ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / COLLINA CASA

Completed No litigation declared Residential / Group Housing project

COLLINA CASA

By Trinetra Enterprise

RG-MH-67465 · RERA P52100016688 · Last updated on MahaRERA portal: 2 Aug 2023

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2020Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: Staircases, 45%
0Complaints at MahaRERAon this registration
Jump to the 106 documents Report an error

COLLINA CASA is a Residential / Group Housing project by Trinetra Enterprise in Pune, Maharashtra, registered with MahaRERA as P52100016688 on 5 Jun 2018. The registration is recorded completed; possession was promised by 30 Mar 2020.

At a glance

Project

  • NameCOLLINA CASA
  • TypeResidential / Group Housing
  • Location
    • Lulla Nagar
    • Market Yard
    • Haveli
    • Pune
    • 411048
  • Pincode411048
  • RERA no.P52100016688
  • ReraGenie IDRG-MH-67465

Builder

  • NameTrinetra Enterprise
  • Entity typePartnership
  • PartnersAtul Bhagat, Anjali Atul Bhagat
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredJun 2018PromisedMar 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Jun 2018
  • Promised completion30 Mar 2020
  • Revised completionNone
  • Buildings1 building record
  • Documents filed106 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Collina Casa C BuildingNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 45%.

Collina Casa C Building: 47% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure4%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises14%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks45%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.14%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 2 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed14

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots14
Closed/Covered10
Open Space4

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,821 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1974.21
Proposed, not sanctioned1,699 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSR NO 142/1, Hinjewadi IT Park Main Road, Pune 411057

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGroup Consultants
EngineerSandeep Shinde
PartnerRole in project
Trinetra Enterprise-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100001680Mar 2020 → Mar 2021

Reason as filed by the promoterProject delayed due to delay in Sanction of TDR and subsequent building permissions.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 May 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jan 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jan 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 May 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed106

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 106 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 2023.pdf2 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CC-Form 2-June 23.pdf2 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: CC- Form 2A-June 23.pdf2 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CC-Form 1- 4-10-22.pdf30 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CC-Form 1- 4-12-22.pdf30 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: COLLINA CASA DEC 2022.pdf30 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CC-Form 1- 4-4-23.pdf30 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CC--Form 2- 4-10-22.pdf9 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CC-Form 2- 4-1-23 (1).pdf9 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CC-Form 2-4-4-23.pdf9 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: CC-Form 2A-4-10-22 (1).pdf9 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: CC-Form 2A-4-1-23.pdf9 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: CC-Form 2A-4-4-23.pdf9 May 2023
Other - LegalFile: Clarification letter to MahaRERA.pdf26 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - 06-02-23.pdf6 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CC-Form2-Q2-2022.pdf13 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: CC- Form2A-Q2-2021.pdf13 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: CC-Form 2A-Q3-2021.pdf13 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: CC-Form 2A-Q4-2021.pdf13 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: CC-Form2A-Q1-2022.pdf13 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: CC-Form2A-Q2-2022.pdf13 Oct 2022
Declaration about Commencement CertificateFile: Declaration about Commencement Cert.pdf23 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert - September 2021.pdf23 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert - Dec 2021.pdf23 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert - March 2022.pdf23 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Arch Cert - Dec 2021.pdf23 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Architect Cert - Sep 2021.pdf23 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Cert - Sep 2021.pdf23 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert - December 2021.pdf23 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert - March 2022.pdf23 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert - Dec 2021.pdf23 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Cert - March 2022.pdf23 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - March 2019.pdf23 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - June 2019.pdf23 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - Sept 2019.pdf23 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - Dec 2019.pdf23 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - March 2020.pdf23 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - March 2020.pdf23 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - June 2020.pdf23 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Sept 2020.pdf23 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Dec 2020.pdf23 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - March 2021.pdf23 Jun 2022
CERSAI detailsFile: Cersai Undertaking.pdf23 Jun 2022
Disclosure of sold/ booked inventoryFile: Discolsure of Inventory.pdf23 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Certificates of CA (Form 5).pdf31 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - 19- 20.pdf31 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - 20-21.pdf31 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer cert -31-03-21.pdf17 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer cert -30-06-21.pdf17 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert March 2021.pdf13 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert - 7-7-21.pdf13 Aug 2021
Certificates of CA (Form 3)File: CA cert Form 3 - 31-03-2021.pdf13 Aug 2021
Certificates of CA (Form 3)File: CA cert Form 3 - 30-06-2021.pdf13 Aug 2021
Certificates of CA (Form 3)File: CA Cert - 31-03-2021.pdf13 Aug 2021
Certificates of CA (Form 3)File: CA cert - 30-06-2021.pdf13 Aug 2021
Certificates of CA (Form 3)File: scan-Sep 20-compressed.pdf25 Feb 2021
Certificates of CA (Form 3)File: scan-Dec 20-compressed.pdf25 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate.pdf15 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate.pdf15 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf7 Dec 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2020_11_30 1_52 PM Office Lens-compressed.pdf30 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch june_Optimize.pdf17 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Cert March 2020.pdf16 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's cert June 2020 (2).pdf16 Sep 2020
Certificates of CA (Form 3)File: CA Cert March 2020.pdf16 Sep 2020
Certificates of CA (Form 3)File: CA cert June 2020.pdf16 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert 31032020.pdf11 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA CERTIFICATE ARCHITECT.pdf10 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA CERTIFICATE ARCHITECT.pdf10 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate-1.pdf10 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate-1.pdf10 Feb 2020
Certificates of CA (Form 5)File: CA Certificate_compressed.pdf10 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Dec19.pdf12 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Dec 19.pdf12 Dec 2019
Certificates of CA (Form 3)File: FORM 3 Dec 19.pdf12 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2A June 2019.pdf8 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2A March 2019.pdf8 Aug 2019
Certificates of CA (Form 3)File: Form 3 March 19.pdf8 Aug 2019
Certificates of CA (Form 3)File: Form 3 June 2019.pdf8 Aug 2019
Building plan approvalFile: Sanction Plan.pdf24 Jan 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep COLLINA CASA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Lulla Nagar13,700+ in Pune

Builder: Trinetra Enterprise

Trinetra Enterprise has 2 registrations on MahaRERA, including COLLINA CASA and GRAFIKON OPULENCE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if COLLINA CASA is delayed beyond 30 Mar 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of COLLINA CASA?

The registered promoter entity is Trinetra Enterprise, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in COLLINA CASA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for COLLINA CASA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at COLLINA CASA?

The professionals named in the filing: Architect: Group Consultants; Engineer: Sandeep Shinde. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in COLLINA CASA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About COLLINA CASA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save COLLINA CASA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.