ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Clover Business Center

Registered No litigation declared Commercial project

Clover Business Center

By Clover Developers Pvt Ltd

RG-MH-80257 · RERA P52100055188 · Last updated on MahaRERA portal: 14 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken
  • Encumbrance declared on the project land, in favour of Dhiren Nandu
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 12 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 85%
56 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

Clover Business Center is a Commercial project by Clover Developers Pvt Ltd in Pune, Maharashtra, registered with MahaRERA as P52100055188 on 11 Mar 2024. Possession is promised by 31 Dec 2027. The completion date has moved by 12 months from the original filing. 0 of the 56 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameClover Business Center
  • TypeCommercial
  • Location
    • North Main Road
    • Mundhwa
    • Keshavnagar-Mundwa
    • Pune City
    • Pune
    • 411036
  • Pincode411036
  • RERA no.P52100055188
  • ReraGenie IDRG-MH-80257

Builder

  • NameClover Developers Pvt Ltd
  • Entity typeCompany
  • DirectorDHIREN POPATLAL NANDU
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2024First promiseDec 2026Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Mar 2024
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2026)
  • Buildings1 building record
  • Documents filed87 files

Current status

0%0 of 56 units booked
58.1%Work done, per cost certificate

Figures as on 14 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Clover Business CenterNA161105656

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 85%.

Clover Business Center: 69% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed668

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots668
Closed/Covered668

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,323 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofDhiren Nandu
CERSAI search filedYes
Declared on19 Aug 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI10913.89
Proposed, not sanctioned10,904 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMillennium Star Sasoon Road, Balkrishna Sakharam Dhole Patil Rd Pune Maharashtra 411001
Estimated costRs 80.00 cr
Cost incurredRs 46.51 cr
Work done58.14%
BuildingWingEstimatedIncurred
Clover Business CenterNARs 68.40 crRs 43.34 cr
-NARs 11.60 crRs 3.17 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRameshwari Sangani Sangani
EngineerShubhangi Harpale
EngineerStrudcom Consultant Pvt. Ltd
Chartered AccountantCA Manojkumar Agarwal
Chartered AccountantParam & Company Chartered Accountants
PartnerRole in project
Clover Developers Pvt Ltd-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA26062621556Dec 2026 → Dec 2027

Reason as filed by the promoterThe project could not be completed within the stipulated registration period due to delays encountered during the construction phase. Significant construction activities, including civil, finishing, infrastructure, and allied works, are still pending and require additional time for completion. Further, the project has not yet obtained the Occupancy Certificate (OC) from the competent authority, as the required construction and compliance-related works remain incomplete. Consequently, possession and handover of units to the allottees could not be undertaken within the approved timeline. We are

Litigation declared5

CaseCourtStatus
672/2010Civil Court Small Cause CourtPending for Ex Party
508/2013Civil Court Civil Judge Senior DivisionMatter is pending for Steps
14/2014Civil Court District Judge and Asst Session JudgeMatter is pending for dismissal order
P IX/I/2012/2012Maharashtra Recovery TribunalMatter is pending for Steps
P II/I/2016/2016Maharashtra Recovery TribunalMatter is Pending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Clover_Business_Center_Form1_Q1_2026-27_07-07-2026_10-57.pdf14 Jul 2026
Withdrawal Update Form 2File: FORM -2.pdf14 Jul 2026
Withdrawal Update Form 3File: Clover_Business_Center_Form3_Q1_2026-27_14-07-2026_10-03_doc1 (1)_compressed.pdf14 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A-2025-2026.pdf11 Jul 2026
Form 2A (FY 2024-2025)File: Form 2A-2024-2025.pdf11 Jul 2026
Withdrawal Update Form 1File: Form 1 - Clover Business Center as on Mar 26.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 - Clover Business Center as on Mar 26.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 - Clover Business Center as on Mar 26.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 - Clover Business Center as on December 2025.pdf25 Feb 2026
Withdrawal Update Form 2File: Form 2 - Clover Business Center as on December 2025.pdf25 Feb 2026
Withdrawal Update Form 3File: Form 3 - Clover Business Center as on Dec 2025.pdf25 Feb 2026
Withdrawal Update Form 1File: Form 1 - Clover Business Center as on Sep 2025.pdf20 Nov 2025
Withdrawal Update Form 2File: Form 2 - Clover Business Center as on Sep 2025.pdf20 Nov 2025
Withdrawal Update Form 3File: Form 3 - Clover Business Center as on Sep 2025.pdf20 Nov 2025
Building plan approvalFile: 1-6- Highlighted.pdf2 Sep 2025
Building plan approvalFile: 2-6.pdf2 Sep 2025
Building plan approvalFile: 3-6.pdf2 Sep 2025
Building plan approvalFile: 4-6.pdf2 Sep 2025
Building plan approvalFile: 5-6.pdf2 Sep 2025
Building plan approvalFile: 6-6.pdf2 Sep 2025
Form 1File: Form 1 - Clover Business Center as on June 2025.pdf20 Aug 2025
Form 2File: Form 2 - Clover Business Center as on June 2025.pdf20 Aug 2025
Form 3File: Form 3 - Clover Business Center as on June 2025.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Clover Business Center as on June 2025.pdf20 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf14 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2.pdf12 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_compressed (1).pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3.pdf11 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2.pdf16 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A.pdf16 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3.pdf16 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 5.pdf16 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Revised compressed.pdf28 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Diclosure of Interest In Other Real Estate Organization -RKB.pdf28 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest In Other Real Estate Organization - DPN.pdf28 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report with Respect to Agreement Draft_compressed.pdf22 Feb 2024
Other - LegalFile: Diclosure of Interest In Other Real Estate Organization -RKB.pdf22 Feb 2024
Other - LegalFile: Disclosure of Interest In Other Real Estate Organization - DPN.pdf22 Feb 2024
Other - LegalFile: Sale Deed Mundhwa Land 20221101_133151_073088 (1)_compressed-1-10.pdf22 Feb 2024
Other - LegalFile: Sale Deed Mundhwa Land 20221101_133151_073088 (1)_compressed-11-20.pdf22 Feb 2024
Other - LegalFile: Sale Deed Mundhwa Land 20221101_133151_073088 (1)_compressed-21-30.pdf22 Feb 2024
Other - LegalFile: Sale Deed Mundhwa Land 20221101_133151_073088 (1)_compressed-31-40.pdf22 Feb 2024
Other - LegalFile: Sale Deed Mundhwa Land 20221101_133151_073088 (1)_compressed-41-50.pdf22 Feb 2024
Other - LegalFile: Sale Deed Mundhwa Land 20221101_133151_073088 (1)_compressed-51-60.pdf22 Feb 2024
Other - LegalFile: Sale Deed Mundhwa Land 20221101_133151_073088 (1)_compressed-61-74.pdf22 Feb 2024
Details of encumbrances concerned to FinanceFile: Declaration of Financial Encumbrance.pdf7 Feb 2024
Details of encumbrances concerned to FinanceFile: Declaration of Financial Encumbrance.pdf7 Feb 2024
Details of encumbrances concerned to LegalFile: Declaration of Financial Encumbrance.pdf7 Feb 2024
Details of encumbrances concerned to LegalFile: Declaration of Financial Encumbrance.pdf7 Feb 2024
Proforma of Agreement for saleFile: Allotment Agreement Draft.pdf7 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf7 Feb 2024
Other - LegalFile: Declaration of Financial Encumbrance.pdf7 Feb 2024
Details of encumbrances concerned to FinanceFile: Self Declaration of Financial Encumbrance.pdf17 Jan 2024
Details of encumbrances concerned to LegalFile: Self Declaration of Financial Encumbrance.pdf17 Jan 2024
Copy of the legal title reportFile: Legal Title Report compressed.pdf16 Jan 2024
Details of encumbrances concerned to FinanceFile: Self Declaration Regarding Encumbrance.pdf4 Jan 2024
Details of encumbrances concerned to LegalFile: Self Declaration Regarding Encumbrance.pdf4 Jan 2024
Proforma of Allotment letterFile: Allotment Letter.pdf4 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC-0753-30-6-2023 (1).pdf13 Oct 2023
CERSAI detailsFile: Undertaking for Security Interest.pdf13 Oct 2023
Layout approvalFile: SHEET 1-5.pdf10 Oct 2023
Building plan approvalFile: SHEET 1-5.pdf10 Oct 2023
Building plan approvalFile: SHEET 2-5.pdf10 Oct 2023
Building plan approvalFile: SHEET 3-5.pdf10 Oct 2023
Building plan approvalFile: SHEET 4-5.pdf10 Oct 2023
Building plan approvalFile: SHEET 5-5.pdf10 Oct 2023
PAN CardFile: Clover Developers Pan.pdf10 Oct 2023
Copy of Layout Approval (in case of layout)File: SHEET 1-5.pdf10 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: SHEET 1-5.pdf10 Oct 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Clover HiglandsNibm road446CompletedMar 2007Mar 2007

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Clover Business Center on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mundhwa13,700+ in Pune

Builder: Clover Developers Pvt Ltd

Clover Developers Pvt Ltd has 2 registrations on MahaRERA, including CLOVER HIGHLANDS and Clover Business Center. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Clover Business Center is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Clover Business Center?

The registered promoter entity is Clover Developers Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Clover Business Center?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Clover Business Center?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Clover Business Center?

The professionals named in the filing: Architect: Rameshwari Sangani Sangani; Engineer: Shubhangi Harpale; Engineer: Strudcom Consultant Pvt. Ltd; Chartered Accountant: CA Manojkumar Agarwal; Chartered Accountant: Param & Company Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Clover Business Center?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Clover Business Center. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Clover Business Center to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.