Home / Browse projects / Aurangabad, Maharashtra / CHANDRAMOULI PINNACLE 2

Registered No litigation declared Residential / Group Housing project

CHANDRAMOULI PINNACLE 2

By CHANDRAMOULI PROPERTIES

RG-MH-13424 · RERA P51500048481 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
16 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 97%
1 of 44Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

CHANDRAMOULI PINNACLE 2 is a Residential / Group Housing project by CHANDRAMOULI PROPERTIES in Aurangabad, Maharashtra, registered with MahaRERA as P51500048481 on 3 Jan 2023. Possession is promised by 1 Dec 2026. 43 of the 44 units on this registration are recorded sold or booked, and 16 of 22 construction stages are filed complete.

At a glance

Project

  • NameCHANDRAMOULI PINNACLE 2
  • TypeResidential / Group Housing
  • Location
    • SATARA PARISAR
    • SATARA
    • Satara (CT)
    • Aurangabad
    • 431005
  • Pincode431005
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500048481
  • ReraGenie IDRG-MH-13424

Builder

  • NameCHANDRAMOULI PROPERTIES
  • Entity typePartnership
  • PartnersSeema Shantilal Pendharkar, SHANTILAL ANANDRAO PENDHARKAR

Key dates

this monthRegisteredJan 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Jan 2023
  • Promised completion1 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed86 files

Current status

98%43 of 44 units booked
82.9%Work done, per cost certificate

Figures as on 15 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CHANDRAMOULI PINNACLE 2 SOUTH SIDE BLOCKNA7612012
CHANDRAMOULI PINNACLE 2 NORTH SIDE BLOCKNA9732032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 97%.

CHANDRAMOULI PINNACLE 2 SOUTH SIDE BLOCK72%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises97%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
CHANDRAMOULI PINNACLE 2 NORTH SIDE BLOCK82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed33

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots33
Closed/Covered31
Open Space2
BuildingClosed/CoveredOpen SpaceTotal
CHANDRAMOULI PINNACLE 2 SOUTH SIDE BLOCK101
CHANDRAMOULI PINNACLE 2 NORTH SIDE BLOCK30232

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,246 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Sep 2024

Approvals and building plan

Sanctioning authorityChhatrapati Sambhajinagar Municipal Corporation
Permissible FSI3983.66
Proposed, not sanctioned3,984 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 27 SAMRAT NAGAR
Estimated costRs 11.10 cr
Cost incurredRs 9.20 cr
Work done82.86%
BuildingWingEstimatedIncurred
CHANDRAMOULI PINNACLE 2 NORTH SIDE BLOCKNARs 5.50 crRs 5.50 cr
CHANDRAMOULI PINNACLE 2 SOUTH SIDE BLOCKNARs 5.15 crRs 3.30 cr
-NARs 45.00 lakhRs 40.00 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGanesh Mharolkar Ms Space
ArchitectGanesh Mharolkar
EngineerCore Consutant
EngineerSagarsing Gusinge
Chartered AccountantAlok P Deora M R Hundiwala & co
Chartered AccountantMA Hundiwala & Co
Chartered AccountantRajeshwar Heda
Chartered AccountantM. R. Hundiwala & Co.
PartnerRole in project
CHANDRAMOULI PROPERTIES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Dec 2026

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Q4_25-26.pdf15 May 2026
Withdrawal Update Form 2File: Form 2_Q4_25-26_Modified.pdf15 May 2026
Withdrawal Update Form 3File: Form 3_Q4_25-26.pdf15 May 2026
Withdrawal Update Form 1File: Form 1_Q3_25-26.pdf28 Feb 2026
Withdrawal Update Form 2File: Form 2_Q3_24- 25.pdf28 Feb 2026
Withdrawal Update Form 3File: Form 3_Q3_25-26_Signed.pdf28 Feb 2026
Withdrawal Update Form 1File: Form 1_Sept 25.pdf17 Jan 2026
Withdrawal Update Form 2File: Form 2_Sept 25.pdf17 Jan 2026
Withdrawal Update Form 3File: Form - 3 Chandramouli Properties_Signed.pdf17 Jan 2026
Withdrawal Update Form 1File: Form 1 Architect 30-06-25.pdf13 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer 30-06-25.pdf13 Jan 2026
Withdrawal Update Form 3File: Form 3_Q1_25-26_Signed.pdf13 Jan 2026
Form 5 (FY 2024-2025)File: Form 5_Chandramouli properties_24-25_Signed.pdf31 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure regarding sold booked inventory_Mar 25.pdf30 Aug 2025
Form 3File: CHANDRAMOULI PROPERTIES FORM-3.pdf30 Aug 2025
Form 1File: Form 1.pdf30 Aug 2025
Form 2File: Form 2.pdf30 Aug 2025
Withdrawal Update Form 1File: Form 1 Architect 30-06-25.pdf30 Aug 2025
Withdrawal Update Form 2File: FORM2.pdf30 Aug 2025
Withdrawal Update Form 3File: FORM 3 Q3.pdf30 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-03-2025.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-03-2025.pdf5 May 2025
Disclosure of sold/ booked inventoryFile: Booked Inventory 31-03-2025.pdf5 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CP_Form 3.pdf5 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 (31-12-24).pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 (31-12-24).pdf30 Jan 2025
Disclosure of sold/ booked inventoryFile: sold unsold(31-12-24).pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1-06-2024.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1- 09-2024.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 -03-2023.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3-03-2024.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3-06-2024.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3-09-2024.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2-03-2024.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2-09-2024.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2-06-2024.pdf9 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold 03-2023.pdf9 Nov 2024
Disclosure of sold/ booked inventoryFile: sold 06-2024.pdf9 Nov 2024
Disclosure of sold/ booked inventoryFile: sold 09-2024.pdf9 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5-03-2024.pdf9 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DocScanner 28-May-2024 12-14 PM.pdf28 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: DocScanner 28-May-2024 12-30 PM.pdf28 May 2024
Disclosure of sold/ booked inventoryFile: DocScanner 28-May-2024 12-13 PM.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3.pdf16 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 10-01-2024.pdf12 Feb 2024
Disclosure of sold/ booked inventoryFile: Booked Inventory.pdf28 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FormJAN24.pdf27 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 civil enginer.pdf27 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf17 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf17 Oct 2023
Home Buyer /Allottee Grievance Redressal CellFile: Allotte Grievance.pdf17 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ca.pdf22 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 architect (1).pdf11 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 new.pdf11 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: DocScanner 10-Aug-2023 11-48 am.pdf10 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Chandramouli Properties_2022-23.pdf9 Aug 2023
Disclosure of sold/ booked inventoryFile: disclosure of sold.pdf29 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect certificate.pdf26 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 Architect certificate.pdf26 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate-1.pdf26 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Quality Certificate.pdf26 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed.pdf19 Dec 2022
Proforma of Allotment letterFile: MAHARERA ALLOTMENT LETTER.pdf17 Nov 2022
Proforma of Agreement for saleFile: MAHARERA AFS.pdf17 Nov 2022
Deviation Report with respect to Allotment letterFile: Deviation report Allotment letter.pdf17 Nov 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report to Agreement to sale.pdf17 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A_Bank Accounts.pdf18 Oct 2022
Details of encumbrances concerned to FinanceFile: No Encumbrances Certificate.pdf10 Oct 2022
Details of encumbrances concerned to LegalFile: No Encumbrances Certificate.pdf10 Oct 2022
Declaration about Commencement CertificateFile: Declaration about commencement Certificate.pdf10 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate_Revised.pdf10 Oct 2022
Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory.pdf10 Oct 2022
CERSAI detailsFile: CERSAI_Search_Report.pdf10 Oct 2022
Building plan approvalFile: Building plan 1.pdf3 Oct 2022
Building plan approvalFile: Building Plan_ second view.pdf3 Oct 2022
Layout approvalFile: Layout plan.pdf3 Oct 2022
PAN CardFile: PAN.pdf3 Oct 2022
Copy of the legal title reportFile: search report 2 pinna_compressed (1).pdf3 Oct 2022

How this compares with Aurangabad

98%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep CHANDRAMOULI PINNACLE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SATARA1,400+ in Aurangabad

2 kmCHANDRAMOULI PINNACLE 2Completed 26Lapsed / revoked 19Other 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 87 registered projects within 2 km.

Builder: CHANDRAMOULI PROPERTIES

CHANDRAMOULI PROPERTIES has 1 registration on MahaRERA, including CHANDRAMOULI PINNACLE 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if CHANDRAMOULI PINNACLE 2 is delayed beyond 1 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CHANDRAMOULI PINNACLE 2?

The registered promoter entity is CHANDRAMOULI PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CHANDRAMOULI PINNACLE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CHANDRAMOULI PINNACLE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CHANDRAMOULI PINNACLE 2?

The professionals named in the filing: Architect: Ganesh Mharolkar Ms Space; Architect: Ganesh Mharolkar; Engineer: Core Consutant; Engineer: Sagarsing Gusinge; Chartered Accountant: Alok P Deora M R Hundiwala & co; Chartered Accountant: MA Hundiwala & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CHANDRAMOULI PINNACLE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CHANDRAMOULI PINNACLE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CHANDRAMOULI PINNACLE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.