Home / Browse projects / Mumbai Suburban, Maharashtra / Building on Sub plot - D, CTS No 101/B of village Goregaon

Registration lapsed No litigation declared Residential / Group Housing project

Building on Sub plot - D, CTS No 101/B of village Goregaon

By SKYLINE CONSTRUCTION CO.

RG-MH-10115 · RERA P51800007873 · Last updated on MahaRERA portal: 1 Mar 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 60 months past the filed date
  • 24 complaints at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Oct 2021Possession promised60 months past this date
0 of 11Construction stages donefurthest along: Basement (if any), 97%
24Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

Building on Sub plot - D, CTS No 101/B of village Goregaon is a Residential / Group Housing project by SKYLINE CONSTRUCTION CO. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800007873 on 18 Aug 2017. Possession was promised by 30 Oct 2021 and is now 60 months past that date. The completion date has moved by 24 months from the original filing. 24 complaints are on record with the regulator.

At a glance

Project

  • NameBuilding on Sub plot - D, CTS No 101/B of village Goregaon
  • TypeResidential / Group Housing
  • Location
    • Ram Mandir Road
    • Goregaon West
    • Borivali
    • Mumbai Suburban
    • 400062
  • Pincode400062
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800007873
  • ReraGenie IDRG-MH-10115

Builder

  • NameSKYLINE CONSTRUCTION CO.
  • Entity typeOthers
  • Named personAnubhav Anilkumar Aggarwal
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

60 months past promisethis monthRegisteredAug 2017First promiseOct 2019Revised toOct 2021

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on18 Aug 2017
  • Promised completion30 Oct 2021
  • Revised completionRevised to 30 Oct 2021 (originally 31 Oct 2019)
  • Buildings1 building record
  • Documents filed108 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RNA ExoticaNA500000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 97%.

RNA Exotica: 62% average across the applicable activities

ActivityProgress
Excavation95%
Basement (if any)97%
Podiums (if any)95%
Plinth97%
Stilt Floor95%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks78%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.8%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 1 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes75%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Covered Parking only RCCYes100%

Parking filed667

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots667
Closed/Covered667

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI34305.34
Proposed, not sanctioned34,305 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKalanagar Bandra Branch Mumbai 400 051

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS.V.Thakker & Associates License Surveyor
EngineerWhitby and Bird I Pvt Ltd Ramboll India Pvt Ltd
PartnerRole in project
SKYLINE CONSTRUCTION CO.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800002590Oct 2019 → Oct 2020

Reason as filed by the promoterThe Due date for Completion of Bldg. under Reference as per RERA was 31.10.2019.However the Commencement Certificate of Upper Four Floors was held up by MMRDA. The Application for CC was made in the Year 2015 & Subsequently in the Year 2017.However, inspite of follow up CC was not granted. Subsequently, after direction and intervention from Hon’ble High Court(copy of Order annexed),in a suit filed by “RNA EXOTICA FLAT PURCHASERS ASSOCIATION”, V/S “SKY LINE CONSTRUCTION CO.”, the CC for Upper 3 Floors were finally granted by MMRDA on 5.11.2018.(copy attached).Thus there was a delay of 23 months

Litigation declared16

CaseCourtStatus
CC/2214/2016/2016National Consumer Dispute Redressal Commission at New DelhiOpposite party to file written statement
High Court 2231/2016 Skyline Construction company and Ors/2017High CourtOther side Writ Petion
S C Suit no 5511 of 2003/2003Civil Court DindoshiFor Cross Examination
425 of 2017 Mr Mandar Shahade/2017High courtNotice of Motion for Hearing
CC006000000000459 of 2017 PREMAL B SHAH Anr Vs Skyline Construction Co/2017MahaRERA AuthorityInterim Order To maintain Status Quo wrt complainant flat and Present Status For Order
CC006000000000844 Mr Allaudin Shaikh Vs Skyline Construction Co/2017MahaRERA AuthorityFor Filing Reply
CC006000000001008 of 2017 Tanviira Sayyed Sarmalkar Vs Skyline Construction Co/2017MahaRERA AuthorityDisposed off
CC006000000001462 of 2017 RAMESHCHAND MAHESHWARI Vs Skyline Construction Co/2017MahaRERA AuthorityFor Filing Reply
CC006000000012667 Mayank Chemiplast pvt ltd/2017MahaRERA AuthorityFor filing reply
Suit no 1898 of 2005 Shivshakti Rahivasi Sangh Vs Skyline Construction Co/2005Dindoshi City Civil CourtFor Cross Examination
Suit No 548 of 2013 Vilas Laxman Chindarkar and 10 Ors Vs Skyline Construction Co and 2 Ors/2013Dindoshi City Civil CourtFor admission and Denial of Plaintiffs Documents
292/2017MAHA RERA AuthorityFor filing reply
NMSL1081 OF 2018 RNA Exotica falt Purcheasers Aossiation V/S Skyline Construction Co/2018High Court BombayFor filing Affidavit in Reply
RERA Appellate Tribunal CC006000000010424 OF 2018 Skyline Construction Co Vs Allaudin Shaikh/2018RERA Appellate TribunalOpposite party to file reply
RERA Appellate Tribunal Appeal no 06000000010331 of 2018 Skyline Construction Co Vs Mayank Chemi Plast/2018MAHA RERA AuthorityWe have only made declaration
Debt Recovery Tribunal I Court Mumbai OA No 323/2017 Axis Bank Vs Skyline Construction ors/2017Debt Recovery Tribunal I Court MumbaiRespondent to file reply

Complaints filed with MahaRERA24

Case no.ComplainantRespondentFiled
CC006000000000459PREMAL B SHAH AASHIYA B SHAHSKYLINE CONSTRUCTION CO13/09/2017
CC006000000171463Premal B ShahM/s Skyline construction co.15/11/2019
CC006000000000844Allaudin ShaikhSkyline Construction Co25/09/2017
CC006000000001008Tanviira Sayyed SarmalkarSKYLINE Construction Company29/10/2017
CC006000000001462RAMESHCHAND MAHESHWARI & ORSSKYLINE CONSTRUCTION CO.26/10/2017
CC006000000012667Mayank Chemiplast pvt.ltd.Skyline Construction Company29/12/2017
CC006000000057516Pooja MehtaSkyline Construction Company03/04/2019
CC006000000044464Skyline Construction CoMonica Singh10/05/2018
CC006000000055583Manish ModySkyline Construction Co.31/07/2018
CC006000000057101Vrajesh HirjeeSkyline Construction Co29/11/2018
CC006000000057100Raghvendra Shardaskyline construction co29/11/2018
CC006000000057597Raghvendra ShardaSkyline Construction Company08/01/2019
CC006000000079203NIVEDITHA SUNDARAM IYERSKYLINE CONSTRUCTION CO08/05/2019
CC006000000195643Santosh Laxman Tambe & Sonia Santosh TambeSkyline Construction Company15/01/2021
CC006000000194410Mrs. Sunita Anil KushwahaSkyline Construction Company15/10/2020
CC006000000161238BHUPENDRA DEVSINGH BANGARISKYLINE CONSTRUCTION COMPANY05/11/2019
CC006000000151226Rahul KhannaSkyline Construction Co11/10/2019
CC006000000161458NEETIKA BHATIASKYLINE CONSTRUCTION COMPANY07/11/2019
CC006000000171470Sanjay MaheshwariM/s Skyline Construction15/11/2019
CC006000000171942Suthesh NairSkyline Construction Company27/12/2019
CC006000000193226Alakananda Sujitkumar BiswasSkyline Construction Company24/05/2020
CC006000000195690SMRUTI SHEKHAR PANCHALSKYLINE CONSTRUCTION COMPANY10/02/2021
CC006000000196990Mrs UrmimalaSKYLINE CONSTRUCTION COMpany08/07/2021
CC006000000221119Anshu SinhalSkyline Construction Company05/08/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Apr 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Dec 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Nov 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Form 3 Exotica 19.pdf1 Mar 2024
Certificates of CA (Form 3)File: Form 3 Exotica 20.pdf1 Mar 2024
Certificates of CA (Form 3)File: Form 3 Exotica 2021.pdf1 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Exotica Form 2A 07-10-2021.pdf31 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Exotica 2019.pdf31 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Exotica 2020.pdf31 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Exotica 2021.pdf31 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5.pdf18 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Exotica.pdf11 Jun 2019
Commencement Certificates / NA Order for plotted developmentFile: Exotica CC upto 24th floor dtd 05 11 2018.pdf20 Nov 2018
Copy of the legal title reportFile: Project Exotica - One Page Title Report.pdf26 Apr 2018
Proforma of Allotment letterFile: Exotica master agreement.pdf17 Mar 2018
Building plan approvalFile: AMENDED_IOD_ Dt_11dec2017.pdf21 Dec 2017
Building Plan Approval (IOD)File: AMENDED_IOD_ Dt_11dec2017.pdf21 Dec 2017
Building plan approvalFile: 1_Block_Plan.pdf20 Dec 2017
Building plan approvalFile: 2_Lower_Basement_Plan.pdf20 Dec 2017
Building plan approvalFile: 3_Upper_Basement_Level.pdf20 Dec 2017
Building plan approvalFile: 4_Stilt_Floor_Plan.pdf20 Dec 2017
Building plan approvalFile: 5_1st Podium_(Car Parking_Flr_Plan.pdf20 Dec 2017
Building plan approvalFile: 6_2nd to 10th_Podium_Flr_Plan.pdf20 Dec 2017
Building plan approvalFile: 7_E_Deck_Level_Flr_Plan.pdf20 Dec 2017
Building plan approvalFile: 8_Typical_Flr_(1st to 2nd,4th to 9th,11th to 17th,19th to 23rd).pdf20 Dec 2017
Building plan approvalFile: 9_Area_diagram_(1st to 2nd,4th to 9th,11th to 17th,19th to 23rd).pdf20 Dec 2017
Building plan approvalFile: 10_3rd Floor_Plan.pdf20 Dec 2017
Building plan approvalFile: 11_Area_Diagram-Refuge_Flr_3rd Floor_Plan.pdf20 Dec 2017
Building plan approvalFile: 12_10th Floor_Plan.pdf20 Dec 2017
Building plan approvalFile: 13_Area_Diagram-Refuge_Flr_10rd Floor_Plan.pdf20 Dec 2017
Building plan approvalFile: 14_18th Floor_Plan.pdf20 Dec 2017
Building plan approvalFile: 15_Area_Diagram-Refuge_Flr_18rd Floor_Plan.pdf20 Dec 2017
Building plan approvalFile: 16_24th Floor_Plan.pdf20 Dec 2017
Building plan approvalFile: 17_25th Floor_Plan.pdf20 Dec 2017
Building plan approvalFile: 18_Terrace_Flr_Plan.pdf20 Dec 2017
Building plan approvalFile: 19_Section B-B.pdf20 Dec 2017
Building plan approvalFile: 20_Section C-C.pdf20 Dec 2017
Building Plan Approval (IOD)File: 1_Block_Plan.pdf20 Dec 2017
Building Plan Approval (IOD)File: 2_Lower_Basement_Plan.pdf20 Dec 2017
Building Plan Approval (IOD)File: 3_Upper_Basement_Level.pdf20 Dec 2017
Building Plan Approval (IOD)File: 4_Stilt_Floor_Plan.pdf20 Dec 2017
Building Plan Approval (IOD)File: 5_1st Podium_(Car Parking_Flr_Plan.pdf20 Dec 2017
Building Plan Approval (IOD)File: 6_2nd to 10th_Podium_Flr_Plan.pdf20 Dec 2017
Building Plan Approval (IOD)File: 7_E_Deck_Level_Flr_Plan.pdf20 Dec 2017
Building Plan Approval (IOD)File: 8_Typical_Flr_(1st to 2nd,4th to 9th,11th to 17th,19th to 23rd).pdf20 Dec 2017
Building Plan Approval (IOD)File: 9_Area_diagram_(1st to 2nd,4th to 9th,11th to 17th,19th to 23rd).pdf20 Dec 2017
Building Plan Approval (IOD)File: 10_3rd Floor_Plan.pdf20 Dec 2017
Building Plan Approval (IOD)File: 11_Area_Diagram-Refuge_Flr_3rd Floor_Plan.pdf20 Dec 2017
Building Plan Approval (IOD)File: 12_10th Floor_Plan.pdf20 Dec 2017
Building Plan Approval (IOD)File: 13_Area_Diagram-Refuge_Flr_10rd Floor_Plan.pdf20 Dec 2017
Building Plan Approval (IOD)File: 14_18th Floor_Plan.pdf20 Dec 2017
Building Plan Approval (IOD)File: 15_Area_Diagram-Refuge_Flr_18rd Floor_Plan.pdf20 Dec 2017
Building Plan Approval (IOD)File: 16_24th Floor_Plan.pdf20 Dec 2017
Building Plan Approval (IOD)File: 17_25th Floor_Plan.pdf20 Dec 2017
Building Plan Approval (IOD)File: 18_Terrace_Flr_Plan.pdf20 Dec 2017
Building Plan Approval (IOD)File: 19_Section B-B.pdf20 Dec 2017
Building Plan Approval (IOD)File: 20_Section C-C.pdf20 Dec 2017
Declaration in FORM BFile: Form B Exotica 22 Sept 2017.pdf22 Sep 2017
PAN CardFile: PAN Anubhav Aggarwal.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate of Exotica.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form 3 Exotica Pg 1 to 6.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form 3 Exotica Pg 7-12.pdf31 Jul 2017
OtherFile: Exotica Note.pdf31 Jul 2017
Details of encumbrancesFile: Exo encum.pdf30 Jul 2017
Details of encumbrancesFile: Exotica Index 2.pdf30 Jul 2017
Declaration in FORM BFile: Form B and DA of Exotica.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A certificate Exotica.pdf30 Jul 2017
Proforma of Allotment letterFile: Exotica.pdf30 Jul 2017
Building plan approvalFile: 0 AMENDED IOD dt 08 APRIL 2013.pdf26 Jul 2017
Building plan approvalFile: 1 Block Plan.pdf26 Jul 2017
Building plan approvalFile: 2 Lower Basement Plan.pdf26 Jul 2017
Building plan approvalFile: 3 Upper Basement Level.pdf26 Jul 2017
Building plan approvalFile: 4 Stilt Floor Plan.pdf26 Jul 2017
Building plan approvalFile: 5 1st Podium.pdf26 Jul 2017
Building plan approvalFile: 6 2nd to 10th Podium Flr Plan.pdf26 Jul 2017
Building plan approvalFile: 7 E Deck Level Flr Plan.pdf26 Jul 2017
Building plan approvalFile: 8 Typical Flr 1st to 2nd 6th to 9th 12th to 17th 21st to 24th 27th to 29th.pdf26 Jul 2017
Building plan approvalFile: 9 Area diagram 1st to 2nd 6th to 9th 12th to 17th 21st to 24th 27th to 29th.pdf26 Jul 2017
Building plan approvalFile: 10 3rd to 5th and 18th to 20th Floor Plan.pdf26 Jul 2017
Building plan approvalFile: 11 Area Diagram Refuge Flr 3rd to 5th and 18th to 20th Floor Plan.pdf26 Jul 2017
Building plan approvalFile: 12 10th 11th and 25th 26th Floor Plan.pdf26 Jul 2017
Building plan approvalFile: 13 Area diagram Refuge Flr 10th 11th 25th 26th and 30th Floor Plan.pdf26 Jul 2017
Building plan approvalFile: 14 30th Flr Plan.pdf26 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Building on Sub plot - D, CTS No 101/B of vi on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Goregaon West6,700+ in Mumbai Suburban

2 kmBuilding on Sub plot - DCompleted 137Lapsed / revoked 70Abeyance 1Other 136Dot size: filed unitsN

Filed coordinates, straight-line distance. 344 registered projects within 2 km.

Builder: SKYLINE CONSTRUCTION CO.

SKYLINE CONSTRUCTION CO. has 2 registrations on MahaRERA, including Building on Sub plot - D, CTS No 101/B of village Goregaon and Building on Sub Plot A CTS No 283 D pt 287 A pt 287 B 1 and 616 A at Kandivali West. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Building on Sub plot - D, CTS No 101/B of village Goregaon shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Building on Sub plot - D, CTS No 101/B of village Goregaon is delayed beyond 30 Oct 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Building on Sub plot - D, CTS No 101/B of village Goregaon?

The registered promoter entity is SKYLINE CONSTRUCTION CO., an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Building on Sub plot - D, CTS No 101/B of village Goregaon?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Building on Sub plot - D, CTS No 101/B of village Goregaon?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Building on Sub plot - D, CTS No 101/B of village Goregaon?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Building on Sub plot - D, CTS No 101/B of village Goregaon?

The professionals named in the filing: Architect: S.V.Thakker & Associates License Surveyor; Engineer: Whitby and Bird I Pvt Ltd Ramboll India Pvt Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Building on Sub plot - D, CTS No 101/B of village Goregaon?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Building on Sub plot - D, CTS No 101/B of village Goregaon. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Building on Sub plot - D, CTS No 101/B of vi to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.