Home / Browse projects / Nashik, Maharashtra / Casa Bella Homes
Casa Bella Homes
RG-MH-98973 · RERA P51600048790 · Last updated on MahaRERA portal: 29 Dec 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Casa Bella Homes is a Residential / Group Housing project by Jayashri Chintaman Patil in Nashik, Maharashtra, registered with MahaRERA as P51600048790 on 17 Jan 2023. The registration is recorded completed; possession was promised by 31 Dec 2025. 17 of the 22 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameCasa Bella Homes
- TypeResidential / Group Housing
- Location
- Professor Colony
- Balwant Nagar
- Behind Wisdom High School
- Nashik
- 422013
- Pincode422013
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600048790
- ReraGenie IDRG-MH-98973
Builder
- NameJayashri Chintaman Patil
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on17 Jan 2023
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed102 files
Current status
Figures as on 29 Dec 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Casa Bella Homes | NA | 8 | 7 | 22 | 0 | 22 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 75%.
Casa Bella Homes: 57% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 29 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed52
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership4
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Vijaya Pratap Shelke | Pimpalgaon Baswant | Nashik |
| Shreeya Pratap Shelke | Pimpalgaon Baswant | Nashik |
| Shruti Pratap Shelke | Pimpalgaon Baswant | Nashik |
| Jayashri Chintaman Patil | Nashik | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Casa Bella Homes | NA | Rs 2.31 cr | Rs 2.08 cr |
| - | NA | Rs 7.00 lakh | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Hrishikesh Pawar |
| Engineer | R N Singh |
| Engineer | Sagar Shailesh Shah |
| Chartered Accountant | Nirav Shah |
| Chartered Accountant | Saril Shah |
| Partner | Role in project |
|---|---|
| Jayashri Chintaman Patil | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Dec 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Dec 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed102
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 25-26 Q2.pdf | 29 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 25-26 Q2.pdf | 29 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 SD 25-26 Q2.pdf | 29 Dec 2025 |
| Occupational CertificateFile: Full OC.pdf | 29 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 25-26 Q1.pdf | 8 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 25-26 Q1.pdf | 8 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 SD 25-26 Q1.pdf | 8 Oct 2025 |
| Form 5 (FY 2022-2023)File: FY 2022-23.pdf | 7 Oct 2025 |
| Form 5 (FY 2023-2024)File: Form 5 - 2023-24.pdf | 7 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 - 2024-25.pdf | 7 Oct 2025 |
| Form 1File: Form 1.pdf | 20 Sep 2025 |
| Form 2File: Form 2.pdf | 20 Sep 2025 |
| Form 3File: Form 3 Declaration.pdf | 20 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold or Booked Inventory.pdf | 20 Sep 2025 |
| Form 1File: Form 1.pdf | 20 Sep 2025 |
| Form 2File: Form 2.pdf | 20 Sep 2025 |
| Form 3File: Form 3 Declaration.pdf | 20 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold or Booked Inventory.pdf | 20 Sep 2025 |
| Form 1File: Form 1 Q2.pdf | 20 Sep 2025 |
| Form 2File: Form 2 Q2.pdf | 20 Sep 2025 |
| Form 3File: Form 3 SD Q2.pdf | 20 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Q2.pdf | 20 Sep 2025 |
| Form 1File: Form 1 Q3.pdf | 20 Sep 2025 |
| Form 2File: Form 2 Q3.pdf | 20 Sep 2025 |
| Form 3File: Form 3 SD Q3.pdf | 20 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold Inventory Q3.pdf | 20 Sep 2025 |
| Form 1File: Form 1 2024-25 Q4.pdf | 20 Sep 2025 |
| Form 2File: Form 2 2023-24 Q4.pdf | 20 Sep 2025 |
| Form 3File: Form 3 SC 2023-24 Q4.pdf | 20 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold Inventory Q3.pdf | 20 Sep 2025 |
| Form 1File: Form 1 2024-25 Q1.pdf | 20 Sep 2025 |
| Form 2File: Form 2 2024-25 Q1.pdf | 20 Sep 2025 |
| Form 3File: Form 3 SC 2023-24 Q1.pdf | 20 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory 2024-25 Q3.pdf | 20 Sep 2025 |
| Form 1File: Form 1 2024-25 Q2.pdf | 20 Sep 2025 |
| Form 2File: Form 2 2024-25 Q2.pdf | 20 Sep 2025 |
| Form 3File: Form 3 SC 2023-24 Q2.pdf | 20 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory 2024-25 Q3.pdf | 20 Sep 2025 |
| Form 1File: Form 1 2024-25 Q3.pdf | 20 Sep 2025 |
| Form 2File: Form 2 2024-25 Q3.pdf | 20 Sep 2025 |
| Form 3File: Form 3 SC 2023-24 Q3.pdf | 20 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory 2024-25 Q3.pdf | 20 Sep 2025 |
| Form 1File: Form 1.pdf | 1 Jul 2025 |
| Form 2File: Form 2.pdf | 1 Jul 2025 |
| Form 3File: Form 3.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Q4.pdf | 1 Jul 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 1 Jul 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 1 Jul 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 1 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024-25 Q4.pdf | 10 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024-25 Q1.pdf | 10 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024-25 Q2.pdf | 10 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024-25 Q3.pdf | 10 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SC 2023-24 Q4.pdf | 10 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SC 2023-24 Q1.pdf | 10 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SC 2023-24 Q2.pdf | 10 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SC 2023-24 Q3.pdf | 10 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2023-24 Q4.pdf | 10 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024-25 Q1.pdf | 10 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024-25 Q2.pdf | 10 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024-25 Q3.pdf | 10 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory 2024-25 Q3.pdf | 10 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 2024.pdf | 10 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - 2023-24.pdf | 10 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2.pdf | 13 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3.pdf | 13 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2.pdf | 13 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3.pdf | 13 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Q2.pdf | 13 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Inventory Q3.pdf | 13 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD Q2.pdf | 13 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD Q3.pdf | 13 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 30 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 30 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 30 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 30 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - 2023.pdf | 30 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold or Booked Inventory.pdf | 30 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Declaration.pdf | 30 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Declaration.pdf | 30 Aug 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 102 filed documents as one ZIP, foldered, with a manifest
Keep Casa Bella Homes on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Balwant Nagar, Behind Wisdom High School4,100+ in Nashik
Filed coordinates, straight-line distance. 102 registered projects within 2 km.
Samraat AmOzon
M/S Shweta Infrastructure & Housing (I) Pv
ELYSIAN
ROONGTA HOMES LLP
HAPPY LIFE AT APNA GHAR PHASE III
M/S Shweta Infrastructure & Housing (I) Pv
SKY53
SKY53
ROONGTA ROSEWOOD APARTMENT
SHREE TIRUMALA BUILDCON
ROONGTA EMINENCE APARTMENT
SHREE TIRUMALA BUILDCON
See every Nashik project, with the district possession charts
Builder: Jayashri Chintaman Patil
Jayashri Chintaman Patil has 1 registration on MahaRERA, including Casa Bella Homes. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if Casa Bella Homes is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Casa Bella Homes?
The registered promoter entity is Jayashri Chintaman Patil, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Casa Bella Homes?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Casa Bella Homes?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Casa Bella Homes?
The professionals named in the filing: Architect: Hrishikesh Pawar; Engineer: R N Singh; Engineer: Sagar Shailesh Shah; Chartered Accountant: Nirav Shah; Chartered Accountant: Saril Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Casa Bella Homes?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback