Casagrand Caladium
By Casagrand Millenia Private Limited
RG-MH-32363 · RERA P52100080302 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 3 cases
- 1 complaint at MahaRERA
- Rs 150.00 crore secured on the land, in favour of TATA CAPITAL HOUSING FINANCE LIMITED
Clear
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Casagrand Caladium is a Residential / Group Housing project by Casagrand Millenia Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100080302 on 19 May 2025. Possession is promised by 19 May 2029. 92 of the 334 units on this registration are recorded sold or booked, and 0 of 55 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameCasagrand Caladium
- TypeResidential / Group Housing
- Location
- Wagholi
- Pune
- Haveli
- 412207
- Pincode412207
- RERA no.P52100080302
- ReraGenie IDRG-MH-32363
Builder
- NameCasagrand Millenia Private Limited
- Entity typeCompany
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on19 May 2025
- Promised completion19 May 2029
- Revised completionNone
- Buildings5 building records
- Documents filed68 files
Current status
Figures as on 20 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower R | NA | 17 | 16 | 64 | 0 | 64 |
| Tower S1 | NA | 17 | 16 | 64 | 0 | 64 |
| Tower S2 | NA | 17 | 16 | 64 | 0 | 64 |
| Tower T1 | NA | 17 | 16 | 62 | 0 | 62 |
| Tower T2 | NA | 17 | 16 | 80 | 0 | 80 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Excavation, at 0%.
Tower R0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Tower S10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Tower S20%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Tower T10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Tower T20%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed334
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Tower R | 64 | 64 |
| Tower S1 | 64 | 64 |
| Tower S2 | 64 | 64 |
| Tower T1 | 62 | 62 |
| Tower T2 | 80 | 80 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Tower T1 | NA | Rs 24.99 cr | - |
| Tower R | NA | Rs 23.29 cr | - |
| Tower S1 | NA | Rs 23.29 cr | - |
| Tower T2 | NA | Rs 22.98 cr | - |
| Tower S2 | NA | Rs 22.01 cr | - |
| - | NA | Rs 12.95 cr | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vikas Achalkar |
| Architect | L Madan |
| Engineer | Mr. Jagadish Purushothaman |
| Chartered Accountant | Narayana Rao M |
| Partner | Role in project |
|---|---|
| Casagrand Millenia Private Limited | - |
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 778/2026/2026 | Civil Court Sr. Division | Ongoing |
| 2438/2025 | Civil Judge Sr. Division | Ongoing |
| 15610/2026 | High Court | Ongoing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12603064 | Balasaheb Hiwarde | Casagrand Millenia Private Limited | 23/05/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 May 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 May 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 May 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 May 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 19 May 2029
Documents filed68
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: RERA 1-rotated_compressed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: RERA 1-rotated_compressed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form 2_Uploaded_compressed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form 2_Uploaded_compressed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Final CA_QPR Dec 2025.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Form 3_Uploaded_compressed.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 - QPR dec 2025_compressed.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: form -2_Signed.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Final CA_QPR Dec 2025.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Form-1_Architect Certificate-Q-2 (1).pdf | 20 Oct 2025 |
| Withdrawal Update Form 1File: Form-1_Architect Certificate-Q-2 (1).pdf | 20 Oct 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (2).pdf | 20 Oct 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (2).pdf | 20 Oct 2025 |
| Withdrawal Update Form 3File: mahaRERA CA certificate form 3 casagrand caladium (1)_compressed.pdf | 20 Oct 2025 |
| Withdrawal Update Form 3File: mahaRERA CA certificate form 3 casagrand caladium (1)_compressed.pdf | 20 Oct 2025 |
| Layout approvalFile: Plan_01 New.pdf | 16 May 2025 |
| Copy of Layout Approval (in case of layout)File: Plan_01 New.pdf | 16 May 2025 |
| Building plan approvalFile: Plan_01 Final.pdf | 13 May 2025 |
| Building plan approvalFile: Plan_02.pdf | 13 May 2025 |
| Building plan approvalFile: Plan_03.pdf | 13 May 2025 |
| Building plan approvalFile: Plan_04.pdf | 13 May 2025 |
| Building plan approvalFile: Plan_05.pdf | 13 May 2025 |
| Building plan approvalFile: Plan_06.pdf | 13 May 2025 |
| Building plan approvalFile: Plan_07.pdf | 13 May 2025 |
| Building plan approvalFile: Plan_08.pdf | 13 May 2025 |
| Building plan approvalFile: Plan_09.pdf | 13 May 2025 |
| Building plan approvalFile: Plan_10.pdf | 13 May 2025 |
| Building plan approvalFile: Plan_11.pdf | 13 May 2025 |
| Building plan approvalFile: Plan_12.pdf | 13 May 2025 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan_12.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan_11.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan_10.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan_09.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan_08.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan_07.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan_05.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan_04.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan_03.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan_02.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan_01 Final.pdf | 13 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan_06.pdf | 13 May 2025 |
| Other - LegalFile: 1.pdf | 13 May 2025 |
| Other - LegalFile: 2.pdf | 13 May 2025 |
| Other - LegalFile: 3.pdf | 13 May 2025 |
| Declaration about Commencement CertificateFile: Format D.pdf | 13 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CA Cert - converted.pdf | 12 May 2025 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 11 May 2025 |
| Declaration in FORM BFile: FORM B.pdf | 11 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Arch Cert.pdf | 11 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 11 May 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 11 May 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: PLOT area Clarification Letter.pdf | 11 May 2025 |
| Other - LegalFile: PLOT area Clarification Letter.pdf | 11 May 2025 |
| Deviation Report with respect to Allotment letterFile: Deviation_AL.pdf | 11 May 2025 |
| PAN CardFile: CASAGRAND MILLENIA PRIVATE LIMITED NEW PAN.pdf | 4 May 2025 |
| Details of encumbrances concerned to FinanceFile: Concerns Letter Finance.pdf | 4 May 2025 |
| Details of encumbrances concerned to FinanceFile: Concerns letter Legal.pdf | 4 May 2025 |
| CERSAI detailsFile: Undertaking CERsAI.pdf | 4 May 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf | 4 May 2025 |
| Details of encumbrances concerned to LegalFile: Concerns Letter Finance.pdf | 4 May 2025 |
| Details of encumbrances concerned to LegalFile: Concerns letter Legal.pdf | 4 May 2025 |
| Other - TechnicalFile: Decleration Cum Undertaking.pdf | 4 May 2025 |
| Deviation Report with respect to model copy of AgreementFile: Concerns Letter (1).pdf | 4 May 2025 |
| Proforma of Agreement for saleFile: Draft Agreement For Sale_Final.pdf | 4 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Intrest Discloser.pdf | 4 May 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Caladium Rera Bank letter.pdf | 4 May 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosed Finance Availble.pdf | 4 May 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- All 68 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Casagrand Caladium on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pune13,700+ in Pune
Yashwin Enchante Phase 2
Vilas Javdekar Infinitee Developers Pvt. L
Godrej Greens
DREAM WORLD LANDMARKS LLP
Yashwin Enchante Phase 1
Vilas Javdekar Infinitee Developers Pvt. L
Kohinoor Kaleido
Intofinity Promoters Private Limited
VIJAY VIHAR
COL. RPS RAWAT
FLAMANTE BY VTP LUXE PHASE 1
INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMI
Builder: Casagrand Millenia Private Limited
Casagrand Millenia Private Limited has 1 registration on MahaRERA, including Casagrand Caladium. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Casagrand Caladium is delayed beyond 19 May 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Casagrand Caladium?
The registered promoter entity is Casagrand Millenia Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Casagrand Caladium?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Casagrand Caladium?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Casagrand Caladium?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Casagrand Caladium?
The professionals named in the filing: Architect: Vikas Achalkar; Architect: L Madan; Engineer: Mr. Jagadish Purushothaman; Chartered Accountant: Narayana Rao M. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Casagrand Caladium?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback