Completed No litigation declared Residential / Group Housing project

CD Plot No 69 Lumiere

By SD SVP Nagar Redevelopment Private Limited

RG-MH-26917 · RERA P51800005440 · Last updated on MahaRERA portal: 20 Dec 2022

Source: official MahaRERA filing

Red flags

  • 33 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2020Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Staircases, 99%
33Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

CD Plot No 69 Lumiere is a Residential / Group Housing project by SD SVP Nagar Redevelopment Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800005440 on 11 Aug 2017. The registration is recorded completed; possession was promised by 30 Sep 2020. The completion date has moved by 12 months from the original filing. 33 complaints are on record with the regulator.

At a glance

Project

  • NameCD Plot No 69 Lumiere
  • TypeResidential / Group Housing
  • Location
    • SARDAR VALLABHBHAI PATEL MARG
    • ANDHERI WEST
    • Andheri
    • Mumbai Suburban
    • 400053
  • Pincode400053
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800005440
  • ReraGenie IDRG-MH-26917

Builder

  • NameSD SVP Nagar Redevelopment Private Limited
  • Entity typeCompany
  • DirectorDinesh Patel
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseSep 2019Revised toSep 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Aug 2017
  • Promised completion30 Sep 2020
  • Revised completionRevised to 30 Sep 2020 (originally 30 Sep 2019)
  • Buildings1 building record
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
The LumiereNA270000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Dec 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 99%.

The Lumiere: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)98%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Dec 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes92%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed82

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots82
Closed/Covered82

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,315 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6510.3
Proposed, not sanctioned4,030 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUnit No 3 and 4 Rahimtullah House Homji Street Horniman Circle Fort Mumbai 400001

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAAK Associates
EngineerVastech Consultants & Engineers LLP
Chartered AccountantBhavesh Ramesh Nagda
PartnerRole in project
SD SVP Nagar Redevelopment Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800002457Sep 2019 → Mar 2020

Reason as filed by the promoterDue to litigation filed by one of the non-co-operative member of the Society of Plot 69, the project was stalled for a year from February 2015. We have ultimately succeeded on 26.02.2016, however till that period, the construction work could not commenced at site,as there was stay on the construction. Another reason to mention is about the MCGM road repair work blocking the access to the site, which was continued from March 2016 up till June 2016, due to which the construction work on site was standstill as no material could be supplied on site. On the applicability of the DCPR 2034 to the ong

Litigation declared1

CaseCourtStatus
1304/2011City Civil Court DindoshiPending

Complaints filed with MahaRERA33

Case no.ComplainantRespondentFiled
CC006000000000711SHARAD PRASADSD SVP NAGAR REDEVELOPMENT PVT. LTD.19/09/2017
CC006000000192816Karan ChopraS D SVP Nagar Redevelopment Private Limited05/03/2020
CC006000000193684SD SVP Nagar Redevelopment Private LimitedAvnesh Kumar08/08/2020
CC006000000193716SD SVP Nagar Redevelopment Pvt LtdRajesh Nichani12/08/2020
CC006000000193719SD SVP Nagar Redevelopment PVt LtdKedar Rath12/08/2020
CC006000000193721SD SVP Nagar Redevelopment Pvt LtdAnand Mathur12/08/2020
CC006000000193724SD SVP Nagar Redevelopment Pvt LtdRajesh Nichani29/08/2020
CC006000000193798SD SVP Nagar Redevelopment Pvt. Ltd.Jayesh Ravani21/08/2020
CC006000000193802S D SVP Nagar Redevelopment Pvt Ltd.Saurav Mimani21/08/2020
CC006000000193836S. D. SVP Nagar Redevelopment Pvt Ltd.Shital Rasiklal Ravani26/08/2020
CC006000000193837SD SVP Nagar Redevelopment Pvt. Ltd.,Manoj Kumar Agrawal26/08/2020
CC006000000193866SD SVP Nagar Redevelopment Pvt ltd.Cajetan Baptista29/08/2020
CC006000000193867SD SVP Nagar redevelopment Pvt Ltd.,Mahendra Lihala29/08/2020
CC006000000161353GANESH SHIVA GANESHS.D. SVP NAGAR REDEVELOPMENT PRIVATE LIMITED25/10/2019
CC006000000220944GANESH SHIVA GANESHS.D.SVP Nagar Redevelopment Pvt Ltd25/04/2022
CC006000000171885Mr. Kumar J. ChanganiS.D.SVP Nagar Redevelopment Private Limited18/12/2019
CC006000000192219MR. GIRISH RAVINDRAN NAIR AND MRS. RAJI GIRISH NAIRS. D. SVP NAGAR REDEVELOPMENT PVT. LTD. AND SD CORPORATION PVT LTD28/01/2020
CC006000000192442Saurav Mimani and Nikita MimaniSD SVP Nagar Redevelopment Pvt Ltd05/02/2020
CC006000000192494Anvesh Kumar and Nupur GautamSD SVP Nagar Redevelopment Pvt Ltd13/02/2020
CC006000000192575Mahendra LihalaSD SVP Nagar Redevelopment Pvt Ltd12/02/2020
CC006000000193348Pranav Kumar and Ekta KumariSD SVP Nagar Redevelopment Pvt Ltd01/07/2020
CC006000000193565Kedar RathSD SVP Nagar Redevelopment Pvt Ltd17/08/2020
CC006000000195702Ashrafuz Zaman SheikhSD SVP Nagar Redevelopment Pvt. Ltd.21/01/2021
CC006000000198836Anand MathurSD SVP Nagar Redevelopment Pvt. Ltd.27/10/2021
CC006000000428979SD SVP Nagar Redevelopment Pvt LtdPranav Kumar and Anr07/02/2024
CC006000000591470SD SVP Nagar Redevelopment Pvt LtdGirish Nair09/08/2024
CC006000000591471SD SVP Nagar Redevelopment Pvt LtdMahendra Lihala09/08/2024
CC006000000591473SD SVP Nagar Redevelopment Pvt LtdAshrafuz Zaman Shaikh and Anr09/08/2024
CC006000000591477SD SVP Nagar Redevelopment Pvt LtdAnvesh Kumar and Anr09/08/2024
CC006000000591478SD SVP Nagar Redevelopment Pvt LtdSaurav Mimani and Anr09/08/2024
CC12502795Sushant Tushar MankameAnvesh Kumar08/08/2025
CC12502796Sushant Tushar MankameSaurav Mimani08/08/2025
CC12502797Sushant Tushar MankameMahendra Lihala08/08/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Dec 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Jan 2020

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Lumiere Society Registration Certificate.pdf20 Dec 2022
Certificates of CA (Form 5)File: Lumiere.pdf30 Dec 2021
Certificates of CA (Form 3)File: Form 3 SVP 69 CA Certificate.pdf12 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - SVP 69 (Lumiere) Architect Certificate Sept 2021.pdf7 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SVP 69 (Lumiere) Engineering Certificate Sept 2021.pdf7 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SVP Nagar Plot 69.pdf5 Oct 2021
Certificates of CA (Form 3)File: Form 3 - SVP 69 (Lumiere) CA Certificate June 2021_compressed.pdf14 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - SVP 69 (Lumiere) Architect Certificate June 2021_compressed.pdf9 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SVP 69 (Lumiere) Engineering Certificate June 2021_compressed.pdf9 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - SVP 69 Architect Certificate Mar 2021.pdf19 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - SVP 69 (Lumiere) Engineering Certificate Mar 2021.pdf19 Jul 2021
Certificates of CA (Form 3)File: Form 3 - SVP 69 (Lumiere) CA Certificate Mar 2021.pdf19 Jul 2021
Certificates of CA (Form 3)File: Lumiere DEc 20.pdf31 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certifcate - Lumiere 69.pdf1 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf1 Dec 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Lumiere 69.pdf1 Dec 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Lumiere 69.pdf1 Dec 2020
Certificates of CA (Form 3)File: CA Certifcate - Lumiere 69.pdf1 Dec 2020
Certificates of CA (Form 3)File: CA Certifcate - Lumiere 69.pdf1 Dec 2020
Certificates of CA (Form 5)File: Lumiere 69.pdf30 Sep 2020
Architect’s Certificate on Completion of Project (Form 4)File: Architect Certificate SVP Nagar 69 AAK Associates.pdf12 Sep 2020
Details of Restarting of Construction work post lockdownFile: Head Post Covid Details -RERA.pdf20 Jun 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SVP Nagar Plot No 69 Part Occupation Certificate.pdf6 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Lumiere.pdf5 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - SVP Lumiere-min.pdf5 Dec 2019
Certificates of CA (Form 3)File: RERA Certificate - Lumiere_compressed.pdf29 Nov 2019
Certificates of CA (Form 5)File: Lumiere 69 RERA Form 5.pdf30 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Lumiere.pdf26 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - SVP-min.pdf26 Aug 2019
Certificates of CA (Form 3)File: CA Certificate Lumiere.pdf26 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Lumiere.pdf4 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Lumiere.pdf4 Mar 2019
Certificates of CA (Form 3)File: CA Certificate Lumiere.pdf4 Mar 2019
Commencement Certificates / NA Order for plotted developmentFile: Updated CC - SVP 69.pdf12 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Lumiere -final.pdf5 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - SVP Lumiere 69 -final.pdf5 Dec 2018
Certificates of CA (Form 3)File: CA Certificate Lumiere -final.pdf5 Dec 2018
Certificates of CA (Form 5)File: Lumiere CA Certificate Form 5.pdf30 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Lumiere - Final.pdf13 Aug 2018
Certificates of CA (Form 3)File: CA Certificate - Lumiere - Final.pdf13 Aug 2018
Declaration in FORM BFile: Declaration - Lumiere - 01.pdf28 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Lumiere - 01.pdf28 May 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Lumiere - 01.pdf28 May 2018
Certificates of CA (Form 3)File: CA Certificate.pdf28 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Lumiere 01.pdf26 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Lumiere.pdf26 Feb 2018
Certificates of CA (Form 3)File: CA Certificate - Lumiere.pdf26 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certifcate - Lumiere.pdf5 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Lumiere.pdf5 Jan 2018
Certificates of CA (Form 3)File: CA Certificate - Lumiere.pdf5 Jan 2018
Building plan approvalFile: IOD.pdf31 Jul 2017
Building Plan Approval (IOD)File: IOD.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate_ SVP -69 (R).pdf31 Jul 2017
Certificates of CA (Form 3)File: Certificate - CA - Lumiere.pdf31 Jul 2017
Building plan approvalFile: MHADA NOC.pdf29 Jul 2017
Layout approvalFile: Proposed Floor Plan.pdf29 Jul 2017
Layout approvalFile: Block Plan Typical Floor Plan 1.pdf29 Jul 2017
Layout approvalFile: Proposed Block Plan.pdf29 Jul 2017
Layout approvalFile: Block Plan Typical Floor Plan 2.pdf29 Jul 2017
PAN CardFile: PAN - SD SVP.pdf29 Jul 2017
Copy of the legal title reportFile: Title Report compress.pdf29 Jul 2017
Details of encumbrancesFile: Encumbrance Details.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Block Plan Typical Floor Plan 1.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Block Plan Typical Floor Plan 2.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Proposed Block Plan.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Proposed Floor Plan.pdf29 Jul 2017
Building Plan Approval (IOD)File: MHADA NOC.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC - Lumiere.pdf29 Jul 2017
Declaration in FORM BFile: Declaration with Affidavit - Lumiere.pdf29 Jul 2017
Declaration in FORM BFile: Development Agreement.pdf29 Jul 2017
Declaration in FORM BFile: Index II.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Form 2 - FINAL.pdf29 Jul 2017
Proforma of Allotment letterFile: Allotment Letter - The Lumiere.pdf29 Jul 2017
Proforma of Allotment letterFile: AFS- The Lumiere.pdf29 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
CD Plot No, 69 LumiereSardar Vallabhbhai Patel Nagar Road SVP Nagar Andheri west Mumbai- 400 05368CompletedOct 2018Late, Sep 2019

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CD Plot No 69 Lumiere on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ANDHERI WEST6,700+ in Mumbai Suburban

2 kmCD Plot No 69 LumiereCompleted 101Lapsed / revoked 62Other 75Dot size: filed unitsN

Filed coordinates, straight-line distance. 238 registered projects within 2 km.

Builder: SD SVP Nagar Redevelopment Private Limited

SD SVP Nagar Redevelopment Private Limited has 2 registrations on MahaRERA, including CD Plot No 69 Lumiere and CD PLOT NO 7. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if CD Plot No 69 Lumiere is delayed beyond 30 Sep 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CD Plot No 69 Lumiere?

The registered promoter entity is SD SVP Nagar Redevelopment Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CD Plot No 69 Lumiere?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against CD Plot No 69 Lumiere?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for CD Plot No 69 Lumiere?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CD Plot No 69 Lumiere?

The professionals named in the filing: Architect: AAK Associates; Engineer: Vastech Consultants & Engineers LLP; Chartered Accountant: Bhavesh Ramesh Nagda. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CD Plot No 69 Lumiere?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CD Plot No 69 Lumiere. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CD Plot No 69 Lumiere to a free account