ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Building No 3 Wing A Epsilon

Registration lapsed No litigation declared Residential / Group Housing project

Building No 3 Wing A Epsilon

By SD Corporation Private Limited

RG-MH-20308 · RERA P51800004355 · Last updated on MahaRERA portal: 23 Feb 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 55 months past the filed date
  • 11 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2022Possession promised55 months past this date
5 of 11Construction stages donefurthest along: Podiums (if any), 88%
11Complaints at MahaRERAon this registration
Jump to the 99 documents Report an error

Building No 3 Wing A Epsilon is a Residential / Group Housing project by SD Corporation Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800004355 on 9 Aug 2017. Possession was promised by 30 Mar 2022 and is now 55 months past that date. 11 complaints are on record with the regulator.

At a glance

Project

  • NameBuilding No 3 Wing A Epsilon
  • TypeResidential / Group Housing
  • Location
    • Shyam Narayan Thakur Road
    • Thakur College
    • Borivali
    • Mumbai Suburban
    • 400101
  • Pincode400101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800004355
  • ReraGenie IDRG-MH-20308

Builder

  • NameSD Corporation Private Limited
  • Entity typeCompany
  • Other registrations3 more →
  • Completed3 of 4
  • No longer live1 lapsed, de-registered or revoked

Key dates

55 months past promisethis monthRegisteredAug 2017PromisedMar 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 Aug 2017
  • Promised completion30 Mar 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed99 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EpsilonNA520000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Feb 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 88%.

Epsilon: 86% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)88%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises88%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks87%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.76%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 23 Feb 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed302

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots302
Closed/Covered302

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,483 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI27768.97
Proposed, not sanctioned27,769 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor Industry House Opposite Ramon House 159 H T Parekh Marg Churchgate Mumbai 400020

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnil Kodkani
EngineerJW Consultants LLP
Chartered AccountantBhavesh Ramesh Nagda
PartnerRole in project
SD Corporation Private Limited-

Litigation declared1

CaseCourtStatus
1267/2009Mumbai High CourtPending for final hearing

Complaints filed with MahaRERA11

Case no.ComplainantRespondentFiled
CC006000000194313VIVEKKUMAR N JAGTAPAMIT DILIP THACKER05/10/2020
CC006000000198238SD Corp Pvt LtdKomal Nahar22/09/2021
CC006000000198239SD Corp Pvt LtdSanket R Relekar and Anr22/09/2021
CC006000000198454SD Corp Pvt LtdSoumitra Kumar De and Anr01/10/2021
CC006000000198327Kaushiki Rahul DwivediSD Corporation Pvt Ltd27/09/2021
CC006000000251568Srinivasan SivabalanSD Corporation Pvt Ltd06/07/2022
CC006000000251722Jay Pravinchandra MehtaS. D. Corporation Pvt. Ltd.04/07/2022
CC006000000292471Sanjay Ashok Kumar GoswamiSD Corp Pvt. Ltd.26/08/2022
CC006000000303097Govind Kumar GoyalS D Corporation Pvt. Ltd.19/10/2022
CC006000000333971Wahidul HasanS D Corporation Private Limited16/01/2023
CC006000000396793Ashish BhartiaS D Corporation Private Limited19/08/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Sep 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Sep 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Sep 2022

Documents filed99

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2 Certificates of CA (Form 5) (1).pdf23 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 3 Certificates of CA (Form 5) (1).pdf23 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 4 Certificates of CA (Form 5) (1).pdf23 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Epsilon.pdf21 Sep 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Samata Nagar Bldg No 3 Wing A Part OC Dt 21 09 2022.pdf21 Sep 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Epsilon Part OC.pdf22 Jul 2022
Disclosure of sold/ booked inventoryFile: RERA - Epsilon - Disclosure of Inventory - Mar 31, 2022.pdf22 Apr 2022
Disclosure of sold/ booked inventoryFile: Epsilon Dec 2021.pdf28 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Epsilon Dec 2021.pdf10 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance certificate - Epsilon Dec 2021.pdf10 Jan 2022
Certificates of CA (Form 5)File: Epsilon.pdf23 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Epsilon.pdf7 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate Epsilon.pdf6 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Bldg 3 Wing A.pdf5 Oct 2021
Disclosure of sold/ booked inventoryFile: Inventory Building No 3 Wing A Epsilon.pdf20 Aug 2021
Certificates of CA (Form 3)File: CA Certificate Form 3 epsilon June 21.pdf13 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate BldG No 3 Epsilon Wing A July 21.pdf6 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Epsilon June 2021.pdf6 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate Epsilon June 2021.pdf6 Aug 2021
Disclosure of sold/ booked inventoryFile: Epsilon RERA Disclosure of inventory Mar 2021.pdf9 Jul 2021
Certificates of CA (Form 3)File: CA Certificate Epsilon March 21.pdf9 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Epsilon March 21.pdf21 May 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Epsilon March 2021.pdf14 May 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Epsilon Dec 2020.pdf25 Mar 2021
Certificates of CA (Form 3)File: Epsilon CA Certificate December 2020.pdf24 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate For Bldg No 3 Wing 2 Epsilon Wing A 31 12 2020.pdf25 Jan 2021
Certificates of CA (Form 3)File: CA Certificate Epsilon June 2020 compressed.pdf2 Dec 2020
Certificates of CA (Form 3)File: CA Certificate Epsilon September 2020 compressed.pdf2 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Epsilon June 2020.pdf23 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Epsilon Sept 2020.pdf23 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Epsilon June 2020.pdf23 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Epsilon Sept 2020.pdf23 Nov 2020
OtherFile: Date Rectification - Epsilon.pdf21 Oct 2020
Certificates of CA (Form 5)File: Form 5 Epsilon.pdf30 Sep 2020
Certificates of CA (Form 3)File: CA Certificate Epsilon.pdf16 Sep 2020
Certificates of CA (Form 3)File: CA Certificate Epsilon.pdf15 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Epsilon March 2020.pdf1 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Epsilon March 2020.pdf1 Sep 2020
Details of Restarting of Construction work post lockdownFile: Head Post Covid Detail.pdf20 Jul 2020
Details of Restarting of Construction work post lockdownFile: Epsilon Head Post Covid Detail.pdf6 Jul 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Epsilon Architect Certificate Wing A.pdf26 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Epsilon.pdf26 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Epsilon.pdf4 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Epsilon_compressed (1).pdf4 Dec 2019
Certificates of CA (Form 3)File: CA Certificate Epsilon.pdf4 Dec 2019
Certificates of CA (Form 5)File: Epsilon.pdf30 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Epsilon.pdf20 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate- Epsilon June 2019-min.pdf20 Aug 2019
Certificates of CA (Form 3)File: CA Certificate Epsilon.pdf20 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate - Epsilon.pdf4 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Epsilon.pdf4 Mar 2019
Certificates of CA (Form 3)File: CA Certificate Epsilon.pdf4 Mar 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Epsilon -final.pdf5 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Epsilon -final.pdf5 Dec 2018
Certificates of CA (Form 3)File: CA Certificate Epsilon -final.pdf5 Dec 2018
Certificates of CA (Form 5)File: Epsilon - Form 5 - CA Certificate .pdf30 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Astron.pdf13 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Astron.pdf13 Aug 2018
Certificates of CA (Form 3)File: CA Certificate - Astron - Final.pdf13 Aug 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Epsilon.pdf28 May 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Epsilon.pdf28 May 2018
Certificates of CA (Form 3)File: CA Certificate - Epsilon.pdf28 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Epsilon 01.pdf26 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Epsilon.pdf26 Feb 2018
Certificates of CA (Form 3)File: CA Certificate - Epsilon 01.pdf26 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Epsilon.pdf5 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Epsilon.pdf5 Jan 2018
Certificates of CA (Form 3)File: CA certificate Epsilon.pdf5 Jan 2018
Building plan approvalFile: Amended IOD - 31-08-2017.pdf8 Sep 2017
Layout approvalFile: Amended Block Plan - Epsilon.pdf8 Sep 2017
Layout approvalFile: Amended Floor Plan - Epsilon.pdf8 Sep 2017
Copy of Layout Approval (in case of layout)File: Amended Block Plan - Epsilon.pdf8 Sep 2017
Copy of Layout Approval (in case of layout)File: Amended Floor Plan - Epsilon.pdf8 Sep 2017
Building Plan Approval (IOD)File: Amended IOD - 31-08-2017.pdf8 Sep 2017
Layout approvalFile: Proposed Block Plan.pdf24 Jul 2017
Layout approvalFile: Amended Block Plan.pdf24 Jul 2017
Building plan approvalFile: IOD.pdf24 Jul 2017
Layout approvalFile: Approved Block Plan.pdf24 Jul 2017
Layout approvalFile: Epsilon Floor Plan Proposed.pdf24 Jul 2017
PAN CardFile: Pan - S D Corporation.pdf24 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Building No 3 Wing A Epsilon on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Thakur College6,700+ in Mumbai Suburban

2 kmBuilding No 3 Wing A EpsCompleted 29Lapsed / revoked 24Other 64Dot size: filed unitsN

Filed coordinates, straight-line distance. 117 registered projects within 2 km.

Builder: SD Corporation Private Limited

SD Corporation Private Limited has 4 registrations on MahaRERA, including Building No. 2 Wings A and B Alpine and Wing B of Composite Building No 1 Imperial Edge. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Building No 3 Wing A Epsilon shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Building No 3 Wing A Epsilon is delayed beyond 30 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Building No 3 Wing A Epsilon?

The registered promoter entity is SD Corporation Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Building No 3 Wing A Epsilon?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Building No 3 Wing A Epsilon?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Building No 3 Wing A Epsilon?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Building No 3 Wing A Epsilon?

The professionals named in the filing: Architect: Anil Kodkani; Engineer: JW Consultants LLP; Chartered Accountant: Bhavesh Ramesh Nagda. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Building No 3 Wing A Epsilon?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Building No 3 Wing A Epsilon. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Building No 3 Wing A Epsilon to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.