Registration lapsed No litigation declared Residential / Group Housing project

Celestia Spaces

By Peninsula Land Limited

RG-MH-59353 · RERA P51900005432 · Last updated on MahaRERA portal: 15 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 46 months past the filed date
  • 32 complaints at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2022Possession promised46 months past this date
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
32Complaints at MahaRERAon this registration
Jump to the 228 documents Report an error

Celestia Spaces is a Residential / Group Housing project by Peninsula Land Limited in Sewri, 400015, registered with MahaRERA as P51900005432 on 11 Aug 2017. Possession was promised by 30 Dec 2022 and is now 46 months past that date. The completion date has moved by 18 months from the original filing. 32 complaints are on record with the regulator.

At a glance

Project

  • NameCelestia Spaces
  • TypeResidential / Group Housing
  • Location
    • T J Road
    • Sewri
    • 400015
  • Pincode400015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900005432
  • ReraGenie IDRG-MH-59353

Builder

  • NamePeninsula Land Limited
  • Entity typeCompany
  • Managing DirectorMahesh Gupta
  • Other registrations16 more →
  • Completed8 of 17
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects12 →

Key dates

46 months past promisethis monthRegisteredAug 2017First promiseJun 2021Revised toDec 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on11 Aug 2017
  • Promised completion30 Dec 2022
  • Revised completionRevised to 30 Dec 2022 (originally 30 Jun 2021)
  • Buildings2 building records
  • Documents filed228 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower ANA710000
Tower BNA710000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 15 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

Tower A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Tower B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed991

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots991
Closed/Covered973
Open Space18
BuildingClosed/CoveredOpen SpaceTotal
Tower A4869495
Tower B4879496

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,288 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Hem Bhattad AOP-Mumbai City
R M Bhuther & Company Limited-Mumbai City

Approvals and building plan

Permissible FSI50143.0
Proposed, not sanctioned48,912 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFree Press House, 215, Nariman Point, Mumbai - 400021

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHafeez Contractor
ArchitectKapadia Consultant
ArchitectNeil Soft Limited
PartnerRole in project
Peninsula Land Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900009883Jun 2021 → Jun 2022

Reason as filed by the promoterA. Delay due to change in road width of the proposed DP Road. B. Delay due to change in policy to grant FSI in lieu of construction of DP Road/Amenity. C. Delay in taking over Public Parking Lot by MCGM. D. Delay due to impact of the COVID-19 Pandemic.

Litigation declared4

CaseCourtStatus
221/2015Small Causes Court at MumbaiPending
1677/2016High Court of Judicature at BombayPending
1200/2015High Court of Judicature at BombayPending
1730/2011High Court of Judicature at BombayPending

Complaints filed with MahaRERA32

Case no.ComplainantRespondentFiled
CC006000000023762BARODAWALA PROPERTIES PVT. LTD.PENINSULA LAND LIMITED16/03/2018
CC006000000023763ZENITH TINS PVT. LTD.PENINSULA LAND LIMITED16/03/2018
CC006000000192935Suresh C SoniHEM BHATTAD28/09/2020
CC006000000194609Mayur M. KapadiaPeninsula Land Limited, Hem Bhattad (AOP) and R.M. Bhuther & Company Limited21/10/2020
CC006000000195262Neha NarainHem Bhattad16/12/2020
CC006000000197051Dr. Aabha NagralPeninsula Land Limited22/05/2021
CC006000000197308Dhanyamraju R RaoPeninsula Land Limited06/07/2021
CC006000000197822Rohit ChoudhryPeninusula Land Ltd30/07/2021
CC006000000198610Javeed PagarkarPeninsula Land Ltd09/10/2021
CC006000000209994Pritam MulaokarPENINSULA LAND LTD04/03/2022
CC006000000210221Prashant AmbrePeninsula Land Limited04/03/2022
CC006000000210358Siddhirajsinh SolankiPeninsula Land Ltd10/03/2022
CC006000000220820Gautam BothraPENINSULA LAND LTD28/12/2022
CC006000000231229Gautam BothraPENINSULA LAND LTD28/12/2022
CC006000000220654Bhaskar BorkarPeninsula Land Ltd.09/07/2022
CC006000000220656JatinMaruPeninsula Land Ltd.13/05/2022
CC006000000220875Bhushan ShahPeninsula Land Ltd.06/05/2022
CC006000000251455Samir DalviPeninsula Land Ltd15/06/2022
CC006000000282193Vidya Dilip RegePeninsula Land Limited23/09/2022
CC006000000292337ALOK KUMARPENINSULA LAND LIMITED14/08/2022
CC006000000292694GURBIR SINGHPeninsula Land Ltd.15/09/2022
CC006000000333900Sunil AgrawalPeninsula Land Limited28/01/2023
CC006000000303553Dharmesh PatelPeninsula Land Limited02/12/2022
CC006000000303729Peninsula Land LimitedDharmesh B Patel22/12/2022
CC006000000303738Peninsula Land LimitedSmita B Patel22/12/2022
CC006000000333901Peninsula Land LimitedMr. Rananjay Singh10/01/2023
CC006000000344276Peninsula Land LimitedMrs Priya R Parikh10/02/2023
CC006000000344281Peninsula Land LimitedMr Vikram Lakhotia10/02/2023
CC006000000344284Peninsula Land LimitedMs Niharika Arun Kumar Lohia10/02/2023
CC006000000333849Smita Bipinchandra PatelPeninsula Land Limited04/01/2023
CC12400387Ajay Indrakumar ShahPeninsula Land Limited11/10/2024
CC12400400Ajay Indrakumar ShahPeninsula Land Limited11/10/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Aug 2024

Documents filed228

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 228 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CERSAI detailsFile: CERSAI_PLL_15042025.pdf15 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate for Celestia Spaces March 25.pdf3 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate Celestia Spaces March 2025.pdf3 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance certificate Celestia Spaces March 2025.pdf3 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Audit CA Report of Celestia Spaces march 2023.pdf3 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Audit CA Report of Celestia Spaces march 2024.pdf3 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate for Celestia Spaces Dec 24.pdf6 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineering Certificate Dec 24 Celestia Spaces.pdf6 Jan 2025
Certificates of CA (Form 3)File: Form 3 CA Certificate Celestia Spaces Dec 2024.pdf6 Jan 2025
Disclosure of sold/ booked inventoryFile: Celestia Spaces Disclosure of sold booked inventory Dec 2024.pdf6 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate for Celestia Spaces Dec 24.pdf6 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineering Certificate Dec 24 Celestia Spaces.pdf6 Jan 2025
Certificates of CA (Form 3)File: Form 3 CA Certificate Celestia Spaces Dec 2024.pdf6 Jan 2025
Disclosure of sold/ booked inventoryFile: Celestia Spaces Disclosure of sold booked inventory Dec 2024.pdf6 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate for Celestia Spaces Dec 24.pdf6 Jan 2025
Certificates of CA (Form 3)File: Form 3 CA Certificate Celestia Spaces Dec 2024.pdf6 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineering Certificate Dec 24 Celestia Spaces.pdf6 Jan 2025
Disclosure of sold/ booked inventoryFile: Celestia Spaces Disclosure of sold booked inventory Dec 2024.pdf6 Jan 2025
Certificates of CA (Form 3)File: Form 3 CA Certificate Spt 2024 Part 1.pdf7 Oct 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate Spt 2024 Part 2.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: Celestia Spaces Disclosure of sold booked inventory Sept 2024.pdf7 Oct 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate Spt 2024 Part 1.pdf7 Oct 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate Spt 2024 Part 2.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: Celestia Spaces Disclosure of sold booked inventory Sept 2024.pdf7 Oct 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate Spt 2024 Part 1.pdf7 Oct 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate Spt 2024 Part 2.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: Celestia Spaces Disclosure of sold booked inventory Sept 2024.pdf7 Oct 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate Spt 2024 Part 1.pdf7 Oct 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate Spt 2024 Part 2.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: Celestia Spaces Disclosure of sold booked inventory Sept 2024.pdf7 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer's Certificate _ Celestia Spaces- Sept 24.pdf6 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1Architect Certificate for Celestia Spaces Sept 24.pdf6 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer's Certificate _ Celestia Spaces- Sept 24.pdf6 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1Architect Certificate for Celestia Spaces Sept 24.pdf6 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer's Certificate _ Celestia Spaces- Sept 24.pdf6 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1Architect Certificate for Celestia Spaces Sept 24.pdf6 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1Architect Certificate for Celestia Spaces Sept 24.pdf6 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer's Certificate _ Celestia Spaces- Sept 24.pdf6 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Club House OC Part 3.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Celestia Spaces Disclosure of sold booked inventory June 2024.pdf9 Jul 2024
Certificates of CA (Form 3)File: Form 3 Celestia Spoace June 2024.pdf5 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect Certificate for Celestia Spaces June 24.pdf2 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineering Certificate June'24.pdf2 Jul 2024
Certificates of CA (Form 3)File: Celestia_RERA_Mar 24.pdf5 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect Certificate for Celestia Spaces March 24.pdf3 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Celestia - RERA Engineer Certificate - March 2024.pdf3 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Celestia - RERA Quality Certificate - March 2024.pdf3 Apr 2024
Disclosure of sold/ booked inventoryFile: Celestia_RERA_March 2024.pdf3 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate form No 1 for RERA CELESTIA SPACES.pdf8 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: From 2 Engineer's Certificate _ Celestia Spaces- Dec 23.pdf8 Jan 2024
Certificates of CA (Form 3)File: Form 3 Celestia_RERA_Dec 23_compressed.pdf8 Jan 2024
CERSAI detailsFile: PLL CERSAI_Search_Report_06-10-2023.pdf9 Oct 2023
Certificates of CA (Form 3)File: CA Celestia Certificate Sept '23_compressed.pdf9 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate of Celestia Spaces for RERA sept 23.pdf5 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Celestia Engg Certificate Sept '23.pdf5 Oct 2023
Disclosure of sold/ booked inventoryFile: Celestia_RERA_June'23.pdf1 Aug 2023
Certificates of CA (Form 3)File: Celestia RARA 3 Jun 23.pdf7 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Arch Certificate - Celestia Spaces June 23.pdf6 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Celestia Spaces Engineer Certificate Jun'23.pdf4 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Celestia QA Certificate March '23.pdf26 Jun 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Celestia Spaces Reg Certificate.pdf26 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate Celestia Spaces March 2023.pdf10 May 2023
CERSAI detailsFile: PLL CERSAI Search Report 190423.pdf21 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Celestia Engineer Certificate March '23.pdf7 Apr 2023
Form 2AFile: RERA - Quality Assurance Certificate 2022-2023.pdf7 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: RERA - Quality Assurance Certificate 2022-2023.pdf7 Apr 2023
Certificates of CA (Form 3)File: Form 3 -March, 2023.pdf7 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Data 310323.pdf5 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form -1 22-10-2019.PDF30 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-01-2020.pdf30 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 30-09-2020.PDF30 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Oct 20 to Dec 20.PDF30 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Apr 21 to june 21.PDF30 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form -1 July 21 to sept 21.PDF30 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - oct, 21 to Dec 21.pdf30 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Jan, 22 to Mar 22.pdf30 Jan 2023
Certificates of CA (Form 3)File: Form -3 10-11-19.pdf30 Jan 2023
Certificates of CA (Form 3)File: Form- 3 - 24-01-20.pdf30 Jan 2023
Certificates of CA (Form 3)File: Bhattad Form-3 June-20_compressed_compressed.pdf30 Jan 2023
Certificates of CA (Form 3)File: Form-3 Sept-2020.pdf30 Jan 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Ashok Astoria Phase 1Gat No 2 Govardhan Road Gangapur Village Nashik270CompletedSep 2016Late, May 2017
Peninsula Business ParkGanpatrao Kadam Marg Senapati Bapat Marg Lower Parel Mumbai 40001389CompletedOct 2012Late, Feb 2013

Keep Celestia Spaces on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sewri

2 kmCelestia SpacesCompleted 4Lapsed / revoked 5Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 15 registered projects within 2 km.

Builder: Peninsula Land Limited

Peninsula Land Limited has 17 registrations on MahaRERA, including Celestia Spaces and addressOne - Phase 1. Its filings disclose 12 earlier MahaRERA projects: declares 7 of 11 past projects completed on time. Read the full track record.

Frequently asked questions

What does it mean that Celestia Spaces shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Celestia Spaces is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Celestia Spaces?

The registered promoter entity is Peninsula Land Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Celestia Spaces?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Celestia Spaces?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Celestia Spaces?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Celestia Spaces?

The professionals named in the filing: Architect: Hafeez Contractor; Architect: Kapadia Consultant; Architect: Neil Soft Limited. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Celestia Spaces?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Celestia Spaces. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Celestia Spaces to a free account