ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / CHAKRAPANI COMPLEX PHASE 2

Registered No litigation declared Residential / Group Housing project

CHAKRAPANI COMPLEX PHASE 2

By DAYANAND TULASHIRAM KIRATKAR

RG-MH-04140 · RERA P51700021185 · Last updated on MahaRERA portal: 6 Jan 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 30 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 30 months from the original
11 of 33Construction stages doneacross 3 buildings; furthest along: Staircases, 50%
1Complaints at MahaRERAon this registration
Jump to the 32 documents Report an error

CHAKRAPANI COMPLEX PHASE 2 is a Residential / Group Housing project by DAYANAND TULASHIRAM KIRATKAR in Thane, Maharashtra, registered with MahaRERA as P51700021185 on 14 Jun 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 30 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameCHAKRAPANI COMPLEX PHASE 2
  • TypeResidential / Group Housing
  • Location
    • SHIVAJI NAGAR
    • SHIVAJI NAGAR DOMBIVLI
    • Chavindra
    • Thane
    • 421201
  • Pincode421201
  • RERA no.P51700021185
  • ReraGenie IDRG-MH-04140

Builder

  • NameDAYANAND TULASHIRAM KIRATKAR
  • Entity typeIndividual

Key dates

this monthRegisteredJun 2019First promiseJun 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Jun 2019
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2024)
  • Buildings3 building records
  • Documents filed32 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA60000
B WINGNA60000
C WINGNA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 6 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 50%.

A WING73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B WING37%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered8
BuildingClosed/CoveredTotal
A WING66
B WING11
C WING11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,100 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2089.0
Proposed, not sanctioned2,089 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchF 1 JAI SHRUTI APARTMENT M G ROAD VISHNU NAGAR DOMBIVLI WEST

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTIBIN THOMAS
PartnerRole in project
DAYANAND TULASHIRAM KIRATKAR-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700025580Jun 2024 → Dec 2026

Reason as filed by the promoterDear Sir/Madam, I am writing to you on behalf of Giridhar Construction, Builder and Developer, regarding our project registered under MAHARERA with registration number P51700021185, known as Chakrapani Complex Phase 2. I regret to inform you that the original promoter, Late Dayanand T. Kiratkar, passed away due to the COVID-19 pandemic. Following his demise, the legal heir, Mr. Yugandhar Dayanand Kiratkar (son of the deceased), has assumed the responsibilities of the promoter. As all the project transactions were managed and known to my father, his sudden passing caused significant delays in p

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000120931Bharat Dattu BhoirDayanand Kiratkar16/09/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jun 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jun 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed32

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: sold unsold q2.pdf6 Jan 2025
Copy of the legal title reportFile: Legal Title Report_rotated.pdf5 Jan 2025
Details of encumbrancesFile: No encumbrance .pdf5 Jan 2025
Details of encumbrances concerned to FinanceFile: No encumbrance .pdf5 Jan 2025
Declaration in FORM BFile: FORM B 500 STAMP PAPER.pdf5 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architecture Form 1.pdf5 Jan 2025
Certificates of CA (Form 3)File: FORM 3_sign.pdf5 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf5 Jan 2025
Declaration about Commencement CertificateFile: format D.pdf5 Jan 2025
CERSAI detailsFile: Cersai .pdf5 Jan 2025
CERSAI detailsFile: FINEAL REPORT CERSAI_ SUBMIT.pdf5 Jan 2025
Details of encumbrances concerned to LegalFile: No encumbrance .pdf5 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality assurance .pdf5 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM_5_sign.pdf5 Jan 2025
Copy of the legal title reportFile: KDMC - CC 2021.pdf20 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: KDMC - CC 2021.pdf20 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: CHAKRAPANI COMPLEX-2 NEW CC3.pdf30 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: CHAKRAPANI CC.pdf30 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: CHAKRAPANI COMPLEX-2 NEW CC2.pdf30 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: CHAKRAPANI COMPLEX-2 NEW CC2.pdf30 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: CHAKRAPANI COMPLEX-2 NEW CC3.pdf30 Mar 2022
Building plan approvalFile: cc.pdf4 Jun 2019
Layout approvalFile: approved plan.pdf4 Jun 2019
PAN CardFile: pan card.pdf4 Jun 2019
Copy of the legal title reportFile: title.pdf4 Jun 2019
Details of encumbrancesFile: encumbrance Decl.pdf4 Jun 2019
Copy of Layout Approval (in case of layout)File: approved plan.pdf4 Jun 2019
Building Plan Approval (IOD)File: cc.pdf4 Jun 2019
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf4 Jun 2019
Declaration in FORM BFile: form B for RERA.pdf4 Jun 2019
Certificates of CA (Form 3)File: CA Certificate_Giridhar Constructions.pdf4 Jun 2019
Proforma of Allotment letterFile: agreement for sale.pdf4 Jun 2019

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 30 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CHAKRAPANI COMPLEX PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHIVAJI NAGAR DOMBIVLI7,600+ in Thane

Builder: DAYANAND TULASHIRAM KIRATKAR

DAYANAND TULASHIRAM KIRATKAR has 1 registration on MahaRERA, including CHAKRAPANI COMPLEX PHASE 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if CHAKRAPANI COMPLEX PHASE 2 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CHAKRAPANI COMPLEX PHASE 2?

The registered promoter entity is DAYANAND TULASHIRAM KIRATKAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CHAKRAPANI COMPLEX PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against CHAKRAPANI COMPLEX PHASE 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for CHAKRAPANI COMPLEX PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CHAKRAPANI COMPLEX PHASE 2?

The professionals named in the filing: Architect: TIBIN THOMAS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CHAKRAPANI COMPLEX PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CHAKRAPANI COMPLEX PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CHAKRAPANI COMPLEX PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.