Home / Browse projects / Mumbai Suburban, Maharashtra / CAFER at L and T Realty Elixir Reserve
CAFER at L and T Realty Elixir Reserve
By Larsen & Toubro Ltd. (Realty Division)
RG-MH-58323 · RERA P51800034053 · Last updated on MahaRERA portal: 20 Apr 2025
Source: official MahaRERA filing
Red flags
- Litigation declared, 2 cases
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CAFER at L and T Realty Elixir Reserve is a Residential / Group Housing project by Larsen & Toubro Ltd. (Realty Division) in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800034053 on 17 Mar 2022. The registration is recorded completed; possession was promised by 30 Apr 2025.
At a glance
Project
- NameCAFER at L and T Realty Elixir Reserve
- TypeResidential / Group Housing
- Location
- Saki Vihar Road
- Powai
- Paspoli
- Kurla
- Mumbai Suburban
- 400072
- Pincode400072
- RERA no.P51800034053
- ReraGenie IDRG-MH-58323
Builder
- NameLarsen & Toubro Ltd. (Realty Division)
- Entity typeCompany
- CINL99999MH1946PLC004768
- GSTIN27AAACL0140P5ZF
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Chairman & Managing DirectorSekharipuram Narayanan Subrahmanyan
- President, Whole-time Director & CFORamamurthi Shankar Raman
- Whole-time Director & President (Energy)Subramanian Sudarsanam Sarma
- Whole time Director and Senior ExecutivesSudhindra Vasantrao Desai, Tharayil Madhava Das
- Whole-time Director & Senior ExecutiveAnil Vithal Parab
- Other registrations24 more →
- Completed7 of 25
- No longer live3 lapsed, de-registered or revoked
- Declared earlier projects30 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on17 Mar 2022
- Promised completion30 Apr 2025
- Revised completionNone
- Buildings1 building record
- Documents filed119 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| CAFER at L and T Realty Elixir Reserve | NA | 32 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 75%.
CAFER at L and T Realty Elixir Reserve: 21% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 30% |
| Podiums (if any) | 75% |
| Plinth | 30% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed273
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| Larsen & Toubro Ltd. (Realty Division) | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 2019/9486/2019 | HIGH COURT OF JUDICATURE AT BOMBAY | Petition is not admitted till date As per TC uploaded Title of Land is clear and marketable |
| 2019/9486/2019 | HIGH COURT | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Mar 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Mar 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 21 Mar 2025
Documents filed119
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Cafer.pdf | 20 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Cafer.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Cafer.pdf | 20 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory-Cafer.pdf | 20 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-Cafer.pdf | 20 Apr 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2465473_OC_signed.pdf | 21 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Cafer.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Cafer.pdf | 20 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-Cafer.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Cafer.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory-Cafer.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Cafer.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Cafer.pdf | 20 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-Cafer.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Cafer.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory-Cafer.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Cafer.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Cafer.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Cafer.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory-Cafer.pdf | 20 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-Cafer.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-T2-Cafer.pdf | 21 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-T2-Cafer.pdf | 21 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-T2-Cafer.pdf | 21 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA-Form-2-Cafer-Q2-FY 24-25.pdf | 19 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA-Form-2A-Cafer-Q2-FY 24-25.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Q2-FY-24-25-Cafer.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory-ER-Cafer.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA-Form-2-Cafer-Q2-FY 24-25.pdf | 19 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA-Form-2A-Cafer-Q2-FY 24-25.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Q2-FY-24-25-Cafer.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory-ER-Cafer.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Q2-FY-24-25-Cafer.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA-Form-2-Cafer-Q2-FY 24-25.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory-ER-Cafer.pdf | 19 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA-Form-2A-Cafer-Q2-FY 24-25.pdf | 19 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Tower Cafer.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Tower Cafer.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Tower Cafer.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Cafer Form 1.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: ER-T02-Cafer.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q1_FY 24-25_CAFER.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Caf- form 2.pdf | 19 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Cafer-2A.pdf | 19 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: ER Tower Cafer.pdf | 25 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Cafer_form 1 Mar'24.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 caf.pdf | 20 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A caf.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 with Table C_Q4_FY 2324_T2 CAFER.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- T2_Cafer.pdf | 26 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form -2A-T2_Cafer.pdf | 26 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Elixir_Cafer.pdf | 26 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Cafer.pdf | 26 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - T2-CAFER.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 Cafer.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Cafer_sold unsold.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 with Table C_Q2_FY 23-24_Cafer.pdf | 20 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Cafer.pdf | 30 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Cafer.pdf | 30 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - CAFER.PDF | 2 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Cafer.pdf | 2 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Cafer.pdf | 2 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: RERA Form 2 Cafer.pdf | 21 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Cafer.pdf | 21 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Cafer.pdf | 21 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC-Powai West Resi.pdf | 13 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Elixir Cafer.pdf | 14 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - CAFER.PDF | 21 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 with Table C_Cafer.pdf | 21 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 T2(Q4).pdf | 20 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A - CAFER-T2.pdf | 20 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 T2-Cafer.pdf | 20 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Cafer_compressed.pdf | 20 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 with Table C_Cafer_Q3_FY 22-23.pdf | 20 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_Cafer_dec22.PDF | 19 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CAFER_SEP22.pdf | 20 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_sep22CAFER .pdf | 19 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2_caferT2_SEP22.pdf | 19 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Sep22_Sold_cafer.pdf | 19 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Cafer Final.pdf | 5 Oct 2022 |
Promoter's earlier projects12
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Emerald Isle - T16P51800013504 | Kurla, Mumbai Suburban | 127 | Oct 2017 | Ongoing | Dec 2024Registered original: Dec 2023 | Not delivered |
| Test | Test | 1 | - | Ongoing | Nov 2024 | Not delivered |
| Emerald Isle - T15 | Saki Vihar Road Powai | 208 | - | Completed | Jun 2023 | Jun 2023 |
| Emerald Isle - T10 | Saki Vihar Road Powai | 203 | - | Completed | Jun 2023 | Jun 2023 |
| Emerald Isle - T9 | Saki Vihar Road Powai | 150 | - | Completed | Jun 2021 | Apr 2021 |
| Emerald Isle - T8 | Saki Vihar Road Powai | 72 | - | Completed | Dec 2018 | Dec 2018 |
| Emerald Isle - T7 | Saki Vihar Road Powai | 72 | - | Completed | Jun 2018 | Apr 2018 |
| Emerald Isle - T4, T5, T6 | Saki Vihar Road Powai | 371 | - | Completed | Jun 2018 | Sep 2017 |
| EMERALD ISLE TOWER 3 | LT Emerald Isle Near LT Business Park Saki Vihar Road Powai 400072 | 139 | - | Completed | Aug 2016 | Jul 2016 |
| EMERALD ISLE TOWER 2 | LT Emerald Isle Near LT Business Park Saki Vihar Road Powai 400072 | 93 | - | Completed | Aug 2016 | Jul 2016 |
| EMERALD ISLE TOWER 1 | LT Emerald Isle Near LT Business Park Saki Vihar Road Powai 400072 | 42 | - | Completed | Aug 2016 | Jul 2016 |
| Sanofi | Sanofi House No 117B Near L&T Business Park Saki Vihar Road Mumbai 400072 | 1 | - | Completed | Mar 2015 | Mar 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 24 other registrations, which the RERA portal never shows together
- All 119 filed documents as one ZIP, foldered, with a manifest
Keep CAFER at L and T Realty Elixir Reserve on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Powai6,700+ in Mumbai Suburban
AMARYLLIS TOWERS AND PLAZA
NAHAR BUILDERS LTD.
JANGID MEADOWS
JANGID HOME PVT LTD
NAHAR'S CHANDI VALLEY - PHASE I
NAHAR BUILDERS LIMITED
KABRA RESIDENCY PARK
AHINSA BUILDTECH PVT LTD
IBIS at L and T Realty Elixir Reserve
Larsen & Toubro Ltd. (Realty Division)
BARBET at L and T Realty Elixir Reserve
Larsen & Toubro Ltd. (Realty Division)
See every Mumbai Suburban project, with the district possession charts
Builder: Larsen & Toubro Ltd. (Realty Division)
Larsen & Toubro Ltd. (Realty Division) has 25 registrations on MahaRERA, including Emerald Isle - T7 and Emerald Isle - T8. Its filings disclose 30 earlier MahaRERA projects: declares 19 of 19 past projects completed on time. Litigation is declared on 14 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if CAFER at L and T Realty Elixir Reserve is delayed beyond 30 Apr 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CAFER at L and T Realty Elixir Reserve?
The registered promoter entity is Larsen & Toubro Ltd. (Realty Division), a company as per the filing. Its CIN L99999MH1946PLC004768 and GSTIN 27AAACL0140P5ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CAFER at L and T Realty Elixir Reserve?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for CAFER at L and T Realty Elixir Reserve?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in CAFER at L and T Realty Elixir Reserve?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback