Home / Browse projects / Pune, Maharashtra / COLLINA CASA
COLLINA CASA
RG-MH-67465 · RERA P52100016688 · Last updated on MahaRERA portal: 2 Aug 2023
Source: official MahaRERA filing
Red flags
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
COLLINA CASA is a Residential / Group Housing project by Trinetra Enterprise in Pune, Maharashtra, registered with MahaRERA as P52100016688 on 5 Jun 2018. The registration is recorded completed; possession was promised by 30 Mar 2020.
At a glance
Project
- NameCOLLINA CASA
- TypeResidential / Group Housing
- Location
- Lulla Nagar
- Market Yard
- Haveli
- Pune
- 411048
- Pincode411048
- RERA no.P52100016688
- ReraGenie IDRG-MH-67465
Builder
- NameTrinetra Enterprise
- Entity typePartnership
- PartnersAtul Bhagat, Anjali Atul Bhagat
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on5 Jun 2018
- Promised completion30 Mar 2020
- Revised completionNone
- Buildings1 building record
- Documents filed106 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Collina Casa C Building | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 2 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 45%.
Collina Casa C Building: 47% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 4% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 14% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 45% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 14% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Progress on shared amenities15
As on 2 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed14
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Group Consultants |
| Engineer | Sandeep Shinde |
| Partner | Role in project |
|---|---|
| Trinetra Enterprise | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterProject delayed due to delay in Sanction of TDR and subsequent building permissions.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 May 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Jan 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jan 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 May 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed106
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 106 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 2023.pdf | 2 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CC-Form 2-June 23.pdf | 2 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: CC- Form 2A-June 23.pdf | 2 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CC-Form 1- 4-10-22.pdf | 30 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CC-Form 1- 4-12-22.pdf | 30 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: COLLINA CASA DEC 2022.pdf | 30 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CC-Form 1- 4-4-23.pdf | 30 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CC--Form 2- 4-10-22.pdf | 9 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CC-Form 2- 4-1-23 (1).pdf | 9 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CC-Form 2-4-4-23.pdf | 9 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: CC-Form 2A-4-10-22 (1).pdf | 9 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: CC-Form 2A-4-1-23.pdf | 9 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: CC-Form 2A-4-4-23.pdf | 9 May 2023 |
| Other - LegalFile: Clarification letter to MahaRERA.pdf | 26 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - 06-02-23.pdf | 6 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CC-Form2-Q2-2022.pdf | 13 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: CC- Form2A-Q2-2021.pdf | 13 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: CC-Form 2A-Q3-2021.pdf | 13 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: CC-Form 2A-Q4-2021.pdf | 13 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: CC-Form2A-Q1-2022.pdf | 13 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: CC-Form2A-Q2-2022.pdf | 13 Oct 2022 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Cert.pdf | 23 Jun 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert - September 2021.pdf | 23 Jun 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert - Dec 2021.pdf | 23 Jun 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert - March 2022.pdf | 23 Jun 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Arch Cert - Dec 2021.pdf | 23 Jun 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Architect Cert - Sep 2021.pdf | 23 Jun 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Cert - Sep 2021.pdf | 23 Jun 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert - December 2021.pdf | 23 Jun 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert - March 2022.pdf | 23 Jun 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert - Dec 2021.pdf | 23 Jun 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Cert - March 2022.pdf | 23 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - March 2019.pdf | 23 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - June 2019.pdf | 23 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - Sept 2019.pdf | 23 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - Dec 2019.pdf | 23 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - March 2020.pdf | 23 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - March 2020.pdf | 23 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - June 2020.pdf | 23 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Sept 2020.pdf | 23 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Dec 2020.pdf | 23 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - March 2021.pdf | 23 Jun 2022 |
| CERSAI detailsFile: Cersai Undertaking.pdf | 23 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Discolsure of Inventory.pdf | 23 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Certificates of CA (Form 5).pdf | 31 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - 19- 20.pdf | 31 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - 20-21.pdf | 31 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer cert -31-03-21.pdf | 17 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer cert -30-06-21.pdf | 17 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert March 2021.pdf | 13 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert - 7-7-21.pdf | 13 Aug 2021 |
| Certificates of CA (Form 3)File: CA cert Form 3 - 31-03-2021.pdf | 13 Aug 2021 |
| Certificates of CA (Form 3)File: CA cert Form 3 - 30-06-2021.pdf | 13 Aug 2021 |
| Certificates of CA (Form 3)File: CA Cert - 31-03-2021.pdf | 13 Aug 2021 |
| Certificates of CA (Form 3)File: CA cert - 30-06-2021.pdf | 13 Aug 2021 |
| Certificates of CA (Form 3)File: scan-Sep 20-compressed.pdf | 25 Feb 2021 |
| Certificates of CA (Form 3)File: scan-Dec 20-compressed.pdf | 25 Feb 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate.pdf | 15 Feb 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate.pdf | 15 Feb 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf | 7 Dec 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2020_11_30 1_52 PM Office Lens-compressed.pdf | 30 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch june_Optimize.pdf | 17 Sep 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Cert March 2020.pdf | 16 Sep 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's cert June 2020 (2).pdf | 16 Sep 2020 |
| Certificates of CA (Form 3)File: CA Cert March 2020.pdf | 16 Sep 2020 |
| Certificates of CA (Form 3)File: CA cert June 2020.pdf | 16 Sep 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert 31032020.pdf | 11 Sep 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA CERTIFICATE ARCHITECT.pdf | 10 Feb 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA CERTIFICATE ARCHITECT.pdf | 10 Feb 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate-1.pdf | 10 Feb 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate-1.pdf | 10 Feb 2020 |
| Certificates of CA (Form 5)File: CA Certificate_compressed.pdf | 10 Feb 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Dec19.pdf | 12 Dec 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Dec 19.pdf | 12 Dec 2019 |
| Certificates of CA (Form 3)File: FORM 3 Dec 19.pdf | 12 Dec 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2A June 2019.pdf | 8 Aug 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2A March 2019.pdf | 8 Aug 2019 |
| Certificates of CA (Form 3)File: Form 3 March 19.pdf | 8 Aug 2019 |
| Certificates of CA (Form 3)File: Form 3 June 2019.pdf | 8 Aug 2019 |
| Building plan approvalFile: Sanction Plan.pdf | 24 Jan 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 106 filed documents as one ZIP, foldered, with a manifest
Keep COLLINA CASA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Lulla Nagar13,700+ in Pune
Dwarikadham
Yashodhan Affordable Landmark LLP
UNITAS FASHION CENTER
UNITATIS DEVELOPMENTS PVT. LTD
Millennium Park
Xrbia Epoch Creations LLP
BABAR CLASSIC VISTA WING E, F, G
Classic Properties
JITO NAGAR
JAIN ASHAPURI DEVELOPER UNIT II
Wellwisher West Views
Bhansali Infrastructure LLP
Builder: Trinetra Enterprise
Trinetra Enterprise has 2 registrations on MahaRERA, including COLLINA CASA and GRAFIKON OPULENCE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if COLLINA CASA is delayed beyond 30 Mar 2020?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of COLLINA CASA?
The registered promoter entity is Trinetra Enterprise, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in COLLINA CASA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for COLLINA CASA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at COLLINA CASA?
The professionals named in the filing: Architect: Group Consultants; Engineer: Sandeep Shinde. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in COLLINA CASA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback