ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / CHANDAN HEIGHTS

Registered No litigation declared Others project

CHANDAN HEIGHTS

By SPACE MASTER REALTORS

RG-MH-31714 · RERA P51800080049 · Last updated on MahaRERA portal: 29 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 40%
12 of 13Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 44 documents Report an error

CHANDAN HEIGHTS is a Others project by SPACE MASTER REALTORS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800080049 on 21 Apr 2025. Possession is promised by 30 Jun 2027. 1 of the 13 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameCHANDAN HEIGHTS
  • TypeOthers
  • Location
    • GANESH GAWADE ROAD
    • MULUND WEST
    • Mulund
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800080049
  • ReraGenie IDRG-MH-31714

Builder

  • NameSPACE MASTER REALTORS
  • Entity typePartnership
  • PartnersDEEPAK LAPASIYA, Ritesh Dedhia

Key dates

this monthRegisteredApr 2025PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Apr 2025
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed44 files

Current status

8%1 of 13 units booked
13.7%Work done, per cost certificate

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CHANDAN HEIGHTSNA8813013

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 40%.

CHANDAN HEIGHTS: 22% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area445 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jan 2026
LandownerVillageDistrict
MULUND SANDHYA PRAKASH CHSLMulundMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2405.64
Proposed, not sanctioned928 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1ST FLOOR,” RAJ PALACE”, KONNAGAR, GHATAL, WEST MIDNAPORE DIST- 721212, WEST BENGAL
Estimated costRs 11.80 cr
Cost incurredRs 1.62 cr
Work done13.73%
BuildingWingEstimatedIncurred
CHANDAN HEIGHTSNARs 10.80 crRs 1.62 cr
-NARs 1.00 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNITIN GUNJAL OF S SPECO ARCHITECT
EngineerSHIRISH ANANTWAD OF INFINITY GROW DESIGN CONSULTANT LLP
EngineerSushil Achane
Chartered AccountantVIMAL MASRANI OF MASRANI & CO
Chartered AccountantG B THAKKAR AND CO
PartnerRole in project
SPACE MASTER REALTORS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Mar 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed44

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A of Space Master FY 25-26.pdf29 Jun 2026
Withdrawal Update Form 1File: ARCHITECT FORM 1 Q4 (2025)_0001.pdf15 Apr 2026
Withdrawal Update Form 2File: ENGINEER FORM 2 Q4 (2025)_0001.pdf15 Apr 2026
Withdrawal Update Form 3File: CA FORM 3 Q4 (2025)_0001.pdf15 Apr 2026
Withdrawal Update Form 1File: Form-1 of Trimurti Residency 300625.pdf20 Jan 2026
Withdrawal Update Form 1File: Form-1 of Trimurti Residency 300625.pdf20 Jan 2026
Withdrawal Update Form 1File: Form-1 of Chandan Heights 300925.pdf20 Jan 2026
Withdrawal Update Form 1File: Form-1 of Chandan Heights 311225.pdf20 Jan 2026
Withdrawal Update Form 2File: Form-2 of Trimurti Residency 300625.pdf20 Jan 2026
Withdrawal Update Form 2File: Form-2 of Trimurti Residency 300625.pdf20 Jan 2026
Withdrawal Update Form 2File: Form-2 of Chandan Heights 300925.pdf20 Jan 2026
Withdrawal Update Form 2File: Form-2 of Chandan Heights 311225.pdf20 Jan 2026
Withdrawal Update Form 3File: 1 CA Certificate on Project Cost u0026 Fund withdrawal (Form 3)- Space Master.pdf20 Jan 2026
Withdrawal Update Form 3File: Form-3 of Trimurti Residency 300625.pdf20 Jan 2026
Withdrawal Update Form 3File: Form-3 of Chandan Heights 300925.pdf20 Jan 2026
Withdrawal Update Form 3File: Form-3 of Chandan Heights 311225.pdf20 Jan 2026
Other - LegalFile: final submission.pdf31 Mar 2025
Other - TechnicalFile: ANNEXURE A.pdf15 Mar 2025
Declaration in FORM BFile: FORM - B (1).pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate_Space master_signed.pdf8 Mar 2025
Copy of the legal title reportFile: title.pdf6 Mar 2025
Details of encumbrances concerned to FinanceFile: finance declaration.pdf6 Mar 2025
Details of encumbrances concerned to FinanceFile: legal declaration.pdf6 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate (3).pdf6 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf6 Mar 2025
Declaration about Commencement CertificateFile: cc declaration.pdf6 Mar 2025
CERSAI detailsFile: CERSAI_Search_Report_200343517170_For_Asset_Based_Search_06_03_2025_12_58_50_019.pdf6 Mar 2025
CERSAI detailsFile: cersai declaration.pdf6 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: format A.pdf6 Mar 2025
Deviation Report with respect to Allotment letterFile: Deviation sheet afs.pdf6 Mar 2025
Details of encumbrances concerned to LegalFile: finance declaration.pdf6 Mar 2025
Details of encumbrances concerned to LegalFile: legal declaration.pdf6 Mar 2025
Deviation Report with respect to model copy of AgreementFile: deviation.pdf6 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: other project cisclosure.pdf6 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: INDUSIND BANK LETTER (1).pdf6 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure.pdf6 Mar 2025
Layout approvalFile: layout .pdf15 Feb 2025
Building plan approvalFile: IOD 3_Drawing (3)_merged-compressed.pdf15 Feb 2025
PAN CardFile: space master - pan card.pdf15 Feb 2025
Copy of Layout Approval (in case of layout)File: layout .pdf15 Feb 2025
Proforma of Allotment letterFile: Allotment (1).pdf15 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: FirstCC_signed.pdf15 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: IOD 3_Drawing (3)_merged-compressed.pdf15 Feb 2025
Proforma of Agreement for saleFile: updated_OrderNo60-17-40 (1).pdf15 Feb 2025

How this compares with Mumbai Suburban

8%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CHANDAN HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MULUND WEST6,700+ in Mumbai Suburban

2 kmCHANDAN HEIGHTSCompleted 125Lapsed / revoked 98Other 155Dot size: filed unitsN

Filed coordinates, straight-line distance. 378 registered projects within 2 km.

Builder: SPACE MASTER REALTORS

SPACE MASTER REALTORS has 1 registration on MahaRERA, including CHANDAN HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if CHANDAN HEIGHTS is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CHANDAN HEIGHTS?

The registered promoter entity is SPACE MASTER REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CHANDAN HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CHANDAN HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CHANDAN HEIGHTS?

The professionals named in the filing: Architect: NITIN GUNJAL OF S SPECO ARCHITECT; Engineer: SHIRISH ANANTWAD OF INFINITY GROW DESIGN CONSULTANT LLP; Engineer: Sushil Achane; Chartered Accountant: VIMAL MASRANI OF MASRANI & CO; Chartered Accountant: G B THAKKAR AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CHANDAN HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CHANDAN HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CHANDAN HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.