Home / Browse projects / Aurangabad, Maharashtra / CHINTAMANI HILL VIEW II
CHINTAMANI HILL VIEW II
RG-MH-21852 · RERA P51500051154 · Last updated on MahaRERA portal: 22 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CHINTAMANI HILL VIEW II is a Residential / Group Housing project by VRUSHABH BUILDERS in Aurangabad, Maharashtra, registered with MahaRERA as P51500051154 on 1 Jun 2023. Possession is promised by 31 Dec 2026. 3 of the 27 units on this registration are recorded sold or booked, and 9 of 33 construction stages are filed complete.
At a glance
Project
- NameCHINTAMANI HILL VIEW II
- TypeResidential / Group Housing
- Location
- GUT NO.81 PART AT DEOLAI AURANGABAD
- AURANGABAD
- Satara (CT)
- 431001
- Pincode431001
- RERA no.P51500051154
- ReraGenie IDRG-MH-21852
Builder
- NameVRUSHABH BUILDERS
- Entity typePartnership
- PartnersRACHANA SHITAL KASLIWAL, ATUL SURESHCHAND KASLIWAL, MAHAVIR MOTILAL RAWKA, SHAILESH ZUMBERLAL RAWKA
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on1 Jun 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings3 building records
- Documents filed81 files
Current status
Figures as on 22 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A TYPE | NA | 2 | 2 | 17 | 0 | 17 |
| B TYPE | NA | 2 | 2 | 10 | 0 | 10 |
| C TYPE | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 22 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 90%.
A TYPE54%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B TYPE45%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 45% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 45% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
C TYPE0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 22 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 45% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 40% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 65% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
| Compound Wall Entrance Gate | Yes | 55% |
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| VARSHA LAXMAN HIWALE | Aurangabad (M Corp.) | Aurangabad |
| MEERABAI SANTOSH HIVALE | Aurangabad (M Corp.) | Aurangabad |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SAMIL ARCHITECT |
| Engineer | CORE CONSULTANT |
| Engineer | Samil Interiors |
| Chartered Accountant | YASH NAGAR |
| Partner | Role in project |
|---|---|
| VRUSHABH BUILDERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Apr 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Apr 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed81
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM 1 ARCHITECT CERTIFICATE-Q3 FY-25-26.pdf | 22 May 2026 |
| Form 2File: FORM 2 ENGINEERS CERTIFICATE-Q3 FY-25-26.pdf | 22 May 2026 |
| Form 3File: FORM 3 VRUSHABH BUILDERS Q3 FY 25-26.pdf | 22 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Q3-FY25-26.pdf | 22 May 2026 |
| Form 1File: FORM 1 ARCHITECT CERTIFICATE-Q4 FY-25-26.pdf | 22 May 2026 |
| Form 2File: FORM 2 ENGINEERS CERTIFICATE-Q4 FY-25-26.pdf | 22 May 2026 |
| Form 3File: FORM 3 VRUSHABH BUILDERS Q4 FY 25-26.pdf | 22 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Q4-FY25-26.pdf | 22 May 2026 |
| Form 1File: Form-1 Q2-Architect Certificate-Vrushabh Builders-Rera.pdf | 12 May 2026 |
| Form 2File: Form-2 Q2-Engineers Certificate-Vrushabh Builders-Rera.pdf | 12 May 2026 |
| Form 3File: Form-3 Q-1 Vrushabh Builders-Rera.pdf | 12 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory-Vrushabh-JUNE-25 - Rera.pdf | 12 May 2026 |
| Form 1File: Form-1 Q2-Architect Certificate-Vrushabh Builders-Rera.pdf | 12 May 2026 |
| Form 2File: Form-2 Q2-Engineers Certificate-Vrushabh Builders-Rera.pdf | 12 May 2026 |
| Form 3File: Form-3 Q-2 Vrushabh Builders-Rera.pdf | 12 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory-Vrushabh-SEP-25 - Rera.pdf | 12 May 2026 |
| Form 1File: FORM 1 ARCHITECT CERTIFICATE VRUSHABH BUILDERS Q3 FY 24-25.pdf | 16 Jun 2025 |
| Form 2File: FORM 2 ENGINNEERS CERTIFICATE VRUSHABH BUILDERS Q3 FY 24-25.pdf | 16 Jun 2025 |
| Form 3File: Form 3 2024-25 Q4 Sign.pdf | 16 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory-Vrushabh-DEC-24 - Rera.pdf | 16 Jun 2025 |
| Form 1File: Form 1 2024-25 Q4 Vrush.pdf | 16 Jun 2025 |
| Form 2File: Form 2 2024-25 Q4 Vrush.pdf | 16 Jun 2025 |
| Form 3File: Form 3 2024-25 Q4 Sign.pdf | 16 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory-Vrushabh-MAR-25 - Rera.pdf | 16 Jun 2025 |
| Form 1 2024-25 Q4 Vrush | 29 Apr 2025 |
| Form 2 2024-25 Q4 Vrush | 29 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory-Vrushabh-DEC-24 - Rera.pdf | 29 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory-Vrushabh-MAR-25 - Rera.pdf | 29 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE VRUSHABH BUILDERS-300924.pdf | 21 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_2024-25_Q1_Vrushbha.pdf | 21 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_2024-25_Q2_Vrushbh.pdf | 21 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE VRUSHABH BUILDERS-300924.pdf | 21 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTERY VRUSHABH BUILDERS Q2 FY 24-25_0001.pdf | 21 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT CERTIFICATE-VRUSHABH Q1 FY2425.pdf | 9 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEERS CERTIFICATE-VRUSHABH Q1 FY2425.pdf | 9 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTERY VB Q1 FY2425.pdf | 9 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 VRUSHABH BUILDERS FY23-24.pdf | 18 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 VRUSHABH-300623.pdf | 30 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 VRUSHABH-300923.pdf | 30 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 3 VRUHABH-311223.pdf | 30 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 VRUSHABH-311223.pdf | 30 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 VRUSHABH-310324.pdf | 30 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 VRUSHABH-300623.pdf | 30 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 VRUSHABH-300923.pdf | 30 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 VRUSHABH-311223.pdf | 30 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 VRUSHABH-310324.pdf | 30 May 2024 |
| Disclosure of sold/ booked inventoryFile: VRUSHABH SOLD UNSOLD INVENTORY Q1 FY23-24.pdf | 30 May 2024 |
| Disclosure of sold/ booked inventoryFile: VRUSHABH SOLD UNSOLD INVENTORY Q2 FY23-24.pdf | 30 May 2024 |
| Disclosure of sold/ booked inventoryFile: VRUSHABH SOLD UNSOLD INVENTORY Q3 FY23-24.pdf | 30 May 2024 |
| Disclosure of sold/ booked inventoryFile: VRUSHABH SOLD UNSOLD INVENTORY Q4 FY23-24.pdf | 30 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VRUHABH-300623.pdf | 30 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VRUHABH-300923.pdf | 30 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VRUHABH-311223.pdf | 30 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VRUHABH-310324.pdf | 30 May 2024 |
| CERSAI detailsFile: 2 CERSAI New details_pages-to-jpg-0001.pdf | 24 May 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200269129540_For_Asset_Based_Search_19_05_2023_16_13_30_504.pdf | 19 May 2023 |
| Copy of the legal title reportFile: Search Report.pdf | 18 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_.pdf | 10 May 2023 |
| Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf | 8 Apr 2023 |
| Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf | 8 Apr 2023 |
| Building plan approvalFile: 2 Building Plan Approval _ NA Order for plotted development.pdf | 8 Apr 2023 |
| Building plan approvalFile: 3 Building Plan Approval _ NA Order for plotted development.pdf | 8 Apr 2023 |
| Building plan approvalFile: 4 Building Plan Approval _ NA Order for plotted development.pdf | 8 Apr 2023 |
| PAN CardFile: 1 PAN Card.pdf | 8 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf | 8 Apr 2023 |
| Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance.pdf | 8 Apr 2023 |
| Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf | 8 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf | 8 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 Building Plan Approval _ NA Order for plotted development.pdf | 8 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 3 Building Plan Approval _ NA Order for plotted development.pdf | 8 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 4 Building Plan Approval _ NA Order for plotted development.pdf | 8 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development.pdf | 8 Apr 2023 |
| Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate.pdf | 8 Apr 2023 |
| Declaration in FORM BFile: 1 Declaration in FORM B.pdf | 8 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: 1 Disclosure of sold_ booked inventory.pdf | 8 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 11zon_merged-PDF.pdf | 8 Apr 2023 |
| Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf | 8 Apr 2023 |
| Proforma of Allotment letterFile: 1 Proforma of Allotment letter.pdf | 8 Apr 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow | 8 Apr 2023 |
| Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter.pdf | 8 Apr 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 81 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep CHINTAMANI HILL VIEW II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near AURANGABAD1,400+ in Aurangabad
Capital Trade Centre
KRK Landmark LLP
AQ TOWN
AQ INFRASTRUCTURE PRIVATE LIMITED
KALYANI SAI VISHWA
RAJASHREE UDYOG
AMRUT SAI PLAZA PH 2
Shree Amrut Sai Developer Pvt.Ltd
PRASSANA HIGH CLASS CITY PHASE - I
SHRI KRISHNA NAGAR SAHAKARI GRAH NIRMAN SA
SHRIRAM RESIDENCY
UNIQUE BUILDCON
See every Aurangabad project, with the district possession charts
Builder: VRUSHABH BUILDERS
VRUSHABH BUILDERS has 1 registration on MahaRERA, including CHINTAMANI HILL VIEW II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What are my rights if CHINTAMANI HILL VIEW II is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CHINTAMANI HILL VIEW II?
The registered promoter entity is VRUSHABH BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CHINTAMANI HILL VIEW II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for CHINTAMANI HILL VIEW II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CHINTAMANI HILL VIEW II?
The professionals named in the filing: Architect: SAMIL ARCHITECT; Engineer: CORE CONSULTANT; Engineer: Samil Interiors; Chartered Accountant: YASH NAGAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CHINTAMANI HILL VIEW II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback