Home / Browse projects / Pune, Maharashtra / CHINMAY AVENUE

Registered No litigation declared Others project

CHINMAY AVENUE

By CHINMAY AVENUE

RG-MH-30880 · RERA P52100079218 · Last updated on MahaRERA portal: 13 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 70%
53 of 53Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

CHINMAY AVENUE is a Others project by CHINMAY AVENUE in Pune, Maharashtra, registered with MahaRERA as P52100079218 on 17 Feb 2025. Possession is promised by 31 Dec 2027. 0 of the 53 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameCHINMAY AVENUE
  • TypeOthers
  • Location
    • KONDHWA BK
    • KONDHAWA BK
    • Haveli
    • Pune
    • 411048
  • Pincode411048
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100079218
  • ReraGenie IDRG-MH-30880

Builder

  • NameCHINMAY AVENUE
  • Entity typePartnership
  • PartnersCHINMAY VIKAS DHERE, VIKAS MADHUKAR DHERE, VAISHALI VIKAS DHERE

Key dates

this monthRegisteredFeb 2025PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Feb 2025
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed82 files

Current status

0%0 of 53 units booked
25.6%Work done, per cost certificate

Figures as on 13 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CHINMAY AVENUENA121050353

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 70%.

CHINMAY AVENUE: 34% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed119

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots119
Closed/Covered119

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,651 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Jun 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation (PMC)
Permissible FSI5170.21
Proposed, not sanctioned5,170 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD.S NO.571/CRYSTAL ROOMNEAR SURYAPRABHA GARDENKENJALE NAGAR,BIBVEWADI - KONDHWA,
Estimated costRs 18.00 cr
Cost incurredRs 4.60 cr
Work done25.56%
BuildingWingEstimatedIncurred
CHINMAY AVENUENARs 16.20 crRs 4.36 cr
-NARs 1.80 crRs 24.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVikas M Dhere
EngineerSANKET BIDVE
Chartered AccountantASHISH S OSWAL & CO
Chartered AccountantSajan Bogawat & Associates
PartnerRole in project
CHINMAY AVENUE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jan 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_ Q4 Arch letter.pdf13 May 2026
Withdrawal Update Form 2File: Form 2_Q4.pdf13 May 2026
Withdrawal Update Form 3File: Form 3_Q4 Chinmay Avenue.pdf13 May 2026
Form 2A (FY 2024-2025)File: Form 2A_Chinmay Avenue_March 2025.pdf17 Mar 2026
Building plan approvalFile: plan 1.pdf31 Jan 2026
Building plan approvalFile: plan 2.pdf31 Jan 2026
Building plan approvalFile: plan 3.pdf31 Jan 2026
Building plan approvalFile: plan 4.pdf31 Jan 2026
Building plan approvalFile: plan 5.pdf31 Jan 2026
Declaration and undertaking (Annexure A)File: Declaration About CC.pdf31 Jan 2026
Withdrawal Update Form 1File: Form 1_25-26 Q3.pdf29 Jan 2026
Withdrawal Update Form 2File: Form 2_25-26 Q3.pdf29 Jan 2026
Withdrawal Update Form 3File: Chinmay Avenue_Form 3 Q3.pdf29 Jan 2026
Form 5 (FY 2024-2025)File: Chinmay_Form 5_F Y 2024-25.pdf20 Dec 2025
Withdrawal Update Form 1File: CHINMAY AVENUE - FORM 1.pdf19 Dec 2025
Withdrawal Update Form 2File: CHINMAY AVENUE - FORM 2.pdf19 Dec 2025
Withdrawal Update Form 3File: Chinmay_Form 3_25-26- Q2.pdf19 Dec 2025
Building plan approvalFile: Basement & Ground Floor (1)_11zon.pdf19 Aug 2025
Building plan approvalFile: 1st & 2nd Floor_11zon.pdf19 Aug 2025
Building plan approvalFile: 3rd,4th,5th & 6th Floor_11zon.pdf19 Aug 2025
Building plan approvalFile: Terrace Floor_11zon.pdf19 Aug 2025
Declaration and undertaking (Annexure A)File: Declaration about CC (1).pdf19 Aug 2025
Withdrawal Update Form 1File: Form 1_Chinmay Q1.pdf15 Jul 2025
Withdrawal Update Form 2File: FORM 2_Q1.pdf15 Jul 2025
Withdrawal Update Form 3File: Form 3_Chinmay Q1.pdf15 Jul 2025
Form 1File: Form 1_Q4.pdf8 Jul 2025
Form 2File: Form 2_Q4.pdf8 Jul 2025
Form 3File: Form 3_Q4.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold_Q4.pdf8 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chinmay Avenue Form3.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 with letterhead.pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AVENUE FINAL.pdf3 Feb 2025
Other - TechnicalFile: CC VERIFICATION SCREENSHOT.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FINAL CHINMAY.pdf24 Jan 2025
Other - TechnicalFile: REPLY TO QUERY 2412025.pdf24 Jan 2025
Other - LegalFile: REPLY TO QUERY.pdf16 Jan 2025
Proforma of Agreement for saleFile: agreement to sale_Final 160125.pdf16 Jan 2025
Other - TechnicalFile: Appendix F_Ack.pdf8 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Appendix F_Ack.pdf7 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: appendix f.pdf1 Jan 2025
Other - LegalFile: Satbara.pdf1 Jan 2025
Other - LegalFile: chinmay avenue agriment-8.pdf1 Jan 2025
Other - LegalFile: chinmay avenue agriment-6_11zon.pdf1 Jan 2025
Other - LegalFile: chinmay avenue agriment-5.pdf1 Jan 2025
Other - LegalFile: chinmay avenue agriment-4_11zon.pdf1 Jan 2025
Other - LegalFile: chinmay avenue agriment-3_11zon.pdf1 Jan 2025
Other - LegalFile: chinmay avenue agriment-2_11zon.pdf1 Jan 2025
Other - LegalFile: chinmay avenue agriment-1.pdf1 Jan 2025
Other - LegalFile: chinmay avenue agriment-7_11zon.pdf1 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: VERIFICATION OF CC EMAIL.pdf26 Dec 2024
Other - TechnicalFile: 11zon_JPEG-to-PDF (3).pdf26 Dec 2024
Layout approvalFile: Sanctione Plan 1.pdf24 Dec 2024
Building plan approvalFile: Sanctioned Plan 2.pdf24 Dec 2024
Building plan approvalFile: Sanctioned Plan 3.pdf24 Dec 2024
Building plan approvalFile: Sanctioned Plan 4.pdf24 Dec 2024
Copy of Layout Approval (in case of layout)File: Sanctione Plan 1.pdf24 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: CC (2).pdf24 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan 2.pdf24 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan 3.pdf24 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan 4.pdf24 Dec 2024
Other - TechnicalFile: 3 Other - Legal.pdf24 Dec 2024
Copy of the legal title reportFile: ilovepdf_merged.pdf23 Dec 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL.pdf23 Dec 2024
PAN CardFile: CHINMAY AVENU.pdf20 Dec 2024
Details of encumbrances concerned to FinanceFile: Non-encumbrance.pdf20 Dec 2024
Declaration in FORM BFile: FORM B CHINMAY.pdf20 Dec 2024
Other - LegalFile: Discloure related to single project land.pdf20 Dec 2024
Other - LegalFile: Authority Letter.pdf20 Dec 2024
Other - LegalFile: Undertaking of No charge.pdf20 Dec 2024
Declaration about Commencement CertificateFile: Declaration of Comencement.pdf20 Dec 2024
CERSAI detailsFile: Self Declaration of non-creation of intereset.pdf20 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Bank.pdf20 Dec 2024
Deviation Report with respect to Allotment letterFile: Deviation_Allotment.pdf20 Dec 2024
Details of encumbrances concerned to LegalFile: Non-encumbrance.pdf20 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Deviation_Agreement.pdf20 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_Vikas.pdf20 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_Vaishali.pdf20 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Int_Chinmay.pdf20 Dec 2024

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CHINMAY AVENUE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KONDHAWA BK13,700+ in Pune

2 kmCHINMAY AVENUECompleted 89Lapsed / revoked 42Other 100Dot size: filed unitsN

Filed coordinates, straight-line distance. 231 registered projects within 2 km.

Builder: CHINMAY AVENUE

CHINMAY AVENUE has 1 registration on MahaRERA, including CHINMAY AVENUE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if CHINMAY AVENUE is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CHINMAY AVENUE?

The registered promoter entity is CHINMAY AVENUE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CHINMAY AVENUE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CHINMAY AVENUE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CHINMAY AVENUE?

The professionals named in the filing: Architect: Vikas M Dhere; Engineer: SANKET BIDVE; Chartered Accountant: ASHISH S OSWAL & CO; Chartered Accountant: Sajan Bogawat & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CHINMAY AVENUE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CHINMAY AVENUE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CHINMAY AVENUE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.