Home / Browse projects / Mumbai City, Maharashtra / Building no 4 on portion of CTS no 442 part 444 part 447 part and 625 part

Registration lapsed No litigation declared Residential / Group Housing project

Building no 4 on portion of CTS no 442 part 444 part 447 part and 625 part

By EAST AND WEST BUILDERS

RG-MH-10421 · RERA P51900011167 · Last updated on MahaRERA portal: 12 Sep 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date
  • 12 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
1 of 11Construction stages donefurthest along: Excavation, 86%
12Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

Building no 4 on portion of CTS no 442 part 444 part 447 part and 625 part is a Residential / Group Housing project by EAST AND WEST BUILDERS in Mumbai City, Maharashtra, registered with MahaRERA as P51900011167 on 31 Aug 2017. Possession was promised by 30 Dec 2023 and is now 34 months past that date. 12 complaints are on record with the regulator.

At a glance

Project

  • NameBuilding no 4 on portion of CTS no 442 part 444 part 447 part and 625 part
  • TypeResidential / Group Housing
  • Location
    • Mumbai City
    • 400015
  • Pincode400015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900011167
  • ReraGenie IDRG-MH-10421

Builder

  • NameEAST AND WEST BUILDERS
  • Entity typeOthers
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

34 months past promisethis monthRegisteredAug 2017PromisedDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Aug 2017
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed89 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RNA MetropolisNA780000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 86%.

RNA Metropolis: 32% average across the applicable activities

ActivityProgress
Excavation86%
Basement (if any)75%
Podiums (if any)18%
Plinth75%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks1%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 12 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes15%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Covered Parking only RCCYes10%

Parking filed679

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots679
Closed/Covered679

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area15,415 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI55738.78
Proposed, not sanctioned26,239 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKalanagar Bandra Branch Mumbai 400 051

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAakar Architect & Consultant
EngineerSatish C Dhupelia
PartnerRole in project
EAST AND WEST BUILDERS-

Litigation declared30

CaseCourtStatus
CC/1729/2016/2016National Consumer Dispute Redressal Commission at New DelhiSince it is part heard the matter is adjourned for remaining arguments
CC/1112/2016/2016National Consumer Dispute Redressal Commission at New DelhiSince it is part heard the matter is adjourned for remaining arguments
CC/1115/2016/2016National Consumer Dispute Redressal Commission at New DelhiSince it is part heard the matter is adjourned for remaining arguments
CC/1116/2016/2016National Consumer Dispute Redressal Commission at New DelhiSince it is part heard the matter is adjourned for remaining arguments
CC/1114/2016/2016National Consumer Dispute Redressal Commission at New DelhiSince it is part heard the matter is adjourned for remaining arguments
CC/1110/2016/2016National Consumer Dispute Redressal Commission at New DelhiSince it is part heard the matter is adjourned for remaining arguments
CC/1108/2016/2016National Consumer Dispute Redressal Commission at New DelhiSince it is part heard the matter is adjourned for remaining arguments
CC/1107/2016/2016National Consumer Dispute Redressal Commission at New Delhilisted for final hearing along with other matters related to this very project
CC/1106/2016/2016National Consumer Dispute Redressal Commission at New DelhiSince it is part heard the matter is adjourned for remaining arguments
CC/1109/2016/2016National Consumer Dispute Redressal Commission at New DelhiSince it is part heard the matter is adjourned for remaining arguments
CC/1117/2016/2016National Consumer Dispute Redressal Commission at New DelhiSince it is part heard the matter is adjourned for remaining arguments
CC/1118/2016/2016National Consumer Dispute Redressal Commission at New DelhiSince it is part heard the matter is adjourned for remaining arguments
CC/1113/2016/2016National Consumer Dispute Redressal Commission at New DelhiSince it is part heard the matter is adjourned for remaining arguments
CC/1111/2016/2016National Consumer Dispute Redressal Commission at New DelhiSince it is part heard the matter is adjourned for remaining arguments
HC Petition 28 of 2016 for Reference/2017Arbitration Matter before ArbitratorCross Examination
CC/1355/2017/2017National Consumer Dispute Redressal Commission at New DelhiFiling affidavit within four weeks of order
CC/1364/2017 Mr Rohit Shetty Vs East West BUilders/2017National Consumer Dispute Redressal Commission at New DelhiFiling affidavit within four weeks of order
CC/1360/2017 Mr Frank Goveas and Mrs Asha Advani Vs East West BUilders/2017National Consumer Dispute Redressal Commission at New DelhiFiling affidavit within four weeks of order
CC/1357/2017 Mr Ameya Kate and Anr Vs East West builders/2017National Consumer Dispute Redressal Commission at New DelhiFiling affidavit within four weeks of order
CC/1367/2017 Mr Bhavesh Dhirajlal Sheth Vs East West builders/2017National Consumer Dispute Redressal Commission at New DelhiFiling affidavit within four weeks of order
CC/1365/2017 Mr Alan Ernest Barboza Anr Vs East West builders/2017National Consumer Dispute Redressal Commission at New DelhiFiling affidavit within four weeks of order
CC/1358/2017 Ms Armaity Mevawalla Anr Vs East West builders/2017National Consumer Dispute Redressal Commission at New DelhiFiling affidavit within four weeks of order
CC/1363/2017 Mr Surajmal Baldia Anr Vs East West builders/2017National Consumer Dispute Redressal Commission at New DelhiFiling affidavit within four weeks of order
CC/1359/2017 Mrs Munira Karwa Anr Vs East West builders/2017National Consumer Dispute Redressal Commission at New DelhiFiling affidavit within four weeks of order
CC/1356/2017 Mrs Madhavi Ohri Vs East West Builders/2017National Consumer Dispute Redressal Commission at New DelhiFiling affidavit within four weeks of order
CC/1361/2017 Mrs Shweta Shet Anr Vs East West builders/2017National Consumer Dispute Redressal Commission at New DelhiFiling affidavit within four weeks of order
CC/2311/2017 Mrs Preeti Lalwani Anr Vs East West builders/2017National Consumer Dispute Redressal Commission at New DelhiFiling affidavit within four weeks of order
CC006000000056095/2018MahaRERAAs per last order dated Twenty eigth November Twenty Eighteen passed by Chairperson Gautam Chatterje
CC006000000055306/2018MahaRERARespondent to file reply
CC006000000056790/2018MahaRERAFor Arguments

Complaints filed with MahaRERA12

Case no.ComplainantRespondentFiled
CC006000000012384Surya RawkaEast and West Builders13/12/2017
CC006000000055306Naeem MerchantAnubhav Anilkumar Aggarwal08/07/2018
CC006000000056095Amrita KaurEast and West Builders06/09/2018
CC006000000056225RAMAKRISHNA SHETTYEAST AND WEST BUILDERS03/02/2019
CC006000000056536Subramanian JayramEast and West Builders12/10/2018
CC006000000056790Shishir AgarwalEAST AND WEST BUILDERS31/10/2018
CC006000000079456Naman JainEast West Builders25/05/2019
CC006000000089649ALIRAZA HEMANIEAST AND WEST BUILDERS07/06/2019
CC006000000100538Swaminathan Subramanian and Nilanjana GulatiEast and West Builders - RNA Corp20/08/2019
CC006000000196118RNA METROPOLIS SEWRI FLAT BUYERS ASSOCIATIONM/S. EAST AND WEST BUILDERS24/02/2021
CC006000000344262Sarla and Anil Ramkumar GuptaEast and West Builders10/02/2023
CC12503556Farooq Khalid SiddiqiEAST AND WEST BUILDERS06/10/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18) (2).pdf12 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19).pdf12 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Metropolis 2019-20 -signed.pdf12 Sep 2023
Certificates of CA (Form 3)File: RNA metro Mar 21 Form 3_compressed.pdf12 Apr 2023
Certificates of CA (Form 3)File: RNA metro March 21 Annex_compressed.pdf12 Apr 2023
Certificates of CA (Form 3)File: RNA June 21 Form 3.pdf12 Apr 2023
Certificates of CA (Form 3)File: RNA June 21 Summary_compressed.pdf12 Apr 2023
Certificates of CA (Form 3)File: RNA Sept 21 Form 3.pdf12 Apr 2023
Certificates of CA (Form 3)File: RNA Sept 21 Summary_compressed.pdf12 Apr 2023
Certificates of CA (Form 3)File: RNA Dec 21 Form 3.pdf12 Apr 2023
Certificates of CA (Form 3)File: RNA Dec 21 Summary_compressed.pdf12 Apr 2023
Certificates of CA (Form 3)File: RNA Mar 22 Form 3.pdf12 Apr 2023
Certificates of CA (Form 3)File: RNA March 22 Summary_compressed.pdf12 Apr 2023
Certificates of CA (Form 3)File: RNA June 22 Form 3.pdf12 Apr 2023
Certificates of CA (Form 3)File: RNA June 22 Summary_compressed.pdf12 Apr 2023
Certificates of CA (Form 3)File: RNA Sept 22 Form 3.pdf12 Apr 2023
Certificates of CA (Form 3)File: RNA Sept 22 Summary_compressed.pdf12 Apr 2023
Certificates of CA (Form 3)File: RNA Dec 22 Form 3.pdf12 Apr 2023
Certificates of CA (Form 3)File: RNA Dec 22 Summary_compressed.pdf12 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate_Metropolis_mar2018.pdf11 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate_Metropolis_2019.pdf11 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate_Metropolis_2020.pdf11 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate_Metropolis_2021.pdf11 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate_Metropolis_2022.pdf11 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate_Metropolis_31122022.pdf11 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_s_Certificate___Form_2__from___UPTO_March2018.pdf11 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_s_Certificate___Form_2__march2019.pdf11 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_s_Certificate___Form_2_mar2020.pdf11 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_s_Certificate___Form_2__mar2021.pdf11 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_s_Certificate___Form_2__mar2022.pdf11 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_s_Certificate___Form_2__from_01042022_To_31122022.pdf11 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality_Assurance_Certificate_Form_2A 2019.pdf11 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality_Assurance_Certificate_Form_2__A_ 2020.pdf11 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality_Assurance_Certificate_Form_2__A_2021.pdf11 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality_Assurance_Certificate_Form_2__A_2022.pdf11 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality_Assurance_Certificate_Form_2__A__dec 2022.pdf11 Apr 2023
Certificates of CA (Form 3)File: Metropolis 2019.pdf11 Apr 2023
Certificates of CA (Form 3)File: Form 3 Metro 19.pdf11 Apr 2023
Certificates of CA (Form 3)File: RNA Metropolis Mar 20 form 3_compressed.pdf11 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: metropolis march 21 form 5.pdf11 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: metropolis form 5 march 22.pdf11 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 Metropolis 2019.pdf31 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Metropolis 2018.pdf31 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Metropolis 2019.pdf31 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate for Metropolis.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form 3 of Metropolis Pg 1 to 8.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form 3 of Metropolis Pg 9 to 16.pdf31 Jul 2017
OtherFile: METROPOLIS.pdf31 Jul 2017
Details of encumbrancesFile: Metropolis.pdf30 Jul 2017
Details of encumbrancesFile: 1.pdf30 Jul 2017
Details of encumbrancesFile: 2.pdf30 Jul 2017
Declaration in FORM BFile: Form B and DA of Metropolis.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A Certificate for Metropolis.pdf30 Jul 2017
Proforma of Allotment letterFile: Metropolis.pdf30 Jul 2017
Building plan approvalFile: 1 Location Plan dt 31 may 2014.pdf25 Jul 2017
Building plan approvalFile: 2 Lower Ground floor dt 31 May 2014.pdf25 Jul 2017
Building plan approvalFile: 3 Upper Ground Floor dt 31 May 2014.pdf25 Jul 2017
Building plan approvalFile: 4 5 park Ref and Typ1 to 4 park dt 31May 2014.pdf25 Jul 2017
Building plan approvalFile: 0 Amended IOA for Sale Bldg No4 dt 31 MAy 2014.pdf25 Jul 2017
Building plan approvalFile: 5 6 to 9 Parking Level Plan dt 31 May 2014.pdf25 Jul 2017
Building plan approvalFile: 6 Typical 11 and 10 Parking Level plan dt 31 May 2014.pdf25 Jul 2017
Building plan approvalFile: 7 Service Level Plan dt 31 May 2014.pdf25 Jul 2017
Building plan approvalFile: 8 Ref Fl and Fire Check of Wing A B C dt 31 May 2014.pdf25 Jul 2017
Building plan approvalFile: 9 Ref Fl and Typ Fl of Wing A B C dt 31 May 2014.pdf25 Jul 2017
Building plan approvalFile: 10 Area Diagram of Typical floor plan dt 31 May 2014.pdf25 Jul 2017
Building plan approvalFile: 11 Area Statement plan dt 31May 2014.pdf25 Jul 2017
Building plan approvalFile: 12 Section CC Plan dt 31 May 2014.pdf25 Jul 2017
Building plan approvalFile: 13 Section BB Plan dt 31 May 2014.pdf25 Jul 2017
Layout approvalFile: Amended Layout amalgamation subdivision No 1075 dt 16 July 2011.pdf25 Jul 2017
Layout approvalFile: Layout amalgamation subdivision plan dt 16 July 2011.pdf25 Jul 2017
PAN CardFile: PAN Anubhav Aggarwal.pdf25 Jul 2017
Copy of the legal title reportFile: Metropolis Report on Title VND dt 29 April.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: Amended Layout amalgamation subdivision No 1075 dt 16 July 2011.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout amalgamation subdivision plan dt 16 July 2011.pdf25 Jul 2017
Building Plan Approval (IOD)File: 0 Amended IOA for Sale Bldg No4 dt 31 MAy 2014.pdf25 Jul 2017
Building Plan Approval (IOD)File: 1 Location Plan dt 31 may 2014.pdf25 Jul 2017
Building Plan Approval (IOD)File: 2 Lower Ground floor dt 31 May 2014.pdf25 Jul 2017
Building Plan Approval (IOD)File: 3 Upper Ground Floor dt 31 May 2014.pdf25 Jul 2017
Building Plan Approval (IOD)File: 4 5 park Ref and Typ1 to 4 park dt 31May 2014.pdf25 Jul 2017
Building Plan Approval (IOD)File: 5 6 to 9 Parking Level Plan dt 31 May 2014.pdf25 Jul 2017

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is among them

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Building no 4 on portion of CTS no 442 part on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mumbai City780+ in Mumbai City

2 kmBuilding no 4 on portionCompleted 13Lapsed / revoked 10Other 27Dot size: filed unitsN

Filed coordinates, straight-line distance. 50 registered projects within 2 km.

Builder: EAST AND WEST BUILDERS

EAST AND WEST BUILDERS has 2 registrations on MahaRERA, including Building no 4 on portion of CTS no 442 part 444 part 447 part and 625 part and Building on portion of Sub plot D CTS no 625 A 4 625 B pt 627 A of Kandivali West Mumbai 67. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What does it mean that Building no 4 on portion of CTS no 442 part 444 part 447 part and 625 part shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Building no 4 on portion of CTS no 442 part 444 part 447 part and 625 part is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Building no 4 on portion of CTS no 442 part 444 part 447 part and 625 part?

The registered promoter entity is EAST AND WEST BUILDERS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Building no 4 on portion of CTS no 442 part 444 part 447 part and 625 part?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Building no 4 on portion of CTS no 442 part 444 part 447 part and 625 part?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Building no 4 on portion of CTS no 442 part 444 part 447 part and 625 part?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Building no 4 on portion of CTS no 442 part 444 part 447 part and 625 part?

The professionals named in the filing: Architect: Aakar Architect & Consultant; Engineer: Satish C Dhupelia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Building no 4 on portion of CTS no 442 part 444 part 447 part and 625 part?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Building no 4 on portion of CTS no 442 part 444 part 447 part and 625 part. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Building no 4 on portion of CTS no 442 part to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.