CD Plot No 69 Lumiere
By SD SVP Nagar Redevelopment Private Limited
RG-MH-26917 · RERA P51800005440 · Last updated on MahaRERA portal: 20 Dec 2022
Source: official MahaRERA filing
Red flags
- 33 complaints at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CD Plot No 69 Lumiere is a Residential / Group Housing project by SD SVP Nagar Redevelopment Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800005440 on 11 Aug 2017. The registration is recorded completed; possession was promised by 30 Sep 2020. The completion date has moved by 12 months from the original filing. 33 complaints are on record with the regulator.
At a glance
Project
- NameCD Plot No 69 Lumiere
- TypeResidential / Group Housing
- Location
- SARDAR VALLABHBHAI PATEL MARG
- ANDHERI WEST
- Andheri
- Mumbai Suburban
- 400053
- Pincode400053
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800005440
- ReraGenie IDRG-MH-26917
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on11 Aug 2017
- Promised completion30 Sep 2020
- Revised completionRevised to 30 Sep 2020 (originally 30 Sep 2019)
- Buildings1 building record
- Documents filed74 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| The Lumiere | NA | 27 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Dec 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 99%.
The Lumiere: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 98% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 99% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Dec 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 92% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed82
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AAK Associates |
| Engineer | Vastech Consultants & Engineers LLP |
| Chartered Accountant | Bhavesh Ramesh Nagda |
| Partner | Role in project |
|---|---|
| SD SVP Nagar Redevelopment Private Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to litigation filed by one of the non-co-operative member of the Society of Plot 69, the project was stalled for a year from February 2015. We have ultimately succeeded on 26.02.2016, however till that period, the construction work could not commenced at site,as there was stay on the construction. Another reason to mention is about the MCGM road repair work blocking the access to the site, which was continued from March 2016 up till June 2016, due to which the construction work on site was standstill as no material could be supplied on site. On the applicability of the DCPR 2034 to the ong
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 1304/2011 | City Civil Court Dindoshi | Pending |
Complaints filed with MahaRERA33
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000000711 | SHARAD PRASAD | SD SVP NAGAR REDEVELOPMENT PVT. LTD. | 19/09/2017 |
| CC006000000192816 | Karan Chopra | S D SVP Nagar Redevelopment Private Limited | 05/03/2020 |
| CC006000000193684 | SD SVP Nagar Redevelopment Private Limited | Avnesh Kumar | 08/08/2020 |
| CC006000000193716 | SD SVP Nagar Redevelopment Pvt Ltd | Rajesh Nichani | 12/08/2020 |
| CC006000000193719 | SD SVP Nagar Redevelopment PVt Ltd | Kedar Rath | 12/08/2020 |
| CC006000000193721 | SD SVP Nagar Redevelopment Pvt Ltd | Anand Mathur | 12/08/2020 |
| CC006000000193724 | SD SVP Nagar Redevelopment Pvt Ltd | Rajesh Nichani | 29/08/2020 |
| CC006000000193798 | SD SVP Nagar Redevelopment Pvt. Ltd. | Jayesh Ravani | 21/08/2020 |
| CC006000000193802 | S D SVP Nagar Redevelopment Pvt Ltd. | Saurav Mimani | 21/08/2020 |
| CC006000000193836 | S. D. SVP Nagar Redevelopment Pvt Ltd. | Shital Rasiklal Ravani | 26/08/2020 |
| CC006000000193837 | SD SVP Nagar Redevelopment Pvt. Ltd., | Manoj Kumar Agrawal | 26/08/2020 |
| CC006000000193866 | SD SVP Nagar Redevelopment Pvt ltd. | Cajetan Baptista | 29/08/2020 |
| CC006000000193867 | SD SVP Nagar redevelopment Pvt Ltd., | Mahendra Lihala | 29/08/2020 |
| CC006000000161353 | GANESH SHIVA GANESH | S.D. SVP NAGAR REDEVELOPMENT PRIVATE LIMITED | 25/10/2019 |
| CC006000000220944 | GANESH SHIVA GANESH | S.D.SVP Nagar Redevelopment Pvt Ltd | 25/04/2022 |
| CC006000000171885 | Mr. Kumar J. Changani | S.D.SVP Nagar Redevelopment Private Limited | 18/12/2019 |
| CC006000000192219 | MR. GIRISH RAVINDRAN NAIR AND MRS. RAJI GIRISH NAIR | S. D. SVP NAGAR REDEVELOPMENT PVT. LTD. AND SD CORPORATION PVT LTD | 28/01/2020 |
| CC006000000192442 | Saurav Mimani and Nikita Mimani | SD SVP Nagar Redevelopment Pvt Ltd | 05/02/2020 |
| CC006000000192494 | Anvesh Kumar and Nupur Gautam | SD SVP Nagar Redevelopment Pvt Ltd | 13/02/2020 |
| CC006000000192575 | Mahendra Lihala | SD SVP Nagar Redevelopment Pvt Ltd | 12/02/2020 |
| CC006000000193348 | Pranav Kumar and Ekta Kumari | SD SVP Nagar Redevelopment Pvt Ltd | 01/07/2020 |
| CC006000000193565 | Kedar Rath | SD SVP Nagar Redevelopment Pvt Ltd | 17/08/2020 |
| CC006000000195702 | Ashrafuz Zaman Sheikh | SD SVP Nagar Redevelopment Pvt. Ltd. | 21/01/2021 |
| CC006000000198836 | Anand Mathur | SD SVP Nagar Redevelopment Pvt. Ltd. | 27/10/2021 |
| CC006000000428979 | SD SVP Nagar Redevelopment Pvt Ltd | Pranav Kumar and Anr | 07/02/2024 |
| CC006000000591470 | SD SVP Nagar Redevelopment Pvt Ltd | Girish Nair | 09/08/2024 |
| CC006000000591471 | SD SVP Nagar Redevelopment Pvt Ltd | Mahendra Lihala | 09/08/2024 |
| CC006000000591473 | SD SVP Nagar Redevelopment Pvt Ltd | Ashrafuz Zaman Shaikh and Anr | 09/08/2024 |
| CC006000000591477 | SD SVP Nagar Redevelopment Pvt Ltd | Anvesh Kumar and Anr | 09/08/2024 |
| CC006000000591478 | SD SVP Nagar Redevelopment Pvt Ltd | Saurav Mimani and Anr | 09/08/2024 |
| CC12502795 | Sushant Tushar Mankame | Anvesh Kumar | 08/08/2025 |
| CC12502796 | Sushant Tushar Mankame | Saurav Mimani | 08/08/2025 |
| CC12502797 | Sushant Tushar Mankame | Mahendra Lihala | 08/08/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Dec 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 6 Jan 2020
Documents filed74
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Lumiere Society Registration Certificate.pdf | 20 Dec 2022 |
| Certificates of CA (Form 5)File: Lumiere.pdf | 30 Dec 2021 |
| Certificates of CA (Form 3)File: Form 3 SVP 69 CA Certificate.pdf | 12 Nov 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - SVP 69 (Lumiere) Architect Certificate Sept 2021.pdf | 7 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SVP 69 (Lumiere) Engineering Certificate Sept 2021.pdf | 7 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SVP Nagar Plot 69.pdf | 5 Oct 2021 |
| Certificates of CA (Form 3)File: Form 3 - SVP 69 (Lumiere) CA Certificate June 2021_compressed.pdf | 14 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - SVP 69 (Lumiere) Architect Certificate June 2021_compressed.pdf | 9 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SVP 69 (Lumiere) Engineering Certificate June 2021_compressed.pdf | 9 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - SVP 69 Architect Certificate Mar 2021.pdf | 19 Jul 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SVP 69 (Lumiere) Engineering Certificate Mar 2021.pdf | 19 Jul 2021 |
| Certificates of CA (Form 3)File: Form 3 - SVP 69 (Lumiere) CA Certificate Mar 2021.pdf | 19 Jul 2021 |
| Certificates of CA (Form 3)File: Lumiere DEc 20.pdf | 31 Mar 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certifcate - Lumiere 69.pdf | 1 Dec 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 1 Dec 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Lumiere 69.pdf | 1 Dec 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Lumiere 69.pdf | 1 Dec 2020 |
| Certificates of CA (Form 3)File: CA Certifcate - Lumiere 69.pdf | 1 Dec 2020 |
| Certificates of CA (Form 3)File: CA Certifcate - Lumiere 69.pdf | 1 Dec 2020 |
| Certificates of CA (Form 5)File: Lumiere 69.pdf | 30 Sep 2020 |
| Architect’s Certificate on Completion of Project (Form 4)File: Architect Certificate SVP Nagar 69 AAK Associates.pdf | 12 Sep 2020 |
| Details of Restarting of Construction work post lockdownFile: Head Post Covid Details -RERA.pdf | 20 Jun 2020 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SVP Nagar Plot No 69 Part Occupation Certificate.pdf | 6 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Lumiere.pdf | 5 Dec 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - SVP Lumiere-min.pdf | 5 Dec 2019 |
| Certificates of CA (Form 3)File: RERA Certificate - Lumiere_compressed.pdf | 29 Nov 2019 |
| Certificates of CA (Form 5)File: Lumiere 69 RERA Form 5.pdf | 30 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Lumiere.pdf | 26 Aug 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - SVP-min.pdf | 26 Aug 2019 |
| Certificates of CA (Form 3)File: CA Certificate Lumiere.pdf | 26 Aug 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Lumiere.pdf | 4 Mar 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Lumiere.pdf | 4 Mar 2019 |
| Certificates of CA (Form 3)File: CA Certificate Lumiere.pdf | 4 Mar 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Updated CC - SVP 69.pdf | 12 Dec 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Lumiere -final.pdf | 5 Dec 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - SVP Lumiere 69 -final.pdf | 5 Dec 2018 |
| Certificates of CA (Form 3)File: CA Certificate Lumiere -final.pdf | 5 Dec 2018 |
| Certificates of CA (Form 5)File: Lumiere CA Certificate Form 5.pdf | 30 Sep 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Lumiere - Final.pdf | 13 Aug 2018 |
| Certificates of CA (Form 3)File: CA Certificate - Lumiere - Final.pdf | 13 Aug 2018 |
| Declaration in FORM BFile: Declaration - Lumiere - 01.pdf | 28 May 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Lumiere - 01.pdf | 28 May 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Lumiere - 01.pdf | 28 May 2018 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 28 May 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Lumiere 01.pdf | 26 Feb 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Lumiere.pdf | 26 Feb 2018 |
| Certificates of CA (Form 3)File: CA Certificate - Lumiere.pdf | 26 Feb 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certifcate - Lumiere.pdf | 5 Jan 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Lumiere.pdf | 5 Jan 2018 |
| Certificates of CA (Form 3)File: CA Certificate - Lumiere.pdf | 5 Jan 2018 |
| Building plan approvalFile: IOD.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: IOD.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate_ SVP -69 (R).pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: Certificate - CA - Lumiere.pdf | 31 Jul 2017 |
| Building plan approvalFile: MHADA NOC.pdf | 29 Jul 2017 |
| Layout approvalFile: Proposed Floor Plan.pdf | 29 Jul 2017 |
| Layout approvalFile: Block Plan Typical Floor Plan 1.pdf | 29 Jul 2017 |
| Layout approvalFile: Proposed Block Plan.pdf | 29 Jul 2017 |
| Layout approvalFile: Block Plan Typical Floor Plan 2.pdf | 29 Jul 2017 |
| PAN CardFile: PAN - SD SVP.pdf | 29 Jul 2017 |
| Copy of the legal title reportFile: Title Report compress.pdf | 29 Jul 2017 |
| Details of encumbrancesFile: Encumbrance Details.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Block Plan Typical Floor Plan 1.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Block Plan Typical Floor Plan 2.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Proposed Block Plan.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Proposed Floor Plan.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: MHADA NOC.pdf | 29 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: CC - Lumiere.pdf | 29 Jul 2017 |
| Declaration in FORM BFile: Declaration with Affidavit - Lumiere.pdf | 29 Jul 2017 |
| Declaration in FORM BFile: Development Agreement.pdf | 29 Jul 2017 |
| Declaration in FORM BFile: Index II.pdf | 29 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Form 2 - FINAL.pdf | 29 Jul 2017 |
| Proforma of Allotment letterFile: Allotment Letter - The Lumiere.pdf | 29 Jul 2017 |
| Proforma of Allotment letterFile: AFS- The Lumiere.pdf | 29 Jul 2017 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| CD Plot No, 69 Lumiere | Sardar Vallabhbhai Patel Nagar Road SVP Nagar Andheri west Mumbai- 400 053 | 68 | Completed | Oct 2018 | Late, Sep 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 74 filed documents as one ZIP, foldered, with a manifest
Keep CD Plot No 69 Lumiere on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ANDHERI WEST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 238 registered projects within 2 km.
LIVSMART KURLA
D. K. REALTY (INDIA) PVT. LTD.
MOONGIPA ARCADE
MOONGIPA REALTY PRIVATE LIMITED
LINKBAY RESIDENCES PHASE I
PORTSMOUTH BUILDCON PRIVATE LIMITED
Purva Estrella
Puravankara Ltd
78 LAKE TOWN
ANIRDESH DEVELOPERS PRIVATE LIMITED
Transcon Triumph Tower 2
Transcon Triumph Phase 2 Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: SD SVP Nagar Redevelopment Private Limited
SD SVP Nagar Redevelopment Private Limited has 2 registrations on MahaRERA, including CD Plot No 69 Lumiere and CD PLOT NO 7. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if CD Plot No 69 Lumiere is delayed beyond 30 Sep 2020?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CD Plot No 69 Lumiere?
The registered promoter entity is SD SVP Nagar Redevelopment Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CD Plot No 69 Lumiere?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against CD Plot No 69 Lumiere?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for CD Plot No 69 Lumiere?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CD Plot No 69 Lumiere?
The professionals named in the filing: Architect: AAK Associates; Engineer: Vastech Consultants & Engineers LLP; Chartered Accountant: Bhavesh Ramesh Nagda. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CD Plot No 69 Lumiere?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback