA Form_compressed.pdf | 1 Dec 2025 |
| Building plan approval or NA orderFile: Engineer.pdf | 13 Aug 2025 |
| Building plan approval or NA orderFile: Architect.pdf | 13 Aug 2025 |
| Building plan approval or NA orderFile: CA_compressed.pdf | 13 Aug 2025 |
| Building plan approval or NA orderFile: CA_compressed.pdf | 13 Aug 2025 |
| Building plan approval or NA orderFile: Engineer.pdf | 13 Aug 2025 |
| Building plan approval or NA orderFile: Architect.pdf | 13 Aug 2025 |
| Form 1File: Architect.pdf | 13 Aug 2025 |
| Form 2File: Engineer.pdf | 13 Aug 2025 |
| Form 3File: CA_compressed.pdf | 13 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: CA_compressed.pdf | 13 Aug 2025 |
| Form 2A (FY 2024-2025)File: Form 2A.pdf | 13 Aug 2025 |
| Form 2A (FY 2025-2026)File: Form 2A (1).pdf | 13 Aug 2025 |
| Building plan approvalFile: Bldg no 3ab bs1.pdf | 8 Aug 2024 |
| Building plan approvalFile: Bldg no3ab floor plan.pdf | 8 Aug 2024 |
| Layout approvalFile: Ground stilt layout.pdf | 8 Aug 2024 |
| Layout approvalFile: basment 1 layout.pdf | 8 Aug 2024 |
| Layout approvalFile: Bldg 1AB BS12.pdf | 8 Aug 2024 |
| Building plan approvalFile: elevation mig 2.pdf | 8 Aug 2024 |
| Building plan approvalFile: Elevation 1.pdf | 8 Aug 2024 |
| Details of encumbrances concerned to FinanceFile: Non Encumbrance (1).pdf | 8 Aug 2024 |
| Details of encumbrances concerned to LegalFile: Non Encumbrance (1).pdf | 8 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: Ground stilt layout.pdf | 8 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: basment 1 layout.pdf | 8 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: Bldg 1AB BS12.pdf | 8 Aug 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Bldg no 3ab bs1.pdf | 8 Aug 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Bldg no3ab floor plan.pdf | 8 Aug 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: elevation mig 2.pdf | 8 Aug 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Elevation 1.pdf | 8 Aug 2024 |
| Other - TechnicalFile: order 50.pdf | 8 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: pdf.pdf | 7 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: doc02494920240728134713.pdf | 30 Jul 2024 |
| Deviation Report with respect to Allotment letterFile: 1 Proforma of Agreement for sale.pdf | 30 Jul 2024 |
| Deviation Report with respect to model copy of AgreementFile: 1 Proforma of Agreement for sale.pdf | 30 Jul 2024 |
| Layout approvalFile: layout 2.pdf | 29 Jul 2024 |
| Layout approvalFile: Layout 1.pdf | 29 Jul 2024 |
| Building plan approvalFile: floor plan bldg no 1ab_compressed (1).pdf | 29 Jul 2024 |
| Building plan approvalFile: Bldg no 1ab floor plan.pdf | 29 Jul 2024 |
| Building plan approvalFile: Bldg 1cd floor plan.pdf | 29 Jul 2024 |
| Building plan approvalFile: Bldg no 2a floor plan.pdf | 29 Jul 2024 |
| Layout approvalFile: kopari letter_compressed.pdf | 29 Jul 2024 |
| PAN CardFile: pan card.pdf | 29 Jul 2024 |
| Copy of the legal title reportFile: Land Title Certificate.pdf | 29 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: Non Encumbrance.pdf | 29 Jul 2024 |
| Details of encumbrances concerned to LegalFile: Non Encumbrance.pdf | 29 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: layout 2.pdf | 29 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: Layout 1.pdf | 29 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: kopari letter_compressed.pdf | 29 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: floor plan bldg no 1ab_compressed (1).pdf | 29 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Bldg no 1ab floor plan.pdf | 29 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Bldg 1cd floor plan.pdf | 29 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Bldg no 2a floor plan.pdf | 29 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 29 Jul 2024 |
| Declaration about Commencement CertificateFile: DocScanner Aug 13, 2024 2-59 PM.pdf | 29 Jul 2024 |
| Declaration in FORM BFile: Form B.pdf | 29 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Quality Assurance.pdf | 29 Jul 2024 |
| CERSAI detailsFile: Cersai Report.pdf | 29 Jul 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure Interest.pdf | 29 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DocScanner Aug 13, 2024 10-23 AM (1).pdf | 29 Jul 2024 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| TUNGWA POWAI | POWAI MUMBAI 400076 | 1,191 | Completed | Mar 2018 | Late, Mar 2019 |
| R-10 MANKHURD EWS AND LIG | S.NO. 138 CTS NO. 1 PMGP COLONY MANKHURD | 325 | Completed | Feb 2012 | Late, Jun 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 17 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 85 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Construction of MIG t/s on open plot on land on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Near Shipping corporation india, opposite powai lake6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 102 registered projects within 2 km.
EMPRESS HILL A B C and D Wings
HGP Community Pvt. Ltd.
MARS - WING - B
SUNCITY HOUSING
MARS- SUNCITY HOUSING PHASE II
SUNCITY HOUSING
MARS WING-C
Sun City Housing
SHREE KRISHNA Wing C,D and E
Shreem Properties
ISLE OF CALM TOWER 1
SUNRISE HOUSING
See every Mumbai Suburban project, with the district possession charts
Builder: MHADA
MHADA has 18 registrations on MahaRERA, including Ruby Mill and Bharat Mill. Its filings disclose 10 earlier MahaRERA projects: declares 2 of 10 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that Construction of MIG t/s on open plot on land bearing S.No.01 pt. on CTS No. 1/3 village kopari powai shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Construction of MIG t/s on open plot on land bearing S.No.01 pt. on CTS No. 1/3 village kopari powai is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Construction of MIG t/s on open plot on land bearing S.No.01 pt. on CTS No. 1/3 village kopari powai?
The registered promoter entity is MHADA, a public authority as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Construction of MIG t/s on open plot on land bearing S.No.01 pt. on CTS No. 1/3 village kopari powai?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Construction of MIG t/s on open plot on land bearing S.No.01 pt. on CTS No. 1/3 village kopari powai?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Construction of MIG t/s on open plot on land bearing S.No.01 pt. on CTS No. 1/3 village kopari powai?
The professionals named in the filing: Architect: NITIN A PATIL; Engineer: Y P KAJALE; Engineer: YOGESH P KAJALE; Chartered Accountant: M J RODRIGUES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Construction of MIG t/s on open plot on land bearing S.No.01 pt. on CTS No. 1/3 village kopari powai?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback