Home / Browse projects / Aurangabad, Maharashtra / CHANDRAMOULI PINNACLE 2
CHANDRAMOULI PINNACLE 2
RG-MH-13424 · RERA P51500048481 · Last updated on MahaRERA portal: 15 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CHANDRAMOULI PINNACLE 2 is a Residential / Group Housing project by CHANDRAMOULI PROPERTIES in Aurangabad, Maharashtra, registered with MahaRERA as P51500048481 on 3 Jan 2023. Possession is promised by 1 Dec 2026. 43 of the 44 units on this registration are recorded sold or booked, and 16 of 22 construction stages are filed complete.
At a glance
Project
- NameCHANDRAMOULI PINNACLE 2
- TypeResidential / Group Housing
- Location
- SATARA PARISAR
- SATARA
- Satara (CT)
- Aurangabad
- 431005
- Pincode431005
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51500048481
- ReraGenie IDRG-MH-13424
Builder
- NameCHANDRAMOULI PROPERTIES
- Entity typePartnership
- PartnersSeema Shantilal Pendharkar, SHANTILAL ANANDRAO PENDHARKAR
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 Jan 2023
- Promised completion1 Dec 2026
- Revised completionNone
- Buildings2 building records
- Documents filed86 files
Current status
Figures as on 15 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| CHANDRAMOULI PINNACLE 2 SOUTH SIDE BLOCK | NA | 7 | 6 | 12 | 0 | 12 |
| CHANDRAMOULI PINNACLE 2 NORTH SIDE BLOCK | NA | 9 | 7 | 32 | 0 | 32 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 97%.
CHANDRAMOULI PINNACLE 2 SOUTH SIDE BLOCK72%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 97% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
CHANDRAMOULI PINNACLE 2 NORTH SIDE BLOCK82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed33
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| CHANDRAMOULI PINNACLE 2 SOUTH SIDE BLOCK | 1 | 0 | 1 |
| CHANDRAMOULI PINNACLE 2 NORTH SIDE BLOCK | 30 | 2 | 32 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| CHANDRAMOULI PINNACLE 2 NORTH SIDE BLOCK | NA | Rs 5.50 cr | Rs 5.50 cr |
| CHANDRAMOULI PINNACLE 2 SOUTH SIDE BLOCK | NA | Rs 5.15 cr | Rs 3.30 cr |
| - | NA | Rs 45.00 lakh | Rs 40.00 lakh |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ganesh Mharolkar Ms Space |
| Architect | Ganesh Mharolkar |
| Engineer | Core Consutant |
| Engineer | Sagarsing Gusinge |
| Chartered Accountant | Alok P Deora M R Hundiwala & co |
| Chartered Accountant | MA Hundiwala & Co |
| Chartered Accountant | Rajeshwar Heda |
| Chartered Accountant | M. R. Hundiwala & Co. |
| Partner | Role in project |
|---|---|
| CHANDRAMOULI PROPERTIES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Oct 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Oct 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Oct 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 1 Dec 2026
Documents filed86
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1_Q4_25-26.pdf | 15 May 2026 |
| Withdrawal Update Form 2File: Form 2_Q4_25-26_Modified.pdf | 15 May 2026 |
| Withdrawal Update Form 3File: Form 3_Q4_25-26.pdf | 15 May 2026 |
| Withdrawal Update Form 1File: Form 1_Q3_25-26.pdf | 28 Feb 2026 |
| Withdrawal Update Form 2File: Form 2_Q3_24- 25.pdf | 28 Feb 2026 |
| Withdrawal Update Form 3File: Form 3_Q3_25-26_Signed.pdf | 28 Feb 2026 |
| Withdrawal Update Form 1File: Form 1_Sept 25.pdf | 17 Jan 2026 |
| Withdrawal Update Form 2File: Form 2_Sept 25.pdf | 17 Jan 2026 |
| Withdrawal Update Form 3File: Form - 3 Chandramouli Properties_Signed.pdf | 17 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Architect 30-06-25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Engineer 30-06-25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 3File: Form 3_Q1_25-26_Signed.pdf | 13 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 5_Chandramouli properties_24-25_Signed.pdf | 31 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure regarding sold booked inventory_Mar 25.pdf | 30 Aug 2025 |
| Form 3File: CHANDRAMOULI PROPERTIES FORM-3.pdf | 30 Aug 2025 |
| Form 1File: Form 1.pdf | 30 Aug 2025 |
| Form 2File: Form 2.pdf | 30 Aug 2025 |
| Withdrawal Update Form 1File: Form 1 Architect 30-06-25.pdf | 30 Aug 2025 |
| Withdrawal Update Form 2File: FORM2.pdf | 30 Aug 2025 |
| Withdrawal Update Form 3File: FORM 3 Q3.pdf | 30 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-03-2025.pdf | 5 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-03-2025.pdf | 5 May 2025 |
| Disclosure of sold/ booked inventoryFile: Booked Inventory 31-03-2025.pdf | 5 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CP_Form 3.pdf | 5 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 (31-12-24).pdf | 30 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 (31-12-24).pdf | 30 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: sold unsold(31-12-24).pdf | 30 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1-06-2024.pdf | 9 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1- 09-2024.pdf | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 -03-2023.pdf | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3-03-2024.pdf | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3-06-2024.pdf | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3-09-2024.pdf | 9 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2-03-2024.pdf | 9 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2-09-2024.pdf | 9 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2-06-2024.pdf | 9 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold 03-2023.pdf | 9 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: sold 06-2024.pdf | 9 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: sold 09-2024.pdf | 9 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5-03-2024.pdf | 9 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DocScanner 28-May-2024 12-14 PM.pdf | 28 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: DocScanner 28-May-2024 12-30 PM.pdf | 28 May 2024 |
| Disclosure of sold/ booked inventoryFile: DocScanner 28-May-2024 12-13 PM.pdf | 28 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3.pdf | 16 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 10-01-2024.pdf | 12 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Booked Inventory.pdf | 28 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FormJAN24.pdf | 27 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 civil enginer.pdf | 27 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 27 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 17 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf | 17 Oct 2023 |
| Home Buyer /Allottee Grievance Redressal CellFile: Allotte Grievance.pdf | 17 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ca.pdf | 22 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 architect (1).pdf | 11 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 new.pdf | 11 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: DocScanner 10-Aug-2023 11-48 am.pdf | 10 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Chandramouli Properties_2022-23.pdf | 9 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: disclosure of sold.pdf | 29 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect certificate.pdf | 26 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 Architect certificate.pdf | 26 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate-1.pdf | 26 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Quality Certificate.pdf | 26 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed.pdf | 19 Dec 2022 |
| Proforma of Allotment letterFile: MAHARERA ALLOTMENT LETTER.pdf | 17 Nov 2022 |
| Proforma of Agreement for saleFile: MAHARERA AFS.pdf | 17 Nov 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation report Allotment letter.pdf | 17 Nov 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report to Agreement to sale.pdf | 17 Nov 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A_Bank Accounts.pdf | 18 Oct 2022 |
| Details of encumbrances concerned to FinanceFile: No Encumbrances Certificate.pdf | 10 Oct 2022 |
| Details of encumbrances concerned to LegalFile: No Encumbrances Certificate.pdf | 10 Oct 2022 |
| Declaration about Commencement CertificateFile: Declaration about commencement Certificate.pdf | 10 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate_Revised.pdf | 10 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory.pdf | 10 Oct 2022 |
| CERSAI detailsFile: CERSAI_Search_Report.pdf | 10 Oct 2022 |
| Building plan approvalFile: Building plan 1.pdf | 3 Oct 2022 |
| Building plan approvalFile: Building Plan_ second view.pdf | 3 Oct 2022 |
| Layout approvalFile: Layout plan.pdf | 3 Oct 2022 |
| PAN CardFile: PAN.pdf | 3 Oct 2022 |
| Copy of the legal title reportFile: search report 2 pinna_compressed (1).pdf | 3 Oct 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 86 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep CHANDRAMOULI PINNACLE 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SATARA1,400+ in Aurangabad
Filed coordinates, straight-line distance. 87 registered projects within 2 km.
One World Phase I
SIMAR PRIDE VENTURES LLP
The Solitairee Phase I
Dizzi Land Farms Private Limited
Neo Orbit
Piyush Infratech Pvt.Ltd.
180 and 51 Greens
A.M.PATEL INFRA PVT LTD
MILLENNIUM BUSINESS CENTER
MILLENNIUMPRO NEST LLP
The Solitairee Phase II
Dizzi Land Farms Private Limited
See every Aurangabad project, with the district possession charts
Builder: CHANDRAMOULI PROPERTIES
CHANDRAMOULI PROPERTIES has 1 registration on MahaRERA, including CHANDRAMOULI PINNACLE 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What are my rights if CHANDRAMOULI PINNACLE 2 is delayed beyond 1 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CHANDRAMOULI PINNACLE 2?
The registered promoter entity is CHANDRAMOULI PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CHANDRAMOULI PINNACLE 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for CHANDRAMOULI PINNACLE 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CHANDRAMOULI PINNACLE 2?
The professionals named in the filing: Architect: Ganesh Mharolkar Ms Space; Architect: Ganesh Mharolkar; Engineer: Core Consutant; Engineer: Sagarsing Gusinge; Chartered Accountant: Alok P Deora M R Hundiwala & co; Chartered Accountant: MA Hundiwala & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CHANDRAMOULI PINNACLE 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback