Home / Browse projects / Satara, Maharashtra / ChandranganNiketan
ChandranganNiketan
RG-MH-89324 · RERA P52700054806 · Last updated on MahaRERA portal: 5 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 3.00 crore secured on the land, in favour of State Bank Of India
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ChandranganNiketan is a Others project by Niketan Construction in Satara, Maharashtra, registered with MahaRERA as P52700054806 on 12 Feb 2024. Possession is promised by 31 Dec 2027. 14 of the 39 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameChandranganNiketan
- TypeOthers
- Location
- 410A
- Mangalwar Peth
- Satara
- 415002
- Pincode415002
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52700054806
- ReraGenie IDRG-MH-89324
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on12 Feb 2024
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed68 files
Current status
Figures as on 5 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ChandranganNiektan | NA | 9 | 6 | 31 | 8 | 39 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 5 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 70%.
ChandranganNiektan: 52% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 5 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 25% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed51
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Mr.Dattatray Digamber Nadgaundi | Satara | Satara |
| Mr. Arun Digambar Nadgaundi | Satara | Satara |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| ChandranganNiektan | NA | Rs 5.32 cr | Rs 3.93 cr |
| - | NA | Rs 50.00 lakh | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Shree Mahajani |
| Engineer | Amey Shrikant Agate |
| Engineer | Appasaheb Sadashiv Lohar |
| Chartered Accountant | CA Abhijit Devekar & Associates |
| Chartered Accountant | S D Kulkarni and Co CA Omkar Suresh Kulkarni |
| Partner | Role in project |
|---|---|
| Niketan Construction | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Nov 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Nov 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed68
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: Form 5 Chandrangan Niketan 24 25.PDF | 5 May 2026 |
| Withdrawal Update Form 1File: Form 1 Chandrangan Niketan.PDF | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Chandrangan Niketan mar26.PDF | 20 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 Chandrangan Niketan (2).pdf | 20 Apr 2026 |
| Form 2A (FY 2026-2027)File: Form 2A Chandrangan Niketan.PDF | 15 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 ChandranganNiketan .PDF | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Chandrangan Niketan.PDF | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Chandrangan Niketan Q3.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: Form 2.PDF | 17 Oct 2025 |
| Withdrawal Update Form 3File: Form 3.PDF | 17 Oct 2025 |
| Form 2A (FY 2025-2026)File: Form 2A 25-26.PDF | 13 Oct 2025 |
| Form 2A (FY 2023-2024)File: Form 2A 23-24.PDF | 10 Oct 2025 |
| Form 2A (FY 2024-2025)File: Form 2A....PDF | 24 Jul 2025 |
| Form 5 (FY 2023-2024)File: Form 5.PDF | 17 Jul 2025 |
| Form 1File: Form 1 Chandrangan Niketan.PDF | 16 Jul 2025 |
| Form 2File: Form 2 Chandrangan Niketan.PDF | 16 Jul 2025 |
| Form 3File: Decleration Chandrangan Niketan.PDF | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: sold.PDF | 16 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Chandrangan Niketan.PDF | 24 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Decleration Chandrangan Niketan.PDF | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Chandrangan Niketan.PDF | 24 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Chandrangan Niketan 23-24.PDF | 21 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chandrangan Niketan Form 3-.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Declaration Chandrangan Nik.PDF | 4 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Chandrangan Niketan.PDF | 1 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Chandrangan Niketan.PDF | 29 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Chandrangan Niketan.PDF | 29 Jan 2025 |
| CERSAI detailsFile: CERSAI_Report.pdf | 29 Jan 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrance Chandrangan Niketan.PDF | 29 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24 Chandrangan Niketa.PDF | 29 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Chandrangan Niketan.PDF | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Chandrangan Niketan.PDF | 20 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: Free Finance.PDF | 19 Dec 2023 |
| Details of encumbrances concerned to LegalFile: Free Finance.PDF | 19 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2.PDF | 19 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (ASA).PDF | 19 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A RVJ.PDF | 19 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (D Nadgaundi).PDF | 19 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (A Nadgaundi).PDF | 19 Dec 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A (Separate Bank AC).PDF | 19 Dec 2023 |
| Layout approvalFile: Nakasha 410A Mangalwar Peth.PDF | 28 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: Nakasha 410A Mangalwar Peth.PDF | 28 Nov 2023 |
| Layout approvalFile: Extract.pdf | 27 Nov 2023 |
| Building plan approvalFile: Sanction Plan 1_compressed.pdf | 27 Nov 2023 |
| Building plan approvalFile: Sanction Plan 2_compressed.pdf | 27 Nov 2023 |
| Layout approvalFile: Sanction Plan 1_compressed.pdf | 27 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: Sanction Plan 1_compressed.pdf | 27 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: Extract.pdf | 27 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 1_compressed.pdf | 27 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 2_compressed.pdf | 27 Nov 2023 |
| Layout approvalFile: Sanction Plan 2_compressed.pdf | 23 Nov 2023 |
| PAN CardFile: PAN Card Copy.PDF | 23 Nov 2023 |
| Copy of the legal title reportFile: Search Report - Format A.PDF | 23 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Legal.PDF | 23 Nov 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Legal.PDF | 23 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: Sanction Plan 2_compressed.pdf | 23 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Sanction Letter Chandragan.PDF | 23 Nov 2023 |
| Declaration about Commencement CertificateFile: Declaration about Commencement C0001.PDF | 23 Nov 2023 |
| Declaration in FORM BFile: Form B.PDF | 23 Nov 2023 |
| CERSAI detailsFile: Undertaking CERSAI New.PDF | 23 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Chandragan Niketan_compressed.pdf | 23 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Format D- Organation.PDF | 23 Nov 2023 |
| Proforma of Allotment letterFile: Model Form of Allotment Letter.PDF | 23 Nov 2023 |
| Proforma of Agreement for saleFile: Agreement to sale.pdf | 23 Nov 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of separate bank acc.PDF | 23 Nov 2023 |
| Deviation Report with respect to Allotment letterFile: Allotment Letter of Agreement.PDF | 23 Nov 2023 |
| Deviation Report with respect to model copy of AgreementFile: Model Copy of Agreement.PDF | 23 Nov 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Swaroop Niketan | 178 Vyankatpura Peth | 1 | Completed | Oct 2024 | Aug 2023 |
| Swar- Sarita | 249 Shaniwar Peth | 1 | Completed | Oct 2019 | Apr 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Satara
Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 68 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ChandranganNiketan on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mangalwar Peth1,100+ in Satara
Filed coordinates, straight-line distance. 39 registered projects within 2 km.
Sukhodayam Villas
M/s Ultra Urban Greene Realty LLP
YASHWANT ELITE
RAHULDEV PROMOTERS SATARA
KRISHNAKUNJ VIHAR PHASE-3
Pooja Shridhar Kangralkar
SHATAKSHI TOWER
VISHAL DILIP PAWAR
SHREE VIHAR
M/s SHREE SAIDARSHAN DEVELOPERS
SHIVSAMARTH RESIDENCY
MS BHOSALE AND NALAWADE
See every Satara project, with the district possession charts
Builder: Niketan Construction
Niketan Construction has 3 registrations on MahaRERA, including Govind Leela Niketan and Shubhada Niketan. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Satara district page.
Frequently asked questions
What are my rights if ChandranganNiketan is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ChandranganNiketan?
The registered promoter entity is Niketan Construction, a partnership as per the filing. Its GSTIN 27AAKFN8363K1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ChandranganNiketan?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ChandranganNiketan?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ChandranganNiketan?
The professionals named in the filing: Architect: Shree Mahajani; Engineer: Amey Shrikant Agate; Engineer: Appasaheb Sadashiv Lohar; Chartered Accountant: CA Abhijit Devekar & Associates; Chartered Accountant: S D Kulkarni and Co CA Omkar Suresh Kulkarni. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ChandranganNiketan?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback