Home / Browse projects / Pune, Maharashtra / Chandradeep Apartment
Chandradeep Apartment
By Shri Laxmi Narayan Properties LLP
RG-MH-77382 · RERA P52100052116 · Last updated on MahaRERA portal: 14 Aug 2025
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 19 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Chandradeep Apartment is a Others project by Shri Laxmi Narayan Properties LLP in Pune, Maharashtra, registered with MahaRERA as P52100052116 on 24 Jul 2023. The registration is recorded completed; possession was promised by 24 Jul 2026. The completion date has moved by 19 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameChandradeep Apartment
- TypeOthers
- Location
- Bibwewadi -Munjeri
- Market Yard
- Gultekadi
- Haveli
- Pune
- 411037
- Pincode411037
- RERA no.P52100052116
- ReraGenie IDRG-MH-77382
Builder
- NameShri Laxmi Narayan Properties LLP
- Entity typePartnership
- LLPINAAS-2556
- GSTIN27AEDFS3957F1ZT
- LLPIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- PartnersAbhishek Shrinath Bhimale, Prasad Yashwant Bhimale
- Other registrations8 more →
- Completed3 of 9
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on24 Jul 2023
- Promised completion24 Jul 2026
- Revised completionRevised to 24 Jul 2026 (originally 1 Dec 2024)
- Buildings1 building record
- Documents filed69 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Chandradeep Apartment | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.
Chandradeep Apartment: 64% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 75% |
| Podiums (if any) | 100% |
| Plinth | 75% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 25% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 14 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed27
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership11
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Mr Vinit Pradeep Jadhav | Pune (M Corp.) | Pune |
| Mrs.Evelyn Pradeep Jadhav | Pune (M Corp.) | Pune |
| Mr Rajkishnan | Pune (M Corp.) | Pune |
| Mrs.Sneha Rajkishan Mani | Pune (M Corp.) | Pune |
| Mrs.Shradha Rajkishan Mani | Pune (M Corp.) | Pune |
| Mrs Meerabai Vaijanath Biradar | Pune (M Corp.) | Pune |
| Mr.Shaikh Nijam Suleman | Pune (M Corp.) | Pune |
| Mrs Shaikh Anwari Nijam | Pune (M Corp.) | Pune |
| Mr Isaac Momin | Pune (M Corp.) | Pune |
| Mr Vaijanath Dhondiba Biradar | Pune (M Corp.) | Pune |
| Al Ameen Co Operative Housing Society Limited | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| Shri Laxmi Narayan Properties LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to issues with procurement, unforeseen site conditions, coordination challenges and temporary financial constraints. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. We are closely monitoring progress and taking all necessary steps to ensure timely completion. Given the circumstances, we kindly request an extension until 24-07-2026. to complete the project and fulfil all regulatory requirements. We seek your underst
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12500087 | Atharva Sanjay Talekar | Shri Laxmi Narayan Properties LLP | 09/01/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jul 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jul 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed69
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: 9 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 14 Aug 2025 |
| Form 2File: 9 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 14 Aug 2025 |
| Form 3File: 10 CA Certificate on Project Cost & Fund withdrawal (Form 3) (2).pdf | 14 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf | 14 Aug 2025 |
| Form 1File: blank.pdf | 14 Aug 2025 |
| Form 2File: blank.pdf | 14 Aug 2025 |
| Form 3File: blank.pdf | 14 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: blank.pdf | 14 Aug 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3 CHANDRADEEP (2)_11zon.pdf | 11 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Circular 29.pdf | 11 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 Chandradeep FY 2023-24_11zon.pdf | 11 Feb 2025 |
| Declaration in FORM BFile: FORM -B.pdf | 10 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q3 CHANDRADEEP_compressed.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Chandradeep Apartment as on December 2024.pdf | 18 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Chandradeep Apartment as on Sep 2024.pdf | 18 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Chandradeep Apartment as on December 2024.pdf | 18 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Chandradeep Apartment as on December 2024.pdf | 18 Jan 2025 |
| Declaration in FORM BFile: FORM -B.pdf | 26 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: CIRCULAR 29.pdf | 26 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Chandradeep Apartment as on Sep 2024.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Chandradeep Apartment as on Sep 2024.pdf | 18 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Chandradeep as on June 2024.pdf | 14 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 Q1(C).pdf | 12 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 (CHANDRADEEP) Q1 24-25_compressed.pdf | 12 Aug 2024 |
| Layout approvalFile: Copy of layout_compressed.pdf | 30 Jul 2024 |
| Building plan approvalFile: Copy of layout_compressed.pdf | 30 Jul 2024 |
| Building plan approvalFile: 2nd Page.pdf | 30 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: Copy of layout_compressed.pdf | 30 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Copy of layout_compressed.pdf | 30 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2nd Page.pdf | 30 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 30 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 (C) Q-4 2023-24_compressed.pdf | 10 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Chandradeep as on March 2024_compressed.pdf | 20 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Chandradeep as on March 2024.pdf | 14 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Chandradeep as on March 2024.pdf | 14 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1) (5).pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Engineer’s Certificate on Cost Incurred on Project (Form 2) (8).pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: x.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1.pdf | 16 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Chandradeep as on June 2023_compressed.pdf | 12 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Chandradeep as on Sep 2023_compressed.pdf | 12 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Chandradeep as on December 2023.pdf | 12 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Chandradeep as on June 2023_compressed.pdf | 12 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Chandradeep as on Sep 2023_compressed.pdf | 12 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Chandradeep as on December 2023_compressed.pdf | 12 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 - Chandradeep as on Sept 2023.pdf | 8 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Chandradeep as on December 2023.pdf | 8 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Chandradeep as on December 2023.pdf | 8 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final First Form 3 Chandradeep Apartment 1signed_compressed.pdf | 22 May 2023 |
| Details of encumbrances concerned to FinanceFile: No ENCUMBRANCE LETTER -Dues.pdf | 16 May 2023 |
| Details of encumbrances concerned to FinanceFile: No ENCUMBRANCE LETTER Litigations.pdf | 16 May 2023 |
| Details of encumbrances concerned to LegalFile: No ENCUMBRANCE LETTER -Dues.pdf | 16 May 2023 |
| Details of encumbrances concerned to LegalFile: No ENCUMBRANCE LETTER Litigations.pdf | 16 May 2023 |
| Declaration about Commencement CertificateFile: FORMAT D - For Single Building.pdf | 16 May 2023 |
| Declaration in FORM BFile: FORM -B (Promoter)_Chandradeep.pdf | 16 May 2023 |
| CERSAI detailsFile: DECLARATION of Cersai.pdf | 16 May 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT -A_ Revised -Chandradeep.pdf | 16 May 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report of Allotment Letter_Chandradeep Apartment.pdf | 16 May 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report of Model AFS_Chandradeep Apartment.pdf | 16 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexxures merged-1-3.pdf | 15 May 2023 |
| Layout approvalFile: 1 Copy of Layout Approval (in case of layout) (5).pdf | 9 May 2023 |
| Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout) (5).pdf | 9 May 2023 |
| Proforma of Agreement for saleFile: AFS_Chandradeep Apartment_Shri Laxmi Narayan Properties LLP_08052023.pdf | 8 May 2023 |
| Proforma of Allotment letterFile: Allotment Letter_Chandradeep Apartment_Shri Laxmi Narayan Properties LLP_08052023.pdf | 8 May 2023 |
| Building plan approvalFile: Sanction Plan (1).pdf | 2 May 2023 |
| PAN CardFile: SLNP PAN.pdf | 2 May 2023 |
| Copy of the legal title reportFile: 1 Copy of the legal title report (9)-2-6.pdf | 2 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan (1).pdf | 2 May 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 2 May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations, which the RERA portal never shows together
- All 69 filed documents as one ZIP, foldered, with a manifest
Keep Chandradeep Apartment on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Market Yard13,700+ in Pune
MAHA TRADE MARKET PH- 2
JAIRAJ REALTY LLP
MAHA TRADE MARKET PH- 1
JAIRAJ REALTY LLP
SOLITAIRE BUSINESS HUB PHASE I, SOLITAIRE WORL
Classic Promoters and Builders Private Lim
SOLITAIRE BUSINESS HUB PHASE II, SOLITAIRE WOR
Classic Promoters and Builders Private Lim
World One Solitaire World
Classic Promoters and Builders Private Lim
HILL TOWN A B AND C WING
HILL TOWN CONSTRUCTIONS
Builder: Shri Laxmi Narayan Properties LLP
SHRI LAXMI NARAYAN PROPERTIES LLP has 9 registrations on MahaRERA, including RAMRAJ and Gautam. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Chandradeep Apartment is delayed beyond 24 Jul 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Chandradeep Apartment?
The registered promoter entity is Shri Laxmi Narayan Properties LLP, a partnership as per the filing. Its LLPIN AAS-2556 and GSTIN 27AEDFS3957F1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Chandradeep Apartment?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Chandradeep Apartment?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Chandradeep Apartment?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in Chandradeep Apartment?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback