Home / Browse projects / Pune, Maharashtra / CLASSIC GLORIA BUILDING B

Registration lapsed No litigation declared Others project

CLASSIC GLORIA BUILDING B

By CLASSIC PROPERTIES

RG-MH-57418 · RERA P52100053443 · Last updated on MahaRERA portal: 16 May 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
0 of 11Construction stages donefurthest along: Excavation, 0%
49 of 49Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

CLASSIC GLORIA BUILDING B is a Others project by CLASSIC PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100053443 on 1 Nov 2023. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 12 months from the original filing. 0 of the 49 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameCLASSIC GLORIA BUILDING B
  • TypeOthers
  • Location
    • -
    • KONDHWA BK
    • Haveli
    • Pune
    • 411048
  • Pincode411048
  • RERA no.P52100053443
  • ReraGenie IDRG-MH-57418

Builder

  • NameCLASSIC PROPERTIES
  • Entity typePartnership
  • PartnersSHAHISTA KADAR KHAN, AFZAL KADAR KHAN, NAFEES AFZAL KHAN, TABASSUM SHAHISTA KHAN
  • Other registrations3 more →
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

7 months past promisethis monthRegisteredNov 2023First promiseMar 2025Revised toMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Nov 2023
  • Promised completion31 Mar 2026
  • Revised completionRevised to 31 Mar 2026 (originally 31 Mar 2025)
  • Buildings1 building record
  • Documents filed92 files

Current status

0%0 of 49 units booked

Figures as on 16 May 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CLASSIC GLORIA BUILDING BNA54331649

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

CLASSIC GLORIA BUILDING B: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Closed/Covered10
Open Space30

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area285 sq m
Land owned byThe promoter
Named landownersNone
Declared on13 May 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI2706.75
Proposed, not sanctioned1,507 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAZAM CAMPUS

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSURAJ ABHANG
EngineerSHARAD MAHADEV PAWAR
Chartered AccountantSUNIL JATHIKE AND COMPANY
Chartered AccountantCA Sagar Mukund Inamdar
PartnerRole in project
CLASSIC PROPERTIES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA15052501129Mar 2025 → Mar 2026

Reason as filed by the promoterAs of now construction of the mentioned project is nearly completed and only few works such Plumbing, external plaster, Flooring etc. is pending for which we will be requiring additional time to complete the project and obtain the Full Occupancy Certificate from the local authority.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1_Architect Certificate_Dec 2023.pdf16 May 2025
Form 2File: Form 2_ENGINEERS CERTIFICATE_Dec 2023.pdf16 May 2025
Form 3File: Form 3_CA Certificate_Dec 2023.pdf16 May 2025
Disclosure of Sold and Booked InventoryFile: SOLD & UNSOLD_Dec 2023.pdf16 May 2025
Form 2A (FY 2023-2024)File: Site Supervisor's Certificate (31.12.2023)-15-05-2025_0001.pdf15 May 2025
Form 2A (FY 2024-2025)File: Site Supervisor's Certificate - 09-05-2025 2_0001.pdf14 May 2025
Form 5 (FY 2023-2024)File: Form 5_Annual Audit Report_2023-24.pdf14 May 2025
Form 5 (FY 2024-2025)File: Form 5_Annual Audit Report_2024-25.pdf14 May 2025
Form 1File: Architect Certificate_March 24.pdf13 May 2025
Form 2File: ENGINEERS CERTIFICATE_March 24.pdf13 May 2025
Form 3File: Form 3 B Building March 2024_0001_0001.pdf13 May 2025
Disclosure of Sold and Booked InventoryFile: SOLD_UNSOLD_March 24.pdf13 May 2025
Form 1File: ENGINEERS CERTIFICATE_March 24.pdf13 May 2025
Form 2File: Architect Certificate_March 24.pdf13 May 2025
Form 3File: SOLD_UNSOLD_March 24.pdf13 May 2025
Disclosure of Sold and Booked InventoryFile: Form 3 B Building March 2024_0001_0001.pdf13 May 2025
Form 1File: Architect Certificate_March 24.pdf13 May 2025
Form 2File: SOLD_UNSOLD_March 24.pdf13 May 2025
Form 3File: ENGINEERS CERTIFICATE_March 24.pdf13 May 2025
Disclosure of Sold and Booked InventoryFile: Form 3 B Building March 2024_0001_0001.pdf13 May 2025
Form 1File: Architect Certificate_March 24.pdf13 May 2025
Form 2File: ENGINEERS CERTIFICATE_March 24.pdf13 May 2025
Form 3File: SOLD_UNSOLD_March 24.pdf13 May 2025
Disclosure of Sold and Booked InventoryFile: Form 3 B Building March 2024_0001_0001.pdf13 May 2025
Form 1File: ENGINEERS CERTIFICATE_March 24.pdf13 May 2025
Form 2File: Form 3 B Building March 2024_0001_0001.pdf13 May 2025
Form 3File: Architect Certificate_March 24.pdf13 May 2025
Disclosure of Sold and Booked InventoryFile: SOLD_UNSOLD_March 24.pdf13 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Engineers Certificate_March 25.pdf12 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Site Supervisor's Certificate - 09-05-2025 2_0001.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_March 24.pdf10 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_June 24.pdf10 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Sept 24.pdf10 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Dec 24.pdf10 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_March 25.pdf10 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 March 2025.pdf10 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Annual Audit Report_2023-24.pdf10 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: Form 5_Annual Audit Report_2024-25.pdf10 May 2025
Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_March 25.pdf5 May 2025
Declaration in FORM BFile: Form B_Affidavit.pdf11 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ENGINEERS CERTIFICATE_March 24.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ENGINEERS CERTIFICATE_June 24.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 B Building March 2024_0001_0001.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 B Building June 2024_0001_0001.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 B Building Sept 2024_0001_0001.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 B Building Dec 2024_0001_0001.pdf8 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE_March 24.pdf8 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE_June 24.pdf8 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE_Sept 24.pdf8 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE_Dec 24.pdf8 Mar 2025
Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_March 24.pdf8 Mar 2025
Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_June 24.pdf8 Mar 2025
Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_Sept 24.pdf8 Mar 2025
Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_Dec 24.pdf8 Mar 2025
Proforma of Agreement for saleFile: CLASSIC AFS B (1).pdf27 Oct 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT OF DRAFT OF AGREEMENT FOR SALE.pdf27 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Nafees.pdf26 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: shahistakhan.pdf26 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: tabassum.pdf26 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: afzal.pdf26 Oct 2023
Building plan approvalFile: 1 (8).pdf20 Oct 2023
Building plan approvalFile: 2 (4).pdf20 Oct 2023
Building plan approvalFile: 6 (4).pdf20 Oct 2023
Building plan approvalFile: 7 (1).pdf20 Oct 2023
Building plan approvalFile: CLASSIC PROPERTIES.pdf20 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 (8).pdf20 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 2 (4).pdf20 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 6 (4).pdf20 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 7 (1).pdf20 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: CLASSIC PROPERTIES.pdf20 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: CLASSIC PROPERTIES - Declaration -Afzal Khan.pdf17 Oct 2023
Layout approvalFile: 1 Copy of Layout Approval (in case of layout) (6).pdf11 Oct 2023
Layout approvalFile: HPSC0879 compressed (1).pdf11 Oct 2023
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout) (6).pdf11 Oct 2023
Copy of Layout Approval (in case of layout)File: HPSC0879 compressed (1).pdf11 Oct 2023
Other - TechnicalFile: 1 Other - Legal (1).pdf9 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-BILDING B COMMERCIAL_compressed.pdf3 Oct 2023
Proforma of Allotment letterFile: ORIGINAL ALLOTMENT LETTER BUILDING B SCAN COPY_compressed.pdf3 Oct 2023
Copy of the legal title reportFile: Classic Gloria Search Report RERA format_compressed.pdf29 Sep 2023
Copy of the legal title reportFile: Search Report Pdf 15-04-2022-farida khan.pdf29 Sep 2023

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CLASSIC GLORIA BUILDING B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KONDHWA BK13,700+ in Pune

Builder: CLASSIC PROPERTIES

CLASSIC PROPERTIES has 4 registrations on MahaRERA, including CLASSIC GLORIA BUILDING A and CLASSIC GLORIA BUILDING B. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that CLASSIC GLORIA BUILDING B shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if CLASSIC GLORIA BUILDING B is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CLASSIC GLORIA BUILDING B?

The registered promoter entity is CLASSIC PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CLASSIC GLORIA BUILDING B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CLASSIC GLORIA BUILDING B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CLASSIC GLORIA BUILDING B?

The professionals named in the filing: Architect: SURAJ ABHANG; Engineer: SHARAD MAHADEV PAWAR; Chartered Accountant: SUNIL JATHIKE AND COMPANY; Chartered Accountant: CA Sagar Mukund Inamdar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CLASSIC GLORIA BUILDING B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CLASSIC GLORIA BUILDING B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CLASSIC GLORIA BUILDING B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.