Red flags

  • Registration lapsed
  • Possession 58 months past the filed date
  • 24 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2021Possession promised58 months past this date
12 of 33Construction stages doneacross 3 buildings; furthest along: Installation of Lifts, 90%
24Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

CENTRIO-BY MJ SHAH is a Residential / Group Housing project by LAKADAWALA DEVELOPERS PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800012170 on 1 Sep 2017. Possession was promised by 30 Dec 2021 and is now 58 months past that date. 24 complaints are on record with the regulator.

At a glance

Project

  • NameCENTRIO-BY MJ SHAH
  • TypeResidential / Group Housing
  • Location
    • PL Lokhande Marg
    • Gowandi
    • Kurla
    • Mumbai Suburban
    • 400043
  • Pincode400043
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800012170
  • ReraGenie IDRG-MH-23920

Builder

  • NameLAKADAWALA DEVELOPERS PVT LTD
  • Entity typeCompany
  • DirectorJIGNESH PRAVINCHANDRA SHAH
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

58 months past promisethis monthRegisteredSep 2017PromisedDec 2021

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Sep 2017
  • Promised completion30 Dec 2021
  • Revised completionNone
  • Buildings3 building records
  • Documents filed61 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA260000
WING BNA260000
WING CNA260000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 11 Sep 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 90%.

A WING9%
ActivityProgress
Excavation81%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B83%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises73%
Sanitary Fittings within the flats / premises77%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
WING C82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises69%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 11 Sep 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes93%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed240

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots240
Closed/Covered235
Open Space5
BuildingClosed/CoveredOpen SpaceTotal
A WING80080
WING B75580
WING C80080

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area18,840 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
SATRA REALTY AND BUILDERS LTDAndheriMumbai Suburban
EKTA (GOVANDI) SRA CHSKurlaMumbai Suburban
PANCHASHEEL GOVANDI SRA CHSKurlaMumbai Suburban
CENTRIO LIFESPACES LIMITEDAndheriMumbai Suburban

Approvals and building plan

Permissible FSI25194.63
Proposed, not sanctioned25,195 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPRABHAT APARTMENT MAZGAON MUMBAI 400010

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAMEER KULKARNI
EngineerSHANGHAVI AND ASSOCIATES CONSULTANTS PVT LTD
PartnerRole in project
LAKADAWALA DEVELOPERS PVT LTD-

Complaints filed with MahaRERA24

Case no.ComplainantRespondentFiled
CC006000000056958PANKAJ KHOTCENTRIO LIFESPACES LTD (FORMERLY KNOWN AS SATRA REALTY & BUILDERS PVT LTD) CINU4520IMH2007PLCI7324614/12/2018
CC006000000023750Augustine Issac BarrettoSatra Reality & Builders16/03/2018
CC006000000196525Lakdawala Developers Pvt. Ltd.M/s. Budding Realty Private Limited27/03/2021
CC006000000196526Lakdawala Developers Private LimitedMr. Sandeep N. Doshi27/03/2021
CC006000000196528Lakdawala Developers Private LimitedMrs. Vinita Pradeep Bhagat27/03/2021
CC006000000196529Lakdawala Developers Private LimitedMr. Darshan Premji Satra27/03/2021
CC006000000057062vidya bhaleraosatra realty and builders ltd26/11/2018
CC006000000192695VRUTIKA PRAFUL SATRALAKADAWALA DEVELOPERS PVT LTD20/02/2020
CC006000000197269Mr. Aniket Hemant ParpillewarLakadwala Developers Pvt Ltd16/06/2021
CC006000000197760Varsha Anand BabarLakadawala Developers Pvt. Ltd.03/08/2021
CC006000000198054Sangram Dinkar kambleM.J. Shah Ventures23/08/2021
CC006000000195215MANISH KUMAR AGARWALCENTRIO LIFESPACES LIMITED10/12/2020
CC006000000198874PRIYANKA AGARWAL & MANISH AGARWALCentrio Lifespaces Limited09/11/2021
CC006000000197792FAIZ ALILAKADAWALA DEVELOPERS PVT. LTD.11/09/2021
CC006000000196727Uday Vasant BobhateCENTRIO LIFESPACES LIMITED02/06/2022
CC006000000196830UDAY VASANT BOBHATEM/S.LAKADAWALA DEVELOPERS PVT.LTD27/04/2021
CC006000000198747Vivek Hari NarayanCentrio Life Space Ltd.19/10/2021
CC006000000210046Centrio Lifespaces LtdMr. Pankaj Khot17/02/2022
CC006000000221115Vishal MadanCentrio Lifespace Limited07/05/2022
CC006000000302929MANOJ KUMARCentrio Lifestyles Limited05/10/2022
CC006000000344187Neelesh Aryalakadawala developers pvt ltd06/03/2023
CC006000000364682Anand Bapusaheb Babarlakadawala developers pvt ltd22/03/2023
CC006000000398018Darshan Premji SatraLakdawala Developers Pvt Ltd30/10/2023
CC12500188Neena MathurLAKADAWALA DEVELOPERS PVT LTD20/01/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Dec 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Dec 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Sep 2020

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation certificate.pdf11 Sep 2020
PAN CardFile: PAN - Centrio.pdf5 Jun 2020
Proforma of Allotment letterFile: DRAFT AGREEMENT FOR SALE 01_03_2020.pdf5 Jun 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 2019.pdf17 Apr 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec 2019.pdf20 Mar 2020
Certificates of CA (Form 3)File: Combined Form 3 June 19 V1.pdf11 Mar 2020
Certificates of CA (Form 3)File: Combined Form 3 June 19 V1.pdf11 Mar 2020
Certificates of CA (Form 3)File: Combined Form 3 June 19 V1.pdf11 Mar 2020
Proforma of Allotment letterFile: DRAFT AGREEMENT FOR SALE - CENTRIO.pdf20 Jan 2020
Certificates of CA (Form 5)File: Form 5 Centrio.pdf1 Oct 2019
Certificates of CA (Form 5)File: Form 5 LDPL.pdf30 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 2019.pdf23 Sep 2019
Certificates of CA (Form 3)File: Form 3 Consolidated - Compressed.pdf20 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf7 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 19 v1.pdf30 Jul 2019
Certificates of CA (Form 3)File: Combined Form 3 Signed V1.pdf13 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Final_Form_1.pdf2 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Final_Form-1.pdf12 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 V1.pdf23 Mar 2019
Certificates of CA (Form 3)File: Combined Form 3 V1.pdf11 Mar 2019
Proforma of Allotment letterFile: Centrio Draft Agreement 06032019.pdf6 Mar 2019
Commencement Certificates / NA Order for plotted developmentFile: CC Revalidation of Sale Bldg.pdf29 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf29 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf29 Dec 2018
Certificates of CA (Form 3)File: Form 3 Consolidated.pdf21 Dec 2018
Building plan approvalFile: Amended IOA 13122018.pdf14 Dec 2018
Building Plan Approval (IOD)File: Amended IOA 13122018.pdf14 Dec 2018
Details of encumbrancesFile: Details of Encumbarances.pdf26 Nov 2018
Proforma of Allotment letterFile: AGREEMENT FOR SALE - CENTRIO DRAFT (2).pdf26 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sameer Kulkarni.pdf12 Oct 2018
Certificates of CA (Form 5)File: Form 5 Combined.pdf11 Oct 2018
Certificates of CA (Form 5)File: Form 5 LDPL.pdf11 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf8 Oct 2018
Certificates of CA (Form 3)File: Form 3 Consolidated v1.pdf6 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf11 Sep 2018
Proforma of Allotment letterFile: AGREEMENT FOR SALE-Satra's Eastern Heights 29082018.pdf29 Aug 2018
Proforma of Allotment letterFile: Agreement for Sale Draft.pdf10 Aug 2018
Declaration in FORM BFile: SRBL Undertaking RERA 25072018_opt_opt.pdf28 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: CC Sale Bldg.pdf28 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 2017.pdf3 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 DEC 17 SRBL.pdf5 Apr 2018
Certificates of CA (Form 3)File: FORM 3 -DEC 17 srbl.pdf20 Feb 2018
OtherFile: OC REHAB 1.pdf3 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA 30-9-2017 FORM 2 SRBL COMBINED.pdf31 Oct 2017
Certificates of CA (Form 3)File: SRBL FORM 3 SEPT FOR LOADING.pdf31 Oct 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SRBL FORM 1 SEPT 17.pdf30 Oct 2017
Building plan approvalFile: IOD SRBL.pdf29 Jul 2017
Layout approvalFile: 111104_LAYOUT_1.pdf29 Jul 2017
PAN CardFile: Lakdawala Developers.pdf29 Jul 2017
PAN CardFile: PAN Satra Realty And Builders Limited 22-07-2013 New.pdf29 Jul 2017
Copy of the legal title reportFile: Title Report - BK Gala compressed.pdf29 Jul 2017
Details of encumbrancesFile: CHARGES SRBL.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 111104_LAYOUT_1.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD SRBL.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC WING A B.pdf29 Jul 2017
Declaration in FORM BFile: Lakhadwala Form B.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 SRBL.pdf29 Jul 2017
Certificates of CA (Form 3)File: form 3 srbl.pdf29 Jul 2017
Proforma of Allotment letterFile: Ag_for_Sale_Satra_Eastern Heights.pdf29 Jul 2017
Proforma of Allotment letterFile: Satra_Eastern Heights_Allotment__Letter.pdf29 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CENTRIO-BY MJ SHAH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Gowandi6,700+ in Mumbai Suburban

2 kmCENTRIO-BY MJ SHAHCompleted 114Lapsed / revoked 84Other 91Dot size: filed unitsN

Filed coordinates, straight-line distance. 289 registered projects within 2 km.

Builder: LAKADAWALA DEVELOPERS PVT LTD

LAKADAWALA DEVELOPERS PVT LTD has 4 registrations on MahaRERA, including LAKADAWALA SOLITAIRE and MAARIA ANNEXE. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that CENTRIO-BY MJ SHAH shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if CENTRIO-BY MJ SHAH is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CENTRIO-BY MJ SHAH?

The registered promoter entity is LAKADAWALA DEVELOPERS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CENTRIO-BY MJ SHAH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against CENTRIO-BY MJ SHAH?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for CENTRIO-BY MJ SHAH?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CENTRIO-BY MJ SHAH?

The professionals named in the filing: Architect: SAMEER KULKARNI; Engineer: SHANGHAVI AND ASSOCIATES CONSULTANTS PVT LTD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CENTRIO-BY MJ SHAH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CENTRIO-BY MJ SHAH. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CENTRIO-BY MJ SHAH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.