Home / Browse projects / Thane, Maharashtra / Chandraprabhakar Co-operative Housing Society Limited

Completed No litigation declared Residential / Group Housing project

Chandraprabhakar Co-operative Housing Society Limited

By Mellennium Homes

RG-MH-82713 · RERA P51700048538 · Last updated on MahaRERA portal: 25 Feb 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Apr 2025Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 90%
14 of 26Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

Chandraprabhakar Co-operative Housing Society Limited is a Residential / Group Housing project by Mellennium Homes in Thane, Maharashtra, registered with MahaRERA as P51700048538 on 6 Jan 2023. The registration is recorded completed; possession was promised by 30 Apr 2025. 12 of the 26 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameChandraprabhakar Co-operative Housing Society Limited
  • TypeResidential / Group Housing
  • Location
    • M.P. Road
    • Garibcha wada Dombivli west
    • DOMBIVLI
    • Kalyan
    • Thane
    • 421202
  • Pincode421202
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700048538
  • ReraGenie IDRG-MH-82713

Builder

  • NameMellennium Homes
  • Entity typePartnership
  • PartnersPrashant Ashok Rakhade, Anil Prakash Bhoir, Mehul Sunil Gambhirrao

Key dates

this monthRegisteredJan 2023PromisedApr 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on6 Jan 2023
  • Promised completion30 Apr 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed87 files

Current status

46%12 of 26 units booked

Figures as on 25 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Chandraprabhakar Co-Operative Housing Society LimitedNA8822426

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

Chandraprabhakar Co-Operative Housing Society Limited: 87% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 25 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed52

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots52
Closed/Covered52

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area391 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Declared on16 Sep 2024
LandownerVillageDistrict
Chandraprabhakar Co-Op Housing Society LTDDOMBIVLIThane

Approvals and building plan

Sanctioning authorityKalyan Dombivali Municipal Corporation
Permissible FSI1534.97
Proposed, not sanctioned1,527 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDombivli west 421202

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRachana Shilp
EngineerRajesh Thakare and associates
EngineerTejas Deshmukh
Chartered AccountantKapure & Kapure
Chartered AccountantNAVAL KARNIK & CO.
PartnerRole in project
Mellennium Homes-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 May 2025

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form 2A - Chandraprabhakar.pdf25 Feb 2026
Form 5 (FY 2024-2025)File: Mellenium Homes - March 25.pdf11 Dec 2025
Form 1File: Mellenium Homes - Form 1.pdf2 Sep 2025
Form 2File: Form 2.pdf2 Sep 2025
Form 3File: Signed form 3 - Mellenium Home - Ap25_compressed.pdf2 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - April 25.pdf2 Sep 2025
Form 1File: Form 1 - Mellenium Homes - March 25.pdf2 Sep 2025
Form 2File: Form 2.pdf2 Sep 2025
Form 3File: Signed Form 3 - Mellenium Homes - March 25_compressed.pdf2 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - Mellenium Home.pdf2 Sep 2025
Form 1File: Mellenium Homes - Form 1.pdf2 Sep 2025
Form 2File: Form 2.pdf2 Sep 2025
Form 3File: Form 3 - Homes_compressed.pdf2 Sep 2025
Disclosure of Sold and Booked InventoryFile: Mellenium Homes - Disclosure.pdf2 Sep 2025
Form 1File: Mellennium Homes - Arch Sep - 2024.pdf2 Sep 2025
Form 2File: Mellennium Homes - Engg Sep - 2024.pdf2 Sep 2025
Form 3File: Mellenium Homes - Form 3_compressed.pdf2 Sep 2025
Disclosure of Sold and Booked InventoryFile: Mellennium Homes - Disclosure Sept 2024.pdf2 Sep 2025
Form 1File: Form 1.pdf2 Sep 2025
Form 2File: Form 2.pdf2 Sep 2025
Form 3File: Mellenium Homes_compressed.pdf2 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure June 24 - Mellennium Homes.pdf2 Sep 2025
Form 1File: Arch Mellennium Homes 05-04-24.pdf2 Sep 2025
Form 2File: Mellennium Homes - Engg Cert Mar-24.pdf2 Sep 2025
Form 3File: Mellenium Homes - Signed Form 3_compressed.pdf2 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Mar-24 - Mellennium Homes.pdf2 Sep 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Chandraprabha OC.pdf6 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Mellenium Homes - March 25.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 - Mellenium Homes - March 25_compressed.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure - Mellenium Home.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mellenium Homes - Form 1.pdf19 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Homes_compressed.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Jan 2025
Disclosure of sold/ booked inventoryFile: Mellenium Homes - Disclosure.pdf19 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Mellennium Homes.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mellennium Homes - Arch Sep - 2024.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mellenium Homes - Form 3_compressed.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mellennium Homes - Engg Sep - 2024.pdf20 Oct 2024
Disclosure of sold/ booked inventoryFile: Mellennium Homes - Disclosure Sept 2024.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure June 24 - Mellennium Homes.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mellenium Homes_compressed.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assuarance - Mellennium Homes - 2024.pdf14 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Mellennium Homes 05-04-24.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mellennium Homes - Engg Cert Mar-24.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure Mar-24 - Mellennium Homes.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mellenium Homes - Signed Form 3_compressed.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Chandraprabhakar Engg Cert Dec 2023.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: Mellennium Homes Flat Inventory.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Chandraprabhakar Dec 23.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Chandraprabhakar Dec ArchCert.pdf14 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Mellennium Homes - Quality Assuarance.pdf23 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 Mellennium Homes Sep 23_compressed.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mellennium Homes - Architect.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Chandraprabhakar - Engg.pdf17 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Mellenium Homes Form 5.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar - Mellennium Homes - March.pdf21 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar - Mellennium Homes- June.pdf21 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mellennium Homes - March.pdf21 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mellennium Homes - June.pdf21 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Chandraprabhakar Mar 23_compressed.pdf21 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Chandraprabhakar Jun 23_compressed.pdf21 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_281222_compressed.pdf28 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration for seprate bank acc.pdf28 Dec 2022
Proforma of Agreement for saleFile: Agreement for Sale-RERA revised.pdf6 Dec 2022
Proforma of Allotment letterFile: Allotment letter-1-4_compressed.pdf5 Dec 2022
Proforma of Allotment letterFile: Allotment letter-5-8_compressed.pdf5 Dec 2022
Deviation Report with respect to Allotment letterFile: Deviation allotment.pdf5 Dec 2022
Deviation Report with respect to model copy of AgreementFile: Deviation agreement.pdf5 Dec 2022
Layout approvalFile: PLAN.pdf2 Dec 2022
Building plan approvalFile: PLAN.pdf2 Dec 2022
PAN CardFile: Pan card.pdf2 Dec 2022
Copy of the legal title reportFile: Title-Chandraprabhakar.pdf2 Dec 2022
Details of encumbrances concerned to FinanceFile: DEclaration for Finance.pdf2 Dec 2022
Details of encumbrances concerned to FinanceFile: Declaration for legal.pdf2 Dec 2022
Details of encumbrances concerned to LegalFile: DEclaration for Finance.pdf2 Dec 2022
Details of encumbrances concerned to LegalFile: Declaration for legal.pdf2 Dec 2022
Copy of Layout Approval (in case of layout)File: PLAN.pdf2 Dec 2022

How this compares with Thane

46%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Chandraprabhakar Co-operative Housing Societ on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Garibcha wada Dombivli west7,600+ in Thane

2 kmChandraprabhakar Co-operCompleted 42Lapsed / revoked 38Other 67Dot size: filed unitsN

Filed coordinates, straight-line distance. 147 registered projects within 2 km.

Builder: Mellennium Homes

Mellennium Homes has 1 registration on MahaRERA, including Chandraprabhakar Co-operative Housing Society Limited. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Chandraprabhakar Co-operative Housing Society Limited is delayed beyond 30 Apr 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Chandraprabhakar Co-operative Housing Society Limited?

The registered promoter entity is Mellennium Homes, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Chandraprabhakar Co-operative Housing Society Limited?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Chandraprabhakar Co-operative Housing Society Limited?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Chandraprabhakar Co-operative Housing Society Limited?

The professionals named in the filing: Architect: Rachana Shilp; Engineer: Rajesh Thakare and associates; Engineer: Tejas Deshmukh; Chartered Accountant: Kapure & Kapure; Chartered Accountant: NAVAL KARNIK & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Chandraprabhakar Co-operative Housing Society Limited?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Chandraprabhakar Co-operative Housing Society Limited. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Chandraprabhakar Co-operative Housing Societ to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.